solar mounting system with concrete embedded bolt

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
5MWp watt/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

solar mounting system with concrete embedded bolt is structure customization,drill and welding free and faet installation.appearance and generous,without secondary anticorrosive processing.ahead rear of base board can be adjusted,easy to be rectified in construction.


  Installation site  Outdoor ground
  Installation angle  customization
  Wind resistance 35m/s
  Solar Panel Type  frame or frameless
  Solar panel size  any size
  Mount track  aluminum extrusion attachment
  Mount materials  Q235B
  Installation height  customization
  Snow load  1.4KN/m2
  Components arrangement  laterally or longitudinally
  International Standards  comply with AS/NZS 1170 and other international standards
  Quality Warranty  20 years


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the hidden dangers of solar PV systems? It is best to classify, such as stents, inverters.
If the installation is very remote no man's land, it is recommended to purchase enough to buy the brand and good quality equipment, maintenance and repair costs are high.
Q:What is the solar stent system?
Concept: In order to maximize the power output of the entire photovoltaic power generation system, combined with the geographical, climatic and solar resource conditions of the construction site, the support structure of the solar modules in a certain orientation, arrangement and spacing is usually a steel structure and an aluminum alloy
Q:What are the characteristics of the hydraulic support hydraulic system?
Third, the hydraulic support can be replaced lines and substitutability must be strong, that is, after the failure, can be replaced in the shortest possible time and maintenance, thereby reducing the loss and protect the safety of workers!
Q:How does the hydraulic support work
Stent used by the valve group, column, jack, are not allowed in the underground demolition inspection, the overall replacement. Replace the cylinder as far as possible before the shortest, the joints should be installed on the dust cap
Q:Easy to pave the anti-static floor bracket system?
static floor can be freely in the track orbit on the random placement, free flip, to ensure that the floor of the smooth, beautiful, no deformation, which is the patented technology and conventional Way to install the biggest difference.
Q:Is the template and stent two or one?
The template is a model for the new concrete molding. The template system consists of formwork, support and fasteners, which require that the shape and dimensions of the structure and components be accurate. Have sufficient strength, stiffness and stability.
Q:What is the difference between a shock support and a conventional stent?
The traditional load-bearing support system is the support system with gravity as the main load (the traditional gravity support hanger only bear the vertical load); 2, the seismic support hanger mainly bear the horizontal load of the pipeline
Q:What is a finished hanger?
Finished hanger is used for suspension and support equipment, pipelines and other facilities of the auxiliary system, all of its components are in the factory prefabricated production, construction site direct installation and construction. Assembled building pipelines The hanger system can carry a variety of static and dynamic loads in the building to ensure the safety of the building system
Q:How to build an effective teaching stent
Teaching design to reflect the learner as the center, it must be based on the cognitive needs of learners to design the corresponding activities. Students need knowledge of the reserves, the need for background schema activation, demand strategy skills based on the basis, otherwise learning is difficult to carry out. In other words, the teacher in the teaching design should be based on the needs of students for students to learn and develop stent.
Q:How to remove the climbing bag bracket
Climbing bag of the bracket, is a part of the carrying system, took the words, carrying a backpack will be very tired, that the role of mountaineering bag is meaningless.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range