Sleeper laying machine

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Sleeper laying machine is composed of clamping girder, stretchinggirder, hydraulic system and rotating connection system, cooperating with a setof excavator. It is propelled by the hydraulic system, completing the followingoperations such as grabbing, clamping, collecting and laying concrete sleeperby the hydraulic system of an excavator; Operation control is placed in theexcavator cab, the operator can complete the following operations such assnatching ,scattering and circulatory operations subject to the given sleeperunit spacing through the control system.

Performance and parameters

Dimensions   :          2872×1580×1095mm(Extension);

                     1472×1580×1095mm(contraction);

               (Height refers to the distance fromthe excavator connection shafting center line to the catching bottom) ;

   Dead weight           :            993kg ;

   Hydraulic system operatingpressure   :        10Mpa ;

  Hydraulic system maximum flow rate  :     25~60L/min   ;

   Rotating range     :            ≥180 degree;

   Construction speed       :             40 m/h ;

   Rotating speed     :              1~3r/min ;

   Sleeper spacing      :  600~650mm steplessadjustment(designing subject to the specific requirements) ;

  Maximum lifting weight      :       1500kg ;

Working ambient temperature      :     -10~50℃


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:is OKorder a good website for selling machinery?
The questions need to ask yourself are: - Is the weight of the product and corresponding freight cost going to be prohibitive for anyone bidding internationally or far from my local area? - Is my product too specialised for OKorder? - do I need a large national/international group of prospective buyers to ensure a sale? You may in fact be better off finding a more specialised sales platform. Good luck.
Q:Design of Machinery 4th Edition by: Robert L. Norton?
I saw that book recently at a store, and I think it's called Design of Machinery with Student Resource, not solution manual. Good luck with this. Sometimes with searches it really depends on the exact phrasing.
Q:Do you mind if I operate heavy machinery under the influence of you?
no............... my influence is not that good...........
Q:What are the employment directions of mechanical engineering?
The employment direction of mechanical engineering is very extensive, and the mechanical related industries are involved. Including aviation, automobiles, heavy industry, transportation, machinery research institutes, etc.. General employment related to specific direction you apply for the school, such as aerospace school employment direction for the general aviation enterprises, many automobile enterprises and so on.
Q:Can anyone understand the enormous challenge of rising above the Clinton machinery?
Amazing what Oprah's endorsement can do. The choices are all terrible. People like Oprah should not be allowed to influence the vote in favour of any one candidate. Its like getting illegal money for your campaign.
Q:How would you survive if all the electricity and machinery in the world just stopped forever?
That's the premise of a new TV show. I find it unrealistic, though. Does all the magic that makes machines and electricity work, all that magic has run out? I'd go fishing. I've lived without electricity, or as you call it, magic, before.
Q:what kind of machinery/process is used to make medals?
I would have to see it to tell you but stamping,casting or machining are the most common.
Q:What is the management of construction machinery?
(3) responsible for the temporary use of electricity and installation of heavy machinery and equipment management, (demolition), use, maintenance and maintenance, strengthen the demolition units and the demolition personnel, special operations personnel management, strengthen the lifting of foundation construction, equipment installation, lifting and removing nodes, and other key aspects of the management and supervision of lifting equipment and temporary electricity management system;
Q:Why do they put 'Do not operate heavy machinery' on children medicine.?
What, don't you let your kid drive a forklift or bulldozer? What's wrong with you?
Q:My machinery requires 240 3 phase. Can I get this without a transformer?
Most 240V. machinery will operate on 208V. (Check the 'spec.s., Ask the manufacturer.) If your equipment really does require '240V. actual', an electrician can set you up with a three single phase 'boost' auto transformer rig, for a whole lot cheaper then a standard transformer.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range