Solar Panel Monting System TT-SK-03

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
50万套 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

PV Mounting brackets are special solar photovoltaic systemfor placing, installing, fixing the solar panel design. Generally materials arealuminum, steel structure, stainless steel. PV mounting products at groundmounting system, flat roof mounting system, adjustable angle roof rack system,inclined roof rack system, column bracket system.

The Ground Mounting System including concret basement sysytemand steel pipe sysytem, Titanergy provides total solution for flat or pitchedroof with patent products.On the basis of the given project data, specificnational standards and guidelines, Titanergy will calculate the completestructural analysis and create a complete project plan to make sure reliablestructural safety.We provide high quality HDG steel and aluminum products forthe ground mounting sysytem,witch can make sure the security and durability ofthe project.

Features and Advantages

n  The rail bracket is easy to install, just use simple tools(eg, Allen wrench) can be easily installed. Rail connecting member can freelyadjust the length, the stent may be pre-installed on the roof, and thenappropriately adjusted according to the size of the solar panel.

n  The combination of strong, aluminum rails and card blocks fora variety of venues and a variety of materials roofs (such as metal, ceramicand other kinds of tile surface)

n  Component compatibility, and rail can meet PV modules fromdifferent manufacturers.

n  accuracy, the length of the rail to the nearest millimeter,the construction process, not because of the length is too long or too shortfor the second cut.

n  flexible assembly, rail hooks can adjust the spacing modulearray and tile has been installed successfully address the uneven roofconstruction led to difficult problems.

n  design standards, product design and development process instrict accordance with GB, the German standards and other internationalstandards to ensure products reach the world advanced level.

n  Quality assurance, the stent main material is high-qualityaluminum and stainless steel, effectively prevent corrosion of oxidation.Products can be recycled, reducing environmental pollution.

n Carried out strictly according to the current specificnational standards

n Perfectly optimized components and complete structuralanalysis for the sysytem

n High corrosion resisitance ensure the stability and highdurability

n Total test and certification make sure the high quality ofthe products

n Maximum pre-assembled in factory,quick mounting onsite,timesaving

10-year durability warranty

Technical Data

n Design Period:25 years

n Installation Site: Open area

n Array Angle:10°~60°

n ModuleType:Framed or unframed

n Material:Q235B,Al 6063-T5,Al 6005-T5,StainlessSteel A2-70

n Coating:HDG/Anodised



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a finished hanger?
Finished hanger is used for suspension and support equipment, pipelines and other facilities of the auxiliary system, all of its components are in the factory prefabricated production, construction site direct installation and construction. Assembled building pipelines The hanger system can carry a variety of static and dynamic loads in the building to ensure the safety of the building system
Q:What is the solar stent system?
Solar photovoltaic stent, is a solar photovoltaic power generation system in order to place, install, fix the solar panel design special stent. General materials are aluminum, carbon steel and stainless steel. The main parameters: Installation location: Building roof or curtain wall and ground installation orientation:
Q:How to build an effective teaching stent
Teaching design to reflect the learner as the center, it must be based on the cognitive needs of learners to design the corresponding activities. Students need knowledge of the reserves, the need for background schema activation, demand strategy skills based on the basis, otherwise learning is difficult to carry out. In other words, the teacher in the teaching design should be based on the needs of students for students to learn and develop stent.
Q:What is a finished stent?
A little bit of conflict is normal, it is estimated that after 3 months will come, but do not know what happens after 3 months I am also Zeyi the whole ah? I am also ah I was the same problem. The The I am also so I am also
Q:Is the template and stent two or one?
Material staff, that is, the contractor to see the words in accordance with the quota on it. The template is the contact area, the stent is the building area.
Q:How to remove the climbing bag bracket
A good backpack is a good partner, travelers are very seriously and cherish their own mountain backpack. Mountaineering backpack is used for climbing, and other adventure sports (such as rafting, crossing the desert, etc.) and long journeys are also widely used.
Q:How does the hydraulic support work
Stent used by the valve group, column, jack, are not allowed in the underground demolition inspection, the overall replacement. Replace the cylinder as far as possible before the shortest, the joints should be installed on the dust cap
Q:What are the benefits of finished stents?
U prefabricated welded steel groove will inevitably lead to error errors, affecting the quality of the project, reduce the safety of the project, causing hidden dangers, adversely affected by the duration.
Q:Specification for installation of fire pipe support
The spacing of the bracket: the maximum spacing of the bracket is standard, you can Baidu, but the actual installation of the bracket spacing is smaller than the specification, the flange connection, the screw connection when the stent spacing than when the groove connection.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Design drawings and other technical documents complete, and reported by the owners and supervision and approval. Construction plan has been approved, and made to the team at the end. Temporary facilities and water supply, power supply to meet the normal construction requirements. Related equipment has been fitted and into the scene, with construction conditions.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range