SS304 Stainless Steel Shower Handle HC-722

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Piece pc
Supply Capability:
100000 Pieces per Month pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

shower handle , Bathroom Accessories 

1. Small MOQ: 1 piece

2. Good quality with reasonable price

3.Factory direct pric 

 

1.Name:stainless   steel  handle,shower handle

 

2.Model No:HC-722

 

3.Place of origin:china

 

4.Material: ss 304  stainless   steel

 

5.Usage:Glass clamp,toughened glass door  thickness 8mm to 12mm thickness .

 

6.Finish:Mirror/Sand or customized .

 

7.Payment terms:30% deposit in advance,70% balance before deliver the goods .

 

8.Delivery time: It needs 15 to 30 days after receiving the deposit .

 

9.Offered brands or logo is accepted ,OEM is  welcomed

 

We always take the quality as the first consideration ,All the productions have to pass strict inspection before they go out .Any item  interest you ,please feel free to contact us .

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the price of a simple shower room? How to choose shower room?
To the shower room ten brands, choose from the inside to buy will not give people cheated, of course, to buy genuine can 1 Deli shower room 2 Ideal shower room 3 Plus maple shower room 4 Furui shower room 5 Jinsha SALLY 6 Lisa ROSERY 7 Apollo Appollo 8 Wrigley ARROW 9 Kohler shower room 10 Ou Lu Sha orans
Q:Shower room is how the tender, I need a template Oh, that kind of people to give you Oh
The preparation of tender documents should be prepared in strict accordance with the requirements of the tender documents, in fact, very well prepared tender documents, carefully read the tender documents, in accordance with the requirements of the tender documents and format to fill your company's own things just fine.
Q:Can the washing machine be placed next to the shower room (partition)?
If the partition can completely resist the water, then the washing machine can be placed next to the shower room. If the partition is a half cut off, or can not completely resist the water, then do not put it. That the washing machine power lines are generally shorter, the socket must be in the vicinity of the washing machine, if the bath when the mouth of the exposed water, it is more dangerous.
Q:When buying a shower room, the hardware handle, chute or not to calculate the other
The complete shower room includes a variety of accessories. But some products can provide a variety of accessories to choose from, then the annex and the subject will be separately priced. For example, if the handle with stainless steel, copper, gold plating a variety of options, the price is certainly different, only another operator. As long as the time to buy clearly, when considering the total price, you can.
Q:What is the size of the bathroom from the shower room and the outlet?
This look at how much you use the shower room, the general pipe before the connection should be good, or installed in the toilet where the mouth is generally 40cm, and talked about and let the floor from the ground to leak out
Q:Shower structure
The shower room is made of tempered glass, pulley or hinge, fixed connection or bracket, ceiling cover and base (simple type not) So according to the function of the whole shower room and simple shower room; according to the style of split angle shower room, a halo bath screen, circular shower room, bath bath screen, etc .; according to the shape of the chassis square, full round, fan, Diamond-shaped shower room, etc .; according to the door structure sliding door, folding door, open the door and so on. The overall shower room features more, the price is higher, generally can not be customized. Compared with the whole shower room, the simple shower room is not "roof", rich style, its basic structure is the bottom basin or artificial stone bottom or natural stone bottom, bottom basin texture of ceramics, acrylic, artificial stone, Bottom basin to install plastic or tempered glass shower room, tempered glass doors are ordinary tempered glass, high quality tempered glass, water riveting glass and cloth pattern tempered glass and other materials. Some shower room with blasting gold or sandblasting silver process, the color of luxury. But usually, the number of users who make transparent glass is still the largest number, because the tempered glass surface if you do other treatment, will reduce the glass quality level. In order to reduce the rejection rate, usually the steel plant in the steel can not be all steel, but the use of semi-steel processing, which increases the user's use of the risk.
Q:What is the size of the shower room?
The request is to enter the shower room when people have to have enough space, can not have the feeling of space constraints; installed screen, then the standard size of the width of 1000-1600, if you want to be wider, then increase the stainless steel or aluminum The width and thickness of the material, the height between 1600-2200, this should be related to the load-bearing and stability of the problem, installed other like a curved / diamond-shaped bath room, then the standard size is generally 900 * 900 or 1000 * 1000, the larger can, that is, non-standard made to do, there are also shaped, are the actual size of the security to do, as long as do not seem too crowded on it.
Q:Does anyone know how to compare the shower room?
Comparison, design and quality, in both these are better, Rose Island is very good.
Q:Bathroom shower room bath, downstairs sewer near the floor of the water seepage
The drain and sewer joints are partially leaking, or the sewer is broken. It is likely that the pipeline is blocked from the water, clean up after the proposed no damage to the case of tiles will be gently knock down the ground down, slowly knocked around the cement, you can see the sewer interface, if it is leaking here, with cement Mix 107 glue backfill can be. After the use of regularly clean up the sewer, because the bath can easily plug the pipeline.
Q:Shower room to do when to pay attention to what?
Shower room installation of a lot of attention, you can go to the shower room forum or shower room business website, such as Leibo Dayton shower room site. Here I will briefly say a few points, in fact, there are many, the general manufacturers will tell you. 1, shower room size of the embedded hole should be installed in the bathroom before the first design is good. 2, has been installed water supply system and the best custom-made shower room. 3, wiring leakage protection switch device should be considered in the shower room before the installation, so as not to rework. 4, shower room style according to the toilet layout may be, there are common angle and a font. 5, the installation of shower room should be installed in strict accordance with the assembly process. 6, shower room must be firmly connected with the building structure, can not shake. 7, the appearance of the shower room after installation should be clean and bright, sliding doors and sliding doors parallel to each other or vertical, symmetrical, sliding door to open and close smooth, seamless, impermeable, shower room and bottom basin sealed with silicone seal
Our production equipment and processes are in the leading level in China. Our company takes talents as the first element of our enterprise. We have invited competent industrial elites and a great number of professional technicians. Our professional team actively assimilates the advanced building hardware design concept of the West, keeps in pace with the trend of fashion and tries to satisfy customer demand.

1. Manufacturer Overview

Location Guangdong,China
Year Established 2010
Annual Output Value
Main Markets North America
Eastern Europe
Southeast Asia
Mid East
Southern Europe
Company Certifications ISO 9001:2000

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage 71% - 80%
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size: 5,000-10,000 square meters
No. of Production Lines 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered .
Product Price Range