Single Cage Sc100/100 Construction Material Hoist
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Structure of Building Hoist
The SC series construction elevators:
1. The SC series construction lifts has rack and pinion, by which the materials were lifted;
2. This product has no counter weight, dismantling easily and working safely;
3. Overload protection limiter and mechanical chain device are reliable and complete, optimal safety device select SAJ40-1.2, which restricts the excessive downward movement of the cage and prevents cage falling accidents.
4. The transmission system adopted three drive motors and three sets of reduction gears;
5. It has simple electrical control system, convenient to be maintained and low failure rate;
6. The mast sections of construction elevator are painted for four times. Also galvanized mast sections are available for customers.
7. Variable-frequency construction elevator are safe, stead and comfortable. So the speed of construction elevator can vary from 0 to 63 m/min;
8. The start electricity is smaller than the working electricity;
9. Floor calling system is available for customers with extra payment;
10. Quick-wear parts are free to give to customers;
11. We provide one year guarantee service for main mechanisms.
Building hoist Specifiction
Model(single and double cage) | Capacity(kgs) | Lifting speed(m/min) | Motor power(kw) |
SC100TD | 1000 | 36 | 2x11 |
SC200TD | 2000 | 36 | 3x11 |
SC270TD | 2700 | 36 | 3x15 |
SC320TD | 3200 | 36 | 3x18.5 |
SC100/100TD | 2x1000 | 36 | 2x2x11 |
SC200/200TD | 2x2000 | 36 | 2x3x11 |
SC270/270TD | 2x2700 | 36 | 2x3x15 |
SC320/320TD | 2x3200 | 36 | 2x3x18.5 |
SC100GZ | 1000 | 0-63 | 2x15 |
SC200GZ | 2000 | 0-63 | 3x18.5 |
SC270GZ | 2700 | 0-63 | 3x22 |
SC200/200GZ | 2x2000 | 0-63 | 2x3x15 |
SC270/270GZ | 2x2700 | 0-63 | 2x3x18.5 |
SC320/320GZ | 2x3200 | 0-63 | 2x3x22 |
SC100/100G | 2x1000 | 0-96 | 2x2x22 |
SC200/200G | 2x2000 | 0-96 | 2x2x22 |
SC270/270G | 2x2700 | 0-96 | 2x2x22 |
Building Hoist Images
FAQ of Building Hoist
Q: What is the building hoist main purpose?
A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal
construction equipment for vertical transportation in the field of construction.
Q: What is the main structure of building hoist?
A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide &
protection system, electrical top crane and safety device.
Q: What is the meaning of the building hoist’s code?
A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity
is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons.
Q: What is the dimension of the cage?
A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our
quotation sheet. Also, the size can be customized according to the factual site condition. There are two doors (entrance
& exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience
- Q:The elevator is banned from using elevators for more than a class of high winds
- When the wind speed is more than 13 meters per second, the installation and disassembly is forbidden. When the wind speed exceeds 20m/s and the weather, such as hail, the elevator should not be used. This is the norm M/s is about 8, and 13m/s is about 6
- Q:The safety officer shall be responsible for the work of the construction elevator
- In a nutshell, the security officer is responsible for overseeing, checking, training, maintaining, and dismantling
- Q:How does the construction lift fall without electricity
- The lockers are finished with the report, unless there is a problem
- Q:How large a leakage protector is used for the construction elevator
- A leakage switch with a rated current of 100-160a. The rated action current of the second class is 50-75hm. The rated action current is 30-45hm. The action time is less than or equal to 0.1 s. Comply with safety specification according to this construction.
- Q:How does the driver of the construction elevator do the search for a sudden power failure
- When the elevator is running in an abnormal condition, it should stop immediately and take effective measures to bring the ladders down to the ground floor. When the electric is out of control in operation, the stop button should be pressed immediately. The stop button is not allowed until the failure is ruled out.
- Q:The construction elevator should have those procedures
- The construction elevator is short for construction. It is an important equipment in high-rise building construction, and construction site accident hazards easily, because it can cause many major accidents, injuries in the inspection should be listed as a key to check the content.
- Q:Construction elevator positioning should consider which problems
- First make sure that the whole fence can be put down, and there should be no other extension of the fence that does not interfere with the lifting up and down of the cage Considering the length of the wall support, ensure the effective adjustment of the enclosed wall Then consider the installation of the wall support Consider whether access to the building is appropriate Some sites have been put into buildings directly, and some sites have considered scaffolding between them
- Q:Why is the construction elevator open on one side and the other on the other
- Open the door, commonly known as the feed door, usually open up, and add weights to both sides. Only if the construction ladder stops at the bottom. If the door is double open, the room must be left with half a door (> 1.3 m) to open the door completely. If it is a single open door that opens up, you can save space in the cage. Double door, namely, two doors, either up or down, the two doors balance weight. It usually arrives on the required floor. There is enough room for double doors.
- Q:The maximum allowable deviation of the vertical is the vertical degree when the construction elevator is installed
- The development of the elevator is in a peak state, because most of the manufacturers or individuals to improve the utilization efficiency of space, more options for multistory buildings, which also need a device to convenient up and down by the goods. Due to the common elevator cost is high, bearing capacity is low, not suitable for carrying dozens of tons or hundreds of tons of cargo, so developed a high bearing capacity of hydraulic lift to assist in the production and transportation of goods. The elevators are both safe and super loadable, and convenient for maintenance, making the special industry grow faster.
- Q:Should a fire extinguisher be equipped in the construction elevator?
- A fire extinguisher will be required for the 500kg of manned cargo construction elevators at 500kg or more.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Single Cage Sc100/100 Construction Material Hoist
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords