SJ TOWER CRANE QTZ80-TC5810

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

TOWER CRANE TC5810 description

Tower crane TC5810description

TC55810tower crane is our company according to the design of tower crane"GB/T5031-2008" modl of the tower crane.

1) work much, wide range of use, this machine has a fixed base and wall attachment type.

2) has high working speed, good performance of speed regulation, stable operation, high efficiency. Three speed motor and single speed ratio reducerused in lifting structure, so that the heavy load and low speed, light load speed.

3) crane configuration lifting height limiter, moment limiter, amplitude limiter,lifting weight limiter, slewing limiter, rotary, traction mechanism brake safety device, and trolley rope breaking resistant, anti broken shaft device, themachine is suitable for various different construction environment, ensure thework reliability of tower crane.

4) cab uses linkage Taiwan advanced operation of the mechanism of action of easy operation, simple repair.

Tower crane TC5810 technical parameters

The maximum working range of 58m, end weight and the maximum take-off weight of 6T1T.

Mechanism is equipped with three speed motor hoisting, smooth brakingimpact is small when shifting.

Luffing mechanism can provide two kinds of speed.

Free standing height 42 (M)

The maximum height of 190 (M)

The working range of the tunable 44/50/56/58 (M)

The minimum working range of 3 (M)

The maximum lifting capacity of 6 (T)

End load "(T) 1 (M)



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:All types of jack up cranes. How is the maximum lifting torque converted?
The moment of the tower crane is set up by the factory, and can not be changed. How do you want to convert it?If the nominal torque is converted to kn tons, 1 tons is equal to 9.8 kn.
Q:What are the characteristics of a tower crane?
Two, according to the structure characteristics of the boom can be divided into the pitching amplitude boom (boom) and trolley jib tower crane (arms).Luffing jib tower crane luffing jib by lifting does not achieve the amplitude, the utility model can give full play to the effective height of the boom, simple mechanism.Trolley jib tower crane is installed on the level of the boom on the track trolley achieve amplitude, the utility model has the advantages of large amplitude range, trolley can near the tower, can load amplitude, the shortcoming is: the boom stress on the structure of complex, high requirements, and the boom and the car must be in the building the upper part of the spire, the installation height should be higher than the roof of buildings 15-20 meters.Three, according to the turret structure, the rotation mode can be divided into lower slewing (turret rotation) and upper slewing (turret not slewing) tower crane.Under the rotary tower crane slewing bearing, balance weight mechanism are arranged on the lower end of the main tower, its advantages are: less bending, low gravity, good stability, convenient installation and maintenance, the disadvantage is the higher requirement to the slewing bearing, installation height is limited.The slewing tower crane is characterized in that the slewing bearing is balanced and the main mechanisms are arranged at the upper end, and the advantage of the utility model is that the lower part of the tower body can be simplified, and the lifting and the adding of the joint can be simplified because the tower body is not turned. The disadvantage is: when the building exceeds the tower height, due to the influence of the balance arm, limit the slewing of the crane, at the same time, the center of gravity is higher, the air pressure increases, the weight increases, so that the total weight of the whole machine increases.
Q:What tower cranes are used on the 30 storey house?
but if the building steel structure more parts or building the number of square meters more than 60 thousand square meters, you need to consider QTZ80 or more of the tower crane, because the type of large lifting capacity is big, the work efficiency is high. Hope to be of help to you!
Q:Tower crane and construction hoist service life? What are the norms and standards? How to detect?
According to Hangzhou quality safety supervision station (2011) No. 56 document:Six, strengthen the use of longer construction crane management1, more than the required number of tower cranes and construction hoist should be qualified units for security assessment, the specific years with reference to the following requirements.Tower crane: 630KN.m (excluding 630KN.m), factory more than 10 years of age (including 10 years); 630KN.m1250KN.m (excluding 1250KN.m), factory more than 15 years of age (including 15 years);
Q:Which is the main basis for the disassembly and assembly process planning of tower cranes?
Before the installation and disassembly of 2.0.10 tower cranes, special construction plans shall be worked out to guide operators to perform installation and disassembly operations. The special construction plan shall be prepared according to the actual conditions of the product specifications and the working site of the tower crane, and shall comply with the requirements of the relevant laws, regulations and standards. The special construction plan shall be examined and approved by the technical, safety and equipment departments of the unit, and approved by the technical person in charge, and shall be approved by the supervision unit.2
Q:How to fix the cable on the tower of QTZ125 type tower crane?
The main purpose is to prevent the main cable fixed tower crane tower crane cable weight lead cable pulled bad (insulation damage, core pulling) etc.,
Q:Safety rules for tower cranes
Three. Check after shutdown3.1 after the tower crane has stopped operation, it is necessary to select the suitable position of the barrier and the middle of the track when the turret is turned and the arm to stop along the wind, and then lock all the rail clamps.All 3.2 tower crane rotary mechanism with a normally closed or braking device, in the stop after the operation, the driver must remove the handle, release the brake for crane in the wind blowing in under the direction of rotation.3.3, the hook should be lifted to the minimum distance from the lifting wall, not more than 5m position, hanging on the hook is strictly prohibited. Not to take reliable measures, not by any means, limiting the boom rotate with the wind.
Q:What courses should I take to buy the tower crane to be installed?
First in, in construction projects, and so on arrival booking use state, from the construction project into fixed assets. Increase in fixed assets, depreciation from the beginning of next month
Q:In what circumstances should a tower crane be demonstrated by an expert?
Circular of the Ministry of housing, urban and rural construction on Issuing the measures for the safety administration of sub hazardous and sub divisional projectsBuilding quality [2009]87 number]Annex twoMore than a certain size of the risk of larger sub sub project scopeI. deep foundation pit engineering......
Q:What does "jack up" tower crane 1000KNm mean?
1000KNm is the torque is 1 million nm.Torque, in physics, refers to the tendency of an object to revolve around a rotating axis or fulcrum. The unit of torque is Newton m..

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range