Single Mast Aerial Work Platform--AMWP6/AMWP7.5
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Single Mast Aerial Work Platform
AMWP
1KG=2.2LB 1INCH=25.4MM
Model No. |
| AMWP6 | AMWP7.5 |
Max.Platform Height | mm | 6000 | 7500 |
Working Height | mm | 7800 | 9300 |
Max.Travel Height | mm | 6000 | 6000 |
Stowed Height | mm | 1980 | 1980 |
Min.platform Height | mm | 510 | 510 |
Ground Clearance | mm | 50 | 50 |
Max.Work Load | kg | 150 | 125 |
Platform Size | mm | 630x760 | 630x760 |
Max.Drive Speed | kph | 2.4 | 2.4 |
Max.Drive Speed | kph | 0.8 | 0.8 |
Tuming Radius |
| 0 | 0 |
Max.Travel Grade |
| 20% | 20% |
Driving Wheel | mm | Φ230~250x80 | Φ230~250x80 |
Caster | mm | Φ200x50 | Φ200x50 |
Charger |
| 10~12A | 10~12A |
Phthole Protection System |
| Automechanism | Automechanism |
Overall Length | mm | 1360 | 1360 |
Overall Width | mm | 790 | 790 |
Gross Machine Weight | kg | 1000 | 1025 |
- Q:Which mobile shear fork lift is better
- Mobile shear fork lift There are four major systems, The mechanical structure system,
- Q:There is no elevator on the 7th floor of the home to install a lift or lift
- What do you want to do? Can you agree to install these things? These later additions can only be set outside the building, affecting the fire channel.
- Q:What happens when the platform comes up and the power goes out.
- The electromagnetic valve core can be artificially pushed back.I hope my answer will help you
- Q:How does a button in the PLC control the elevating platform
- The recommended answer is wrong, and the platform should stop at any location. You can either push the button or click the number of times to tell whether it's up or down. For example, press the ascent in one second, press two, and press the button to stop. Instructions will use timers, counters, and pulse detection. You get the idea.
- Q:Where do the elevator motors go?
- Abstract: the shear fork type electric elevator is a special equipment for high altitude operation. The it scissor mechanical structure, make the lifting platform lifting Has high stability, wide operating platform and high bearing capacity, make the work high above the range is bigger, and is suitable for many people work at the same time. It makes high-altitude work more efficient and safer. It is a special equipment for high-altitude operation. Characteristics: the lifting mechanism adopts high strength manganese steel. There is a safety protection device that prevents the elevator from overloading. Safety valve shall be set up to prevent rupture of hydraulic pipe. An emergency reduction device with a power failure. The product is suitable for high-altitude equipment installation, maintenance, etc. According to different requirements can choose different dynamic form (such as: three-phase ac power supply, single-phase ac power supply, dc power and diesel power, etc.), and with manual hydraulic equipment, can be in a power outage or lifting work as usual, no power supply and can add adjustable platform, can extend to the desired location on the length of the platform, so as to improve the work efficiency. It is the ideal of modern high building and equipment, which is necessary for the production of high-altitude safe civilization.
- Q:How to maintain the platform?
- My company has, our brand: niu power Throughout guangdong, there are 57 dealers across the country. Check it online, it's ok to buy it, but at least it will give you advice and contrast!
- Q:The ball of the universal milling and lifting platform rolls off, how to install,
- Screw pair after repair good, reinstall the screw pair, need to find a good accuracy of each connecting parts, including position accuracy, positioning accuracy, etc., such as straightness, coaxial degree, parallel degree, diameter jumped, end or something. This is easy to say, but it takes care and patience to do it, and it is usually done by experienced machinery-fitter or fitter. If you can't do it, call the line cutting manufacturer and ask them to repair it.
- Q:The single fork hydraulic lift platform
- If you don't have a hydraulic lock on the oil circuit, it should be,I hope my answer will help you
- Q:How to use the elevator to be safer and more efficient
- Annual maintenance Check all hydraulic pipes and connectors. The pipe shall not be broken, the joints shall not be loose, and all the joints must be tightened. Remove and disassemble the descending valve, blow the plunger through compressed air, then load and resettle. Remove the hydraulic oil, remove the oil strainer and remove the oil strainer, clean it up and then put it back in the tank. Be familiar with 'ten notices' 1, pay attention to the agencies should regularly check and adjust the brake of the brake and the clearance between the brake wheel, flexible and reliable. The clean surface, there should be no dirt, in case of dirt must wash with gasoline or thinners. 2, pay attention to removing the hydraulic tank of fuel cap, remove the cap around earth, unscrew the cap, remove residual impurities in the joint area (not rinse in order to avoid water seeping into the tank), confirmed to open the cap. 3, pay attention to the elevator remove the hydraulic tank of fuel cap, filter cover, test hole, hydraulic tubing parts, cause the system oil when exposed to avoid dust, remove the parts to open completely clear before first.
- Q:Safety operation of hydraulic platform
- The driver shall be responsible for monitoring the distribution of the goods on the platform as uniformly as possible to prevent partial load and to prevent overload operation. The platform does not allow people to carry dangerous goods, such as inflammable and explosive devices, and to ban people from climbing as they rise, as well as artificial shaking. Drivers in the platform are strictly forbidden to leave their posts and to wipe, lubricate or repair the platform. When the work is finished, the driver should cut off the power supply and lock the control panel to leave the job and fill in the record of the transfer. 31 malfunctions, platform, or lose the normal work, should immediately notify the maintenance personnel to repair, if found to have dangerous or may cause personal mechanical accident, should immediately stop using, the total power cut off room and report to management department, just can use after repair and check in detail.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Single Mast Aerial Work Platform--AMWP6/AMWP7.5
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords