solar mounting system/ground screw solar mounting system

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

solar mounting system/ground screw solar mounting system

1 quick installation, suitable for any soil, even on the hillside

2 save time, save the cost, reduce the construction period

3 do not need to do large-scale site formation, without excavating the ground, notdestruction of vegetation, no pollution to groundwater and addressenvironmental.

4 products can be recycled or transferred to other areas, power plant after usecan restore the original landscape, convenient land, reclamation and re development.


the installation siteaccording to customer requirements
the installation angleaccording to customer requirements
wind load40m/s
solar panel typewith or not with frame

size of panels

any
the support railaluminum alloy rolling block
scaffold materialQ235B steel
mounting heightaccording to customer requirements
snow load1.4KN/m2
components arrangedhorizontally or vertically
the international standardAS/NZS 1170 and other international standards
service life > 25 years

Packaging:

1.wooden box & wooden pallet & plastic package & steel packaging belt

2.as customer reqiured


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the characteristics of the hydraulic support hydraulic system?
Hydraulic support is mainly used in coal mining and other underground production site, so the first is to ensure that when used in these places will not appear fire heart, it will not be charged because of friction and amplification, and thus detonated, so first consider the hydraulic
Q:How does the hydraulic support work
Hydraulic support is used to control the coal mining face pressure structure of the mine. The surface pressure is applied to the hydraulic support. In the mechanical system where the hydraulic support and the face rock are interacted, if the supporting force of the hydraulic support is exactly the same as the external force acting on the hydraulic support,
Q:What is the full support system
Full-frame construction is a long-term method, construction requires a lot of template stent. The construction of the bracket is to erect the bracket at the bridge, pour the concrete on the bracket, and remove the template and the bracket after the concrete reaches the strength.
Q:Fire spray installation in the anti-swing stent approach?
5 when the nominal diameter of the pipe is equal to or greater than 50mm, each section of the water main pipe or water distribution pipe should not be less than one bracket, and the anti-swing bracket should not be greater than 15m spacing; when the pipeline changes direction,
Q:Is the template and stent two or one?
Material staff, that is, the contractor to see the words in accordance with the quota on it. The template is the contact area, the stent is the building area.
Q:What is the difference between a shock support and a conventional stent?
The traditional load-bearing support system is the support system with gravity as the main load (the traditional gravity support hanger only bear the vertical load); 2, the seismic support hanger mainly bear the horizontal load of the pipeline
Q:Specification for installation of fire pipe support
The height and spacing of the fire pipe support shall be in accordance with the requirements of the design and construction specifications.
Q:What is the support frame at the bottom of the car?
The rear end of the ear through the steel plate spring hanging pin and the rear hanging ear hanging ear holder connected to the rear end can be free to swing, the formation of activities lugs
Q:How to remove the climbing bag bracket
Climbing bag of the bracket, is a part of the carrying system, took the words, carrying a backpack will be very tired, that the role of mountaineering bag is meaningless.
Q:What is a high-profile template system?
Erection height of 8m and above; erected span of 18m and above; construction of the total load of 15kN / m2 and above; concentration line load 20kN / m and above for the "more than a certain size of the larger part of the sub-

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range