SINOTRUK BOX SEMI-TRAILER

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

BOX SEMI-TRAILER

Model

Overall Dimension (mm)

Rated Load Capacity (kg)

Dead Weight (kg)

Tire

CNHTC-10XXY2

10500×2500×3800

26000

7850

11:00

CNHTC-13XXY3

13000×2500×3990

35000

10000

12:00

CNHTC-14XXY3

14000×2500×3990

50000

12200

12:00

CNHTC-16XXY3

16500×2500×3990

60000

14000

12:00

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:overweight exersising machinery?!?
I've had a lot of luck with the elliptical machine. If you can increase your time to 45 minutes, even better.
Q:How hard is to get a finance for a machinery for $65 000?
It will be very hard to get a loan for 65,000 with little credit history. What will make it even harder is if you can't show income. The manufacturer of the equipment may have finance available through them, since if you default, they can take back possession. Most banks will consider a piece of machinery a poor securitization option because there is such a limited market.
Q:Design of Machinery 4th Edition by: Robert L. Norton?
I saw that book recently at a store, and I think it's called Design of Machinery with Student Resource, not solution manual. Good luck with this. Sometimes with searches it really depends on the exact phrasing.
Q:What about the title of Mechanical Engineer?
Mechanical engineers enter oneself for an examination condition: Mechanical Engineer: the first qualification examination is divided into basic examination and professional examination. If the basic examination is qualified and meets the registration requirements prescribed in the present measures, it may take a professional examination. After the professional examination has passed, the certificate of mechanical engineer qualification for the mechanical design of People's Republic of China shall be obtained
Q:How is the basic machinery of organelles and cytoskeleton system that all cells share is then regulated and en?
Required? You're bossy. And your question is incomplete. What you mean to ask so you can finish your assignment is How is the basic machinery of organelles and cytoskeleton system that all cells share then regulated and enhanced to achieve this astonishing diversity? Again, I direct you to this site to help you finish your homework.
Q:Does anyone still have Electric Machinery 5th Solutions?
see the Pearson's chi square test
Q:What kind of machinery is used on arable farms?
Machinery to plant, fertilize and harvest crops.
Q:What is the management of construction machinery?
(2) carry out the registration of construction hoisting machinery, equipment and use, and be responsible for implementing the notification system for construction departments and their safety supervision institutions;
Q:Anyone have any tips on reading schematics for HVAC machinery? Or for wiring?
When working with schematics just remember that all electrical circuits have to have 5 components 1) a source ( ac or dc) 2) a load (maybe a lightbulb) 3) protection ( fuse or circuit breaker) 4) conductors (wires) 5) a switch. Once you know what all of your components are you shouldn't have any trouble following the lines on the schematic. As far as pay is concerned, it all depends on salaries in your state. I don't know what they are in MA. Try calling some electrical contractor in your area and do a salary survey with the. Hope this helps.
Q:what machinery will i need to make a burger box?
a burger and a box...lol

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range