Product Description:

Tower crane TC6015 description

TC6015 tower crane is our company according to the design of tower crane"GB/T5031-2008" model of the tower crane.

1) work much, wide range of use, this machine has a fixed base and wall attachment type.

2) has high working speed, good performance of speed regulation, stable operation, high efficiency. Three speed motor and single speed ratio reducerused in lifting structure, so that the heavy load and low speed, light load speed.

3) crane configuration lifting height limiter, moment limiter, amplitude limiter,lifting weight limiter, slewing limiter, rotary, traction mechanism brake safety device, and trolley rope breaking resistant, anti broken shaft device, themachine is suitable for various different construction environment, ensure thework reliability of tower crane.

4) cab uses linkage Taiwan advanced operation of the mechanism of action of easy operation, simple repair.

Tower crane TC6015 technical parameters

The maximum working range of 60m, end weight and maximum take-off weight of 8T 0.8T

Mechanism is equipped with three speed synchronous motor brakingimpact small shift, smooth

Luffing mechanism can provide two kinds of speed.

Free height of 47.5(m)

The maximum height of 200 (m)

The tunable 45 / 50/ 55/60 of the scope of work )

The minimum working distance (2.5 meters)

The maximum lifting capacity of 4 (T)

End load "(T) 0.8 (M)


The minimum working range of 3 (M)

The maximum lifting capacity of 4 (T)

End load "(T) 0.8 (M)



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:More than meters of tower cranes must be equipped with red barrier lights at the top
however, tower cranes over 30 meters above the tower shall be equipped with red light on the top of the tower and jib.
Q:Tower crane (tower crane)
Fixed tower crane, mobile tower crane, flat tower crane, movable arm tower crane
Q:Ask about the lift and transportation of the jack up tower crane
If it implements specialized subcontracting, it shall be organized by the subcontractor. Led by the security establishment or technician, audit professional and technical personnel to audit the Organization Department of the unit by unit technology, construction technology, safety, quality and other departments, and ultimately approved by the signature of the person in charge of enterprises (393 orders), and the general contractor technology are also responsible to approval.
Q:When building tall buildings, where is the bottom of the tower crane installed?
It's just a little bit needed, and you're right!! As long as the requirements to ensure verticality, no problemBuilding technical requirements, such as Perpendicularity Error of not more than 3 millimeters per 100 meters, can be guaranteed by the building.
Q:Detailed parameters of QTZ80 tower crane 50
The weight of the whole machine is 36.1 tons (independent height). Its balance weight is 15 tons, and the balance weight is 11.82 meters. The boom weight is 5.72 tons. It is necessary to use planetary gear.Usually use two rotary speed reducer of 8000 nm.
Q:What measures should be taken to make tower cranes stable?
Phosphating coating of steel wire rope, give priority to the use of manganese or zinc manganese phosphating, and smooth steel wire rope production process comparison, just add the last bonderizing process, steel wire, wear resistance and corrosion resistance is greatly improved, the use of the wire without direct phosphating cold twisted steel wire rope.
Q:How high the tower crane needs to be installed with the wall pole. How is it stipulated in the national standard?
The independent height of the tower crane is determined by the manufacturer's manual. The independent height of the tower cranes of different manufacturers and different types is different. The installation of the tower crane needs to be installed with a wall rod. The specifications are stipulated in the instruction. The national standard requires the instruction of the manufacturer's manual.
Q:What is the difference between a jack up tower crane and a fixed tower crane?
The jack up tower crane is a tower crane (that is an internal climbing tower crane) that is added and reduced by its own special device, namely, the standard section of the tower (that is, the attached tower crane) or the whole climbing tower itself.
Q:What is tower crane? What are the types and features?
[classification and characteristics]Tower crane is divided into two categories: upper slewing tower and lower slewing tower crane. Among them, the bearing capacity of the former is higher than that of the latter. In many construction sites, what we have seen is the tower crane with rotary top, top lift and knot joint.
Q:What are the lifting moment requirements for tower cranes?
1. Tower crane consists of three parts: metal structure, working mechanism and electrical system. The three main technical parameters are lifting moment, lifting weight and working speed. Lifting moment refers to the boom as the basic arm length maximum amplitude corresponding to the rated lifting weight of product, product or maximum weight with the corresponding inflection point.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range