Solar Module with Aluminum Frame

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1:Introduction:

AluminumFrame for PV Modules

Certificate:2008 quality management system certification

Material:Aluminum alloy 6063 T5

Surfacetreatment: electrophoresis, powder coating, PVDF and more

 

2: Special features:

1.HighQuality, strictly quality inspection during production and wholeinspection before package.

2.Hundredsof Standard Designs can be available and supplied.

3.Goodperformance, product Warranty for 25 years.

4.Deepprocessing: fine saw cutting, drill, broaching, punching, polishing, sandblasting

5.Pure 99.7% aluminum materials without any scrap used;
6.Reliable quality & Strictly quality control process assured higher quality.

 

3: Technical Characteristics

 

ALUMINIUM FRAME

Dimention: length:1664±0.2mm, width:997±0.2mm, Thickness:45mm

trademark

Chemical Composition

Si

Fe

Cu

Mn

Mg

Cr

Ni

6063

0.20~0.6

0.35

0.1

0.1

0.45~0.9

0.1

 

Zn

Ti

Zr

Other

Al

0.1

0.1

 

Single

Total

Margin

0.05

0.15

Pakcing:

In boxes

Alloy

Supply status

Thinkness/mm

Tensile strength(Rm)N/mm²

Elongation are  break(Rp0.2)N/mm

Elongation(A50mm)%

Test thickness(mm)

 

 

 

 

No less than

6063

T5

All

160

110

8

0.8


4:FAQ

Q1:Can we visit your factory?

A1:Sure,welcome at any time,seeing is believing.

Q2:Which payment terms can you accept?

A2:T/T,L/C,Moneygram,Paypal are available for us.


5:Image

Solar Module with Aluminum Frame

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a high-profile template system?
Erection height of 8m and above; erected span of 18m and above; construction of the total load of 15kN / m2 and above; concentration line load 20kN / m and above for the "more than a certain size of the larger part of the sub-
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Installation preparation → prefabricated → trunk installation → riser installation → pipe installation → pipe pressure test → pipe flush → pipe corrosion and insulation.
Q:Fire spray installation in the anti-swing stent approach?
Pipe bracket, hanger installation location should not hinder the nozzle of the water spray effect; pipe support, hanger and the distance between the nozzle should not be less than 300mm;
Q:What is the support frame at the bottom of the car?
This suspension is widely used in front and rear suspension of trucks. SUV rear suspension also uses steel leaf spring non-independent suspension. It is used in the middle of the U-bolt bolts will be fixed on the axle. Suspension front for the fixed hinge,
Q:How to remove the climbing bag bracket
A good backpack is a good partner, travelers are very seriously and cherish their own mountain backpack. Mountaineering backpack is used for climbing, and other adventure sports (such as rafting, crossing the desert, etc.) and long journeys are also widely used.
Q:Easy to pave the anti-static floor bracket system?
So that the floor flatness, aesthetics, the gap has been a large degree of straightening, while the efficiency of the rapid increase of more than 50%.
Q:What is the solar stent system?
Concept: In order to maximize the power output of the entire photovoltaic power generation system, combined with the geographical, climatic and solar resource conditions of the construction site, the support structure of the solar modules in a certain orientation, arrangement and spacing is usually a steel structure and an aluminum alloy
Q:What is a finished hanger?
Advantages: finished hanger system easy to install, easy maintenance. Have shortened construction time, reduce maintenance time and so on
Q:Is the template and stent two or one?
Material staff, that is, the contractor to see the words in accordance with the quota on it. The template is the contact area, the stent is the building area.
Q:What is a finished stent?
and drainage works, construction electrical engineering, building HVAC projects, solar photovoltaic systems, subway support system and other systems, and so forth.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range