Solar Panel Mounting Brackets

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications

Solar Panel Mounting Brackets
1.Material:prefab C,U section steel
2.Surface:Hot dip galvanized
3.Size:as clients's requests.

 

Galvanized Solar Panel Mounting Brackets

 

Material

Galvanized fabricated low carbon steel

Zinc coating

270-600g/ m²

Design snow Load

1.5KN/m²

Design wind Load

55m/s or 200km/h

Angle of elevation

0°-45°

Production Standard

TUV, GB/5237-2008

Design Standard

AS/NZS 170

 

Main Features

1.Material:prefab C,U section steel,steel tubes
2.Surface:Hot dip galvanized
3.Size:as clients's requiremens

4.Price: reasonable price

 

Packaging & Delivery

Packaging Detail: standard export packing

Delivery Detail: 20-30days

 

FAQ

Q1:Can we visit your factory?

A1:Sure,welcome at any time,seeing is believing.

 

Q2:Which payment terms can you accept?

A2:T/T,L/C,Moneygram,Paypal are available for us.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the hidden dangers of solar PV systems? It is best to classify, such as stents, inverters.
Controller design charge and discharge circuit designed over-current protection (plus insurance); inverter output lightning protection, overcurrent protection; bracket can withstand more than 12 typhoons; battery low temperature and high temperature protection.
Q:What are the characteristics of the hydraulic support hydraulic system?
The system of the solenoid valve, but also consider the system of the media, because it is not flammable; second, in these places must ensure that the equipment in the absence of power in the case will not happen, such as hydraulic cylinder return, hydraulic motor
Q:How does the hydraulic support work
Stent used by the valve group, column, jack, are not allowed in the underground demolition inspection, the overall replacement. Replace the cylinder as far as possible before the shortest, the joints should be installed on the dust cap
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Installation preparation → prefabricated → trunk installation → riser installation → pipe installation → pipe pressure test → pipe flush → pipe corrosion and insulation.
Q:What is the full support system
A construction method, to take a certain interval, dense erection, from the role of the scaffolding construction method. Currently common in the construction of cast-in-place bridges and cast-in-place floor construction.
Q:Fire spray installation in the anti-swing stent approach?
5 when the nominal diameter of the pipe is equal to or greater than 50mm, each section of the water main pipe or water distribution pipe should not be less than one bracket, and the anti-swing bracket should not be greater than 15m spacing; when the pipeline changes direction,
Q:Is the template and stent two or one?
The requirements of the stent support: stable, will not be displaced due to pouring and vibrating, bearing capacity, can support the weight of the board after pouring, and demolition of all the pouring parts on the load, safe, will not collapse, or fall Wounding.
Q:What is a finished hanger?
Finished hanger is used for suspension and support equipment, pipelines and other facilities of the auxiliary system, all of its components are in the factory prefabricated production, construction site direct installation and construction. Assembled building pipelines The hanger system can carry a variety of static and dynamic loads in the building to ensure the safety of the building system
Q:What is the metal material for the RESOLUTE bracket?
Drug-eluting stent implanted in the human blood vessels, the stent to block the blood vessels to support the same time, the drug will be released within a certain period of time from the stent, eluting into the arterial tissue to play the role of inhibition of smooth muscle hyperplasia, so as to effectively prevent the stent site again Clogging (clinically referred to as "restenosis").
Q:What is a high-profile template system?
Erection height of 8m and above; erected span of 18m and above; construction of the total load of 15kN / m2 and above; concentration line load 20kN / m and above for the "more than a certain size of the larger part of the sub-

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing