solar mounting system with concrete embedded bolt

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
5MWp watt/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

solar mounting system with concrete embedded bolt is structure customization,drill and welding free and faet installation.appearance and generous,without secondary anticorrosive processing.ahead rear of base board can be adjusted,easy to be rectified in construction.


  Installation site  Outdoor ground
  Installation angle  customization
  Wind resistance 35m/s
  Solar Panel Type  frame or frameless
  Solar panel size  any size
  Mount track  aluminum extrusion attachment
  Mount materials  Q235B
  Installation height  customization
  Snow load  1.4KN/m2
  Components arrangement  laterally or longitudinally
  International Standards  comply with AS/NZS 1170 and other international standards
  Quality Warranty  20 years


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the hidden dangers of solar PV systems? It is best to classify, such as stents, inverters.
Antistatic floor of the stent system is worth mentioning is "easy to pave the way." "Easy to pave the" anti-static floor bracket system is a patented technology, but also the only use of aluminum alloy stent system to do the system, good stability, high load, integrity, pavement after the anti-static floor is very smooth ,
Q:What is a finished stent?
Finished stents are directly from the factory to produce stereotypes of the channel and a variety of connectors, and then by the construction staff on-site assembly of the stent system.
Q:What is the solar stent system?
should be south (tracking system exception) Installation angle: equal to or close to the installation of the local latitude Load requirements: wind load, snow load, earthquake requirements Arrangement and spacing: Combined with the local sunshine conditions Quality requirements: 10 years without corrosion, 20 years of steel does not reduce, 25 years still have a certain
Q:How does the hydraulic support work
Stent used by the valve group, column, jack, are not allowed in the underground demolition inspection, the overall replacement. Replace the cylinder as far as possible before the shortest, the joints should be installed on the dust cap
Q:What is the full support system
A construction method, to take a certain interval, dense erection, from the role of the scaffolding construction method. Currently common in the construction of cast-in-place bridges and cast-in-place floor construction.
Q:Fire spray installation in the anti-swing stent approach?
4 water branch on each pipe section, adjacent to the nozzle between the pipe set of hanger should not be less than one, the hanger spacing should not be greater than 3.6m.
Q:What is the difference between a shock support and a conventional stent?
The traditional load-bearing support system is the support system with gravity as the main load (the traditional gravity support hanger only bear the vertical load); 2, the seismic support hanger mainly bear the horizontal load of the pipeline
Q:What is a finished hanger?
Finished hanger is used for suspension and support equipment, pipelines and other facilities of the auxiliary system, all of its components are in the factory prefabricated production, construction site direct installation and construction. Assembled building pipelines The hanger system can carry a variety of static and dynamic loads in the building to ensure the safety of the building system
Q:Specification for installation of fire pipe support
The spacing of the bracket: the maximum spacing of the bracket is standard, you can Baidu, but the actual installation of the bracket spacing is smaller than the specification, the flange connection, the screw connection when the stent spacing than when the groove connection.
Q:How to build an effective teaching stent
teaching design performance for the organization, management, teaching and learning four different levels. [4] The current teaching design system is the teaching level as the basic level, the concern is how teachers should teach.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range