Speed Building hoist (Middle speed) with CE and ISO9001 Approved

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
100 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Speed Building hoist (Middle speed) with CE and ISO9001 Approved

 

Descriptions of our building hoist:

1. Adopt the most advanced VVVF speed control system.

2. Have the over-voltage protection,low--voltage protection,over-current ,over-load and over speed protection functions.the system adopts special software for hoists,making the operation safe and reliable.

3. Driver's working intensity has been reduced, which avoids operating errors and improves the safety of machine.

Builiding hoist provides the high quality and safety building hoist with single cage and twin cage to the customers, the capacity of cage is from 1000kg,1200kg, 2000kg,2700kg,3200kg, and with direct motor driven and frequency conversion driven to reach the lower speed of 36 m/min, middle speed 0-63m/min and high speed 0-96m/min. And also provide the different dimension of cage to satisfy the special demand from the customers.

Building hoist provides the high quality and safety building hoist with single cage and twin cage to the customers, the capacity of cage is from 1000kg,1200kg, 2000kg,2700kg,3200kg, and with direct motor driven and frequency conversion driven to reach the lower speed of 36 m/min, middle speed 0-63m/min and high speed 0-96m/min. And also provide the different dimension of cage to satisfy the special demand from the customers

 

Main Features of Building Material Hoist 

1. With complete advanced safety device, national standard anti-dropping tripper
2. Drive unit equips on top of cage, large bearing space in cage
3. Adopt three drive system, big bearing capacity
4. Stable attached device, safe and reliable.
5. Smooth transmission, small vibration, comfortable ride
6. Light & reasonable structure, easy for maintenance and assembly
7. Drive system adopts three motors drive type, which makes the gears and rack with uniform stress, safe & stable
8. To guarantee safe working of hoist, safe switches of overload & speed-limit functions in circuit. While accidents happen as above, the hoist can avoid such accidents immediately and automatically. There’re limit switches in any door of cages; Once any door opens abnormally, the cage can’t be started or stop running immediately
9. There’re anti-dropping stripper equips on every cage, which can prevent dropping effectively, to make hoist work safely
10. Electric control system of hoist with simple circuit, easy for operation and maintenance, and reliable
11. Steel structure design is with accurate calculation, which makes the hoist with reasonable structure, reliable strength and light weight
12. The rail of hoist can be assembled or disassembled by customers themselves by suspender. And other parts can be assembled or disambled easily, the components can be replaced as well.

 

Advantage of our building hoist:

1. Our own systems of production engineering.

2. Production design from the concept to the engineering details.

3. Technical experts with great experience in the sector.

4. Continuous development of new solutions and products adapted to the requirements of our clients.

5. Methodology and project procedure administration in compliance with current guidelines.

6. Extensive worldwide commercial network

 

Specification of our building hoist:

 

Model

SC200

SC200/200

SC100

SC100/100

Rated Capacity (kg)

2000

2x2000

1000

2x1000

Rated Hoist Speed (m/min)

36

36

32

36

Max. sling Height (m)

200

200

200

200

Motor Power (kw)

3x11

2x3x11

2x11

2x2x11

Cage Inner Dimension (m)

3x1.3x2.5

3x1.5x2.5

3x1.3x2.5

3x1.5x2.5

Cage Weight (kg)

1400

1400

1400

1400

Mast Section Weight (kg)

163

163

163

163

Mast Section Spec (mm)

1508x650x650

1508x650x650

1508x650x650

1508x650x650

Steeve Rated Sling Weight (kg)

180

180

180

180

Bottom Cage Exterior Dimension (mm)

3100x4200

3100x4200

3100x4200

3100x4200

 

 

sc200/200 3*2*11kw building electric hoist

sc200/200 3*2*11kw building electric hoist

sc200/200 3*2*11kw building electric hoist

sc200/200 3*2*11kw building electric hoist

sc200/200 3*2*11kw building electric hoist

Production line 

 

 

 FAQ

  1. 1.      why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period. 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many guides are in the construction elevator
1 guide frame is 1508cm, the highest can be 400 meters
Q:Can construction elevators be taken by people or by goods
The construction elevator can be taken either by person or by cargo Material hoist (dragon door frame, well frame) can be carried only, not by person
Q:The calculation of the use of electricity in the construction elevator
Try using the security software. There is a cracked version
Q:How does the elevator operate
The application of the construction elevator has gained popularity over the years, and has attracted many employees. The construction elevator is a highly skilled industry, so it is required that the professionals must master certain expertise. Here is a knowledge of how to operate a lift machine, hoping to help you.
Q:Does the new approach builder need a localizer test report
Need, not for safety device testing qualified report, inspection agency will not issue the inspection report, in the construction of elevator installation supervision and inspection report, there is a specifically for, for safety device must have testing qualified report, to be certified.
Q:Do the elevator need to be installed when the main project is in construction
Installation, of course. The general building should be installed at about 10 meters on the 4th floor, or the person will go up and down the time is dangerous, and there will be some materials that can't be carried by the tower, too slowly
Q:How to save the elevator accident
The elevator is an important vehicle in high-rise buildings, and if a failure occurs, passengers may be trapped, falling, and other hazardous accidents. Emergency point When the elevator is not normal, the legs are slightly bent and the upper body is tilted forward to cope with the possible impact. When the elevator is suddenly stopped, don't walk out the door easily, in case the elevator suddenly starts. When trapped in an elevator, stay calm and immediately use an elevator alarm bell, a walkie-talkie or telephone to contact with the relevant personnel and wait for outside help. If the alarm doesn't work, you can call loudly or intermittently tap the elevator door. If a fire broke out on the way, the elevator should stop at the nearest floor and escape quickly from the stairs.
Q:How to adjust the weight limit of the construction elevator
You're talking about a weight monitor! There are a lot of models and not a good idea.
Q:Construction site construction elevator and tower crane, which unit security check and acceptance?
Different but most likely is the construction elevator
Q:What are the requirements for the construction elevator
Actually good or bad for safety device can only judge by test and inspection in the daily operation is not sure whether it is good or bad, for those who are serving for safety device, or advice for the earlier inspection and regular test, only accomplish know fairly well, to malignant accident prevention rather than cure.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range