Solar Panel Mounting Brackets

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications

Solar Panel Mounting Brackets
1.Material:prefab C,U section steel
2.Surface:Hot dip galvanized
3.Size:as clients's requests.

 

Galvanized Solar Panel Mounting Brackets

 

Material

Galvanized fabricated low carbon steel

Zinc coating

270-600g/ m²

Design snow Load

1.5KN/m²

Design wind Load

55m/s or 200km/h

Angle of elevation

0°-45°

Production Standard

TUV, GB/5237-2008

Design Standard

AS/NZS 170

 

Main Features

1.Material:prefab C,U section steel,steel tubes
2.Surface:Hot dip galvanized
3.Size:as clients's requiremens

4.Price: reasonable price

 

Packaging & Delivery

Packaging Detail: standard export packing

Delivery Detail: 20-30days

 

FAQ

Q1:Can we visit your factory?

A1:Sure,welcome at any time,seeing is believing.

 

Q2:Which payment terms can you accept?

A2:T/T,L/C,Moneygram,Paypal are available for us.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Fire spray installation in the anti-swing stent approach?
5 when the nominal diameter of the pipe is equal to or greater than 50mm, each section of the water main pipe or water distribution pipe should not be less than one bracket, and the anti-swing bracket should not be greater than 15m spacing; when the pipeline changes direction,
Q:What is the solar stent system?
Concept: In order to maximize the power output of the entire photovoltaic power generation system, combined with the geographical, climatic and solar resource conditions of the construction site, the support structure of the solar modules in a certain orientation, arrangement and spacing is usually a steel structure and an aluminum alloy
Q:What is a finished stent?
A little bit of conflict is normal, it is estimated that after 3 months will come, but do not know what happens after 3 months I am also Zeyi the whole ah? I am also ah I was the same problem. The The I am also so I am also
Q:What is the metal material for the RESOLUTE bracket?
If the core of the stent is a lipophilic molecule, it is compatible and firmly wrapped in drugs, in 6 months and longer time a small amount of uniform release of drugs to ensure sustained and stable drug stent effect.
Q:How does the hydraulic support work
these actions by the emulsion pump Station supply of high-pressure liquid, through a variety of valve control column, jack to achieve the expansion and contraction.
Q:What is the support frame at the bottom of the car?
The assembly is called a steel plate spring suspension, and the leaf spring is used as a resilient element of a non-independent suspension, and the suspension system is greatly simplified due to its role as a guide mechanism.
Q:What is a high-profile template system?
Large template support system refers to the construction of the construction site concrete component template support height of more than 8m, or erection span of more than 18m, or the total load of more than 15kN / ㎡, or concentrated line load greater than 20kN / m template support system.
Q:What are the benefits of finished stents?
Through the assembly of different parts can be flexible with a variety of production needs of the design to meet a variety of construction environment.
Q:What is the full support system
Full scaffolding is mainly used for large single-storey building, exhibition hall, gymnasium and other high-rise, large building between the top of the building decoration and structural construction, must contain pole, bar, bracing, scissors support.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Construction and construction related to the installation of the pipeline has been basically completed, and the acceptance of qualified, and to provide the necessary information to the installation unit to meet the installation requirements. The associated device is installed in place.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range