Stainless Steel 304 Strut Channel Finish 2B

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 m.t.
Supply Capability:
1000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Stainless Steel 304 Strut Channel Finish 2B

Strut Channel  Detailed Specification Information:

High quality & reasonable Price, no need welding and punching, can use repeatedly, wide usage range, flexible for installation.


1. Standard thickness: 1.5mm, 2mm, 2.5mm,2.75mm, 3.0mm
2. Standard length: 2440mm, 3000mm, 5800mm, 6000mm and customized
3. Standard size: 41*21, 41*25, 41*41,41*62,41*72,41*82, back to back, 41*41.41*62,41*123 and so on

Other sizes be produced according to customer’s drawing.


Strut Channel Surface Finish:


Powder coated- BS-6497-1984, between 60 and 85 microns thick
♦ Hot Dipped Galvanized-for outdoor use to BS EN 1461-1999, between 60 and 80 microns thick
♦ Acid Washing or Electrolytic Polishing- for stainless cable basket tray use


Strut Channel System Advantages :


♥ High strength to cost ratio

♥ Completely adjustable

♥ No welding or drilling required

♥ Strut is re-usable

♥ One-inventory adaptable to many jobs

♥ Saw and wrench are the only tools needed


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Who knows the cable bridge of the various elbow production methods (the more comprehensive the better)
The generator uses a soft connection at the following points, and the rest is hardwired. . the generator terminal and bus connection; . the bus leads to the basis of the generator to other points; . the generator bus leads to the wall, . generator bus and equipment connection
Q:What is the parallel use of the power cable
Generally, the cables and cables are connected to each other
Q:What kind of video cable is it even more clear? The The Master! ~ ~
Its open structure not only allows the cable to maximize the ventilation and heat, save energy, optimize the cable performance, but also to prevent water, dust, debris of the child for the good wheat field mad mad sickle accumulation, bacteria is not easy to breed , More clean, reduce the risk of fire or other safety hazards These unique features bring surprises to Chinese customers 90% open space; high mechanical strength, easy to cut; can give full play to your imagination free configuration style; no screw nut; for the data cable The design of the annex; with a compelling carrying capacity; save space and time for customers than the traditional bridge to save 1/3 of the installation time; unique bending method, fast, beautiful; 1000 degrees Celsius high temperature can also be maintained for 90 minutes, Protection of the safety of the bridge, is the most certified bridge and so on If you need the most professional support, you can contact me wwwvichnetcom this online introduction of this product is very
Q:What is the difference between the BVV line and the BV line?
Upstairs did not understand the meaning of the question. Wire access control box is to set the length of the. The general requirements of the length of the land is not very high, the distribution box is particularly evident, many building distribution boxes are casually put the point line where the spare. Instruments and equipment on the electrical control box is a very high demand. In the line, from the terminal to the outlet hole is generally between the zigzag, tie tie, the length of the reservation line is about 1.5 times the width of the control box (about). This can be convenient after the replacement of components, maintenance and so on. Wiring is not like land with a direct cable access, but there are related technical requirements, such as anti-corrosion, anti-corrosion, and so on.
Q:Wire does not wear pipe, directly wipe the problem in the cement?
Puncture clips and T terminals need to remove the cable jacket, but the puncture clip does not peel off the cable core insulation layer, T terminal need to remove the cable core insulation layer. Puncture clip contact surface is small, firm degree of poor, simple and quick construction. T terminal contact surface is large, the installation is firm and reliable, but the construction is relatively difficult.
Q:The cable tray crosses the fire shutter door
In this short few minutes, the staff to escape, and sometimes smoke, can not see the ground, hit the fire shutter door under the threshold or slope, will such a situation happen? Delayed the escape time, there may be a fire shutter door again down and sealed in the fire scene The consequences to find you
Q:How the bridge slot is connected to the ladder
Press the remote control can be switched button, (that is, whether there is no picture in the painting button), press this button to achieve picture-in-picture function, but also to achieve whether the painting in the switch, while watching by painting , Only show the normal big screen so far.
Q:I buried the dark line when the tube with a 90 degree straight angle elbow, and now no way to wear through, may I ask what way to go through
Please refer to GB electrical installation installation cable construction and acceptance specifications 5.3 cable duct laying 5.3.1 in the following locations, the cable should have a certain mechanical strength of the protective tube or the installation of protective cover: 1 cable into the buildings, tunnels, Through the floor and the walls. 2 from the channel lead to the poles, equipment, wall surface or house pedestrians easy to close, from the ground height of 2m below a section. 3 may have a gear that has been above the cable section; 4 other places that may be subject to mechanical damage. 5.3.2 There should be no water inside the pipeline and no clogging. When wearing the cable, do not damage the protective layer, can be used non-corrosive lubricant (powder). 5.3.3 cable laying in the laying of cables, should be clear, remove debris. 5.3.4 The number of cables in the pipe should meet the design requirements; AC single-core cable shall not penetrate the steel pipe alone. 5.3 Laying of cables in cable ducts 5.3.1 In the following locations, the cable shall have a protective tube of mechanical strength or a protective cover: 1 cable into the building, tunnel, through the floor and the wall. 2 from the channel lead to the poles, equipment, wall surface or house pedestrians easy to close, from the ground height of 2m below a section. 3 may have a gear that has been above the cable section; 4 other places that may be subject to mechanical damage. 5.3.2 There should be no water inside the pipeline and no clogging. When wearing the cable, do not damage the protective layer, can be used non-corrosive lubricant (powder). 5.3.3 cable laying in the laying of cables, should be clear, remove debris. 5.3.4 The number of cables in the pipe should meet the design requirements; AC single-core cable shall not penetrate the steel pipe alone.
Q:Can high - voltage cables and low - voltage cables be placed on the same cable trench?
Unsafe. Weak and strong do not wear in the same line. Telephone, television, cable can be worn with a tube. Although the TV antenna is high frequency but with little impact on the shield. Use a good wire.
Q:How to put the sound on the computer to the TV
What interface do you use? Have you already used a monitor on your computer?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range