Solar Hook PV solar Roof Hook roof tile hook

Ref Price:
Loading Port:
Xiamen
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Solar Hook PV solar Roof Hook roof tile hook


Specifications

Solar Power System
Solar Roof Mount High Rise Flashing Hook
ISO 9001,AS/NZS 1170&TUV certified
Easy installation,warranty 10


Material

Aluminum AL6005-T5

Standard

AS/NZS 1170, TUV

Install Site

roof

Install Angle

0-60 degree

Max Building Height

20 m

Wind load

130mph(60m/s)

Snow Load

30psf(1.4kN/m2)

Anticorrosive

Anodized or hot galvanized

Color

Natural or Customized

Warranty

10 years

Duration

More than 20 years



Do not use paint or petroleujm based products on rubber collars

including high rise bar , high rise flashing and L feet kit

  1. Flexibility: roof mount, pole mount, ground mount, ballasted mount, etc both for on grid and off-grid systems, for framed and frameless panels

  2. Easy Installation: All kits are highly assembled in factory. The tilt in module can be located in any location of rails.

  3. MOQ: Sample orders are allowed

  4. Delivery Time: 3-15 days when orders are confirmed

You are welcome to send us an inquiry for more information. Our products can meet requirement of any install solutions. Customized designs are accepted.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Fire spray installation in the anti-swing stent approach?
5 when the nominal diameter of the pipe is equal to or greater than 50mm, each section of the water main pipe or water distribution pipe should not be less than one bracket, and the anti-swing bracket should not be greater than 15m spacing; when the pipeline changes direction,
Q:What are the hidden dangers of solar PV systems? It is best to classify, such as stents, inverters.
Controller design charge and discharge circuit designed over-current protection (plus insurance); inverter output lightning protection, overcurrent protection; bracket can withstand more than 12 typhoons; battery low temperature and high temperature protection.
Q:How to build an effective teaching stent
teaching design performance for the organization, management, teaching and learning four different levels. [4] The current teaching design system is the teaching level as the basic level, the concern is how teachers should teach.
Q:How to remove the climbing bag bracket
Climbing bag of the bracket, is a part of the carrying system, took the words, carrying a backpack will be very tired, that the role of mountaineering bag is meaningless.
Q:What is the metal material for the RESOLUTE bracket?
Drug-eluting stent implanted in the human blood vessels, the stent to block the blood vessels to support the same time, the drug will be released within a certain period of time from the stent, eluting into the arterial tissue to play the role of inhibition of smooth muscle hyperplasia, so as to effectively prevent the stent site again Clogging (clinically referred to as "restenosis").
Q:What is the difference between a shock support and a conventional stent?
he lack of horizontal seismic support structure; 2, seismic support hanger mainly bear the horizontal load of the pipeline
Q:What is the support frame at the bottom of the car?
This suspension is widely used in front and rear suspension of trucks. SUV rear suspension also uses steel leaf spring non-independent suspension. It is used in the middle of the U-bolt bolts will be fixed on the axle. Suspension front for the fixed hinge,
Q:What are the benefits of finished stents?
Steel parts and components to achieve modular / standardized production, can improve production efficiency and reduce labor costs; finished stent system easy to install, easy maintenance (parts easy to purchase), shorten the duration, reduce maintenance time and so on.
Q:Specification for installation of fire pipe support
The most common trench in the fire as an example: DN65 ~ DN150 the stent spacing is generally 4 to 4.5 meters (when the stent spacing set with the beam between the cross, because the bracket is often attached to the beam installation), DN25 ~ DN50 bracket Spacing is generally about 3 to 3.5 meters
Q:What is the full support system
Full scaffolding is mainly used for large single-storey building, exhibition hall, gymnasium and other high-rise, large building between the top of the building decoration and structural construction, must contain pole, bar, bracing, scissors support.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range