Single handle building steel scaffolding props support

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product 

Steel prop, Scaffolding Prop, shoring prop, formwork prop, heavy duty prop, post shore, shoring post, shoring systems

Material

Q235,Q345

Type

Heavy duty, Light duty

Accessories

Base plate, Outer Tube, (Handle, Adjustable nut, Pin,) Inner Tube, Top Plate

Adjustable Height

1.6m to 3m

rough estimate:

a=inner tube length

b=Inner tube length+Outer tube length

b-a=Outer tube length (a>b-a)

 

Inner/Outer Diameter

48mm/60mm,48mm/56mm,60mm/76mm...

Thickness

1.6mm,1.8mm,2.0mm,2.5mm,2.75mm,3.0mm,3.25mm,3.5mm,4.0mm...

 

Distance between per two holes:

 

125mm,145mm,150mm

120*120*(3-8)mm,150*150*(4-6)mm

Surface Treatment

Painted, Powder Coating, electro galvanized, hot-dip galvanized

 

Package

Pallets or In Bulk for steel prop

1200-2000pcs in one 20'FCL

Customized

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:what happened when author dimmesdale went to the scaffolding in town square?
Which time? The first time he went there at night, admits his sin, mets up with Hester Prynne and Pearl, and an A appears in the sky. The second time, Arthur Dimmesdale reveals this secret to the public. He then has a heart attack on the scaffold and dies.
Q:in the scarlet letter, what events happen at the scaffold during the night??
On the Scaffold Dimmesdale is really starting to go crazy. the guilt in his heart about loving hester is eating him up. he goes onto the scaffold thinking no one will see him. he is punishing himself. he yells out and thinks that it will be the end of his secrect but no one hears him. they just think he is the cry in the night. then reverend wilson comes along. but he doesnt see dimmesdale. then hester and pearl walk by they notice them. they come up on the scaffold. Pearl asked dimmesdale if he would stand with hester and her at noon the next day but of he says no that he will only stand with them on Judgement Day. then they see the scarlet letter in the sky and the town people thought that it was just an a for angel because the gov passed away. they next day wilson finds dimmesdale's glove on the scarrold but he thought that the devil put it there. i cant remember what chapter it is in but it is toward the middle good luck with the book i loved it
Q:Fastener type steel pipe scaffold composed of which components?
Reference to "construction safety of steel tubular scaffolding safety technical specifications" JGJ 130 - 2011, 8, page parts3.1 steel pipe3.1.1 scaffolding steel pipe should be used in the current national standard "straight welded steel pipe" GB/T13793 or "low pressure flowQ235 steel pipe for the welded steel pipe used for conveying body; the steel quality of the steel pipe shall be GB/T3091In accordance with the existing national standard "carbon structural steel" GB/T700 Q235 steel provisions.3.1.2 scaffolding steel pipe should be used 48.3 * 3.6. The maximum quality of each steel pipe shall not be greater than25.8kg.
Q:can anyone tell me if it is true that the scaffolding on york minster has to stay there for political reasons?
Eee, by gum, Petey.....all ye hed te do wuz GOOGLE scaffolding on york minster, in'it? And y'eed a learned they's FIXING it reckon on it tekkin 'em ten year or moore!
Q:What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
Take them on the road-trip of course....we'll find some use for them along the way.....
Q:What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
As for the specific rent is not easy to say, because each scaffolding rental companies may have some differences
Q:The outer hanging scaffold board 12 embedded parts embedded in the crack?
Cantilevered scaffold generally has two kinds: one kind is each layer of a pick, the vertical rod at the bottom of the top in the construction site, floor beam or wall, outward tilt after fixed on the upper part of the erection of scaffolding construction, rail laying layer, construction of a story, to be transferred to the upper layer, and then re ride scaffold provides a layer of construction; the other is the multilayer cantilever scaffold, the full height is divided into several sections, each section of the erection of a height of not more than 20m, the use of cantilever beam or cantilever frame for scaffold based subsection overhanging scaffolding section, this method can use scaffolding over 50m the overhanging scaffolding facade to be set up scissors.
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
The general price of 3800-4200 yuan per ton, you need to see the material and specifications.1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-
Q:Is it possible to have the scaffold piercing done separately?
Technically yes but it is better to have them done at the same time so the holes are aligned properly. It is better to get them done at the same time, as the second piercing will be less painful because you are all adrenalin-ed up! Probably cheaper too.
Q:Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
3 products have a high degree of economic, the use of more convenient and efficient in use, only need to put the plug into the hole of the ends of the cross rod pole corresponding, and then knock tightly, the quality of the demolition ride fast and overlapping is the traditional scaffold cannot do. Its erection speed is 4-8 times more than 2 times that of steel pipe scaffold. Reduce labor time and labor remuneration, reduce shipping costs to reduce the overall. The joint is reasonable in structure, easy in operation, light and handy. Vertical rod weight than the same length of the size of the bowl buckle 6-9%.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range