Solar Panel Monting System TT-RK-01

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
Supply Capability:
50万套 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

PV Mounting brackets are special solar photovoltaic systemfor placing, installing, fixing the solar panel design. Generally materials arealuminum, steel structure, stainless steel. PV mounting products at groundmounting system, flat roof mounting system, adjustable angle roof rack system,inclined roof rack system, column bracket system.

The Ground Mounting System including concret basement sysytemand steel pipe sysytem, Titanergy provides total solution for flat or pitchedroof with patent products.On the basis of the given project data, specificnational standards and guidelines, Titanergy will calculate the completestructural analysis and create a complete project plan to make sure reliablestructural safety.We provide high quality HDG steel and aluminum products forthe ground mounting sysytem,witch can make sure the security and durability ofthe project.

Features and Advantages

n  The rail bracket is easy to install, just use simple tools(eg, Allen wrench) can be easily installed. Rail connecting member can freelyadjust the length, the stent may be pre-installed on the roof, and thenappropriately adjusted according to the size of the solar panel.

n  The combination of strong, aluminum rails and card blocks fora variety of venues and a variety of materials roofs (such as metal, ceramicand other kinds of tile surface)

n  Component compatibility, and rail can meet PV modules fromdifferent manufacturers.

n  accuracy, the length of the rail to the nearest millimeter,the construction process, not because of the length is too long or too shortfor the second cut.

n  flexible assembly, rail hooks can adjust the spacing modulearray and tile has been installed successfully address the uneven roofconstruction led to difficult problems.

n  design standards, product design and development process instrict accordance with GB, the German standards and other internationalstandards to ensure products reach the world advanced level.

n  Quality assurance, the stent main material is high-qualityaluminum and stainless steel, effectively prevent corrosion of oxidation.Products can be recycled, reducing environmental pollution.

n Carried out strictly according to the current specificnational standards

n Perfectly optimized components and complete structuralanalysis for the sysytem

n High corrosion resisitance ensure the stability and highdurability

n Total test and certification make sure the high quality ofthe products

n Maximum pre-assembled in factory,quick mounting onsite,timesaving

10-year durability warranty

Technical Data

n Design Period:25 years

n Installation Site: Open area

n Array Angle:10°~60°

n ModuleType:Framed or unframed

n Material:Q235B,Al 6063-T5,Al 6005-T5,StainlessSteel A2-70

n Coating:HDG/Anodised

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Fire spray installation in the anti-swing stent approach?
5 when the nominal diameter of the pipe is equal to or greater than 50mm, each section of the water main pipe or water distribution pipe should not be less than one bracket, and the anti-swing bracket should not be greater than 15m spacing; when the pipeline changes direction,
Q:What is a finished hanger?
Finished hanger Overview Finished product hanger is directly from the manufacturers to produce stereotypes of the channel and a variety of connectors, and then by the construction staff on-site loading of the hanger system.
Q:How to build an effective teaching stent
teaching design performance for the organization, management, teaching and learning four different levels. [4] The current teaching design system is the teaching level as the basic level, the concern is how teachers should teach.
Q:What is a finished stent?
A little bit of conflict is normal, it is estimated that after 3 months will come, but do not know what happens after 3 months I am also Zeyi the whole ah? I am also ah I was the same problem. The The I am also so I am also
Q:What is the metal material for the RESOLUTE bracket?
Drug-eluting stent implanted in the human blood vessels, the stent to block the blood vessels to support the same time, the drug will be released within a certain period of time from the stent, eluting into the arterial tissue to play the role of inhibition of smooth muscle hyperplasia, so as to effectively prevent the stent site again Clogging (clinically referred to as "restenosis").
Q:What is the difference between a shock support and a conventional stent?
The traditional load-bearing support system is the support system with gravity as the main load (the traditional gravity support hanger only bear the vertical load); 2, the seismic support hanger mainly bear the horizontal load of the pipeline
Q:Easy to pave the anti-static floor bracket system?
static floor can be freely in the track orbit on the random placement, free flip, to ensure that the floor of the smooth, beautiful, no deformation, which is the patented technology and conventional Way to install the biggest difference.
Q:What is a high-profile template system?
Erection height of 8m and above; erected span of 18m and above; construction of the total load of 15kN / m2 and above; concentration line load 20kN / m and above for the "more than a certain size of the larger part of the sub-
Q:What are the benefits of finished stents?
U finished stent relative to the traditional angle steel channel welding stent in addition to the advantages of beautiful, fast installation, but also in its surface without the need for rust paint, galvanized in advance to do so to extend its useful life, maintenance-free.
Q:Specification for installation of fire pipe support
The size and type of the bracket should be based on the actual situation to determine the stent hole should be used to open the hole drilling, is strictly prohibited to use electricity, gas welding openings.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range