Single Cage Building Hoist SC120

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
50 m/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Guangxi Heqing Construction Machinery Manufacture, established in 2004, is a private enterprise specializing in R&D, designing, manufacturing, selling and leasing of construction machinery, mainly producing builder hoist, mast climbing work platform, superdeck loading platform, temporary suspended platform, building maintenance unit etc.

Taking product sale and leasing as the basic market strategy, the company has effectively built “Heqing” and provided steady cash flow. On one hand, it pushes the independently developed builder hoist, mast climbing work platform, superdeck loading platform, suspended platform and other standardization products to Germany, Sweden, Australia, Malaysia, Singapore, India, etc.; on the other hand, it energetically expands leasing business of builder hoist, superdeck loading platform, suspended platform and other products. Till now, we have established leasing branches in Guangxi, Beijing, Shanghai and etc. Besides, according to the different requirements of customers, our company actively develops design, production, sale and other business of building maintenance system, steel aluminum shuttering and other non-standard building machinery and metal parts.

High-quality technological management team and first-rate production and detection equipment lay good foundation for the steady development of the company. Its technology and management personnel, including many senior engineers, have college degree or above, and skilled workers mostly have vocational school degree or above. The company also has over 200 general and special production equipment and over 300 measuring instruments for detection. The company passed the certification of ISO9001 Quality Management System in 2002, providing reliable guarantee for the management system and product quality.  

Our “Heqing” concern requirements of modern city construction and strive to provide products with advanced technology and rational price, furnish good technical support and pre and after-sales service for customers. We hope to create beautiful future with customers.

Corporate Vision

Vision:Become an ever-green construction machinery enterprise and maximally meet customers’ requirements
Core Values】  
Quality: High quality, innovation, safety and reliability.
              High quality is the basis of the enterprise.
              Innovation is the soul of the enterprise.
              Safety is reverence to life.
              Reliability wins the trust.
Service: Customer focused, customers are existence value of Heqing people, do what we have promised.
Responsibility: Attentive and responsible, brave to undertake and fully perform individual, company and social responsibility.
Spirit
Hard Work:Industry, simplicity, perseverance and hardships are the source power of Yuhuaxing to achieve transnormal and leapfrog development.
Struggle:Concentrated reflection of brave advance, assiduous seeking, brave challenge and enthusiasm and progress of Heqing people.
Pioneering & Progress::Promote traditions, keep pace with the times, have the courage to innovate and pursue excellence in work

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:When the girl came home, she was tracked by a man when she entered the elevator.
It's so simple. Girl from the bag inside out of a submachine gun on the line
Q:Elevator positioning problem
Oh, your question is very interesting. To be honest, my unit to do the product is about this. do you know? In fact, the elevator floor positioning is not only on the rope to capture and make up the ancient cast off the rough, but also in the floor of each layer on the positioning. Also, now the general elevator electronic core board are used in the intelligent positioning system. So this problem is generally not out of the problem. Of course, do not rule out special problems, such as all blackouts and so on.
Q:What is the elevator?
The elevator is mainly composed of the following parts: Guide system: The main function of the steering system is to limit the degree of freedom of movement of the car and the counterweight, so that the car and the counterweight can only move along the guide rail. The guide system consists mainly of rails, guide shoes and rails. Car: The car is the elevator component that carries passengers and cargo, and is the working part of the elevator. The car is composed of a car frame and a car body. The main function of the traction system is to output and transmit power to make the elevator run. The traction system is mainly composed of traction machine, traction wire rope, guide wheel and reverse sheave. Door system: The main function of the door system is to seal the entrance and car entrance. The door system consists of the car door, the floor door, the door opening machine, the second door, the door, the door lock device. Weight balance system: the main function of the system is relatively balanced car weight, in the elevator work can make the car and the weight difference between the weight to keep within the limit to ensure that the elevator traction drive normal. The system consists mainly of counterweight and weight compensation devices. Electrical control system: The main function of the electrical control system is the operation and control of the elevator operation. The electrical control system is mainly composed of the control device, the position display device, the control panel (cabinet), the flat layer device, the selection device and so on. Electric power drag system: electric drive system function is to provide power, the implementation of elevator speed control. Electric drive system consists of traction motor, power supply system, speed feedback device, motor speed control device and so on.
Q:Elevator contactor
The upper side of the coil is marked A1 and A2 is the two points of the coil. (NC) Most of the points are often used to open the signal point, the main contactor you must understand, like the door lock contactor, emergency stop contactor, brake contactor, In addition to the coil point, normally open normally closed are part of the detection circuit, to a part of the signal, the process is to monitor the elevator power phase sequence, the correct after the main power contactor pull, emergency stop loop, emergency stop contact (110V, 36V), often open point to the motherboard signal, the inverter signal, the operation of the contactor signal, the door is closed, then the door contactor pull, and then the door line, elevator, inside the security line (110V, 36V) (110V, 36V), often open the closed point to the motherboard signal, the system signal, run the contactor signal, run the contactor coil is given by the emergency stop contactor signal and door lock contact The signal is given in series, the first two contactors closed, then run the contactor to meet the conditions closed, the coil point also need to give the motherboard control line running signal, and finally the brake contactor pull, feedback a holding point , This is mostly long closed Intestine spotted spotted posture. You better or more to observe its run-time contact closure of the order, no more difficult to see a few times to see clearly, there is more simple drawings, it is best not to see the drawings, easy to Mongolia, on their own To think, and then go to the drawings contrast, see do not need to understand later, remember solid. And then tell you a study of the ruthless strokes · ordinary people I do not tell him ~ ~ ~ ~ Oh turn off the elevator power, the contact with things stuffed, so that they pull, you use the table which point and which point, after their own Draw a simple circuit diagram, then disconnect the amount. Technology this thing is not who taught, are stolen ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Q:Why take the elevator tinnitus
I think it is not the tinnitus but the eardrum outside the drum Department of the bones of the body of the body of the body or concave concave.When the rise or fall due to lower pressure caused by the original internal and external balance of the pressure changes, so the eardrum changes, resulting in tinnitus may be eardrum deformation result.
Q:Why the building of each service area unilateral arrangement of the elevator should not be more than 4?
Just to prevent more than 4, the elevator came to see it, because the elevator hall into the deep limited, it may not know the elevator door opened. The The
Q:The relationship between load bearing and area of elevator
An elevator is a motor-powered vertical lift with box-like pods for multi-storey construction or cargo. There are steps, stepping board mounted on the track for continuous operation, commonly known as escalators or automatic sidewalks. Serving the floor of the fixed lifting equipment. The vertical lift elevator has a car running between at least two rows of rigid or inclined rails with an inclination angle less than 15 °. Car size and structure to facilitate the passengers access or loading and unloading of goods. It is customary to use the elevator as a general term for vertical traffic in a building, regardless of the way it is driven. According to the speed can be divided into low-speed elevators (1 m / s below), fast elevators (1 ~ 2 m / s) and high-speed elevators (2 m / s or more). The mid-19th century began to appear hydraulic elevator, is still in the low-rise buildings on the application. Specific bearing and area relationship see below:
Q:Wow how the energy ship on the second floor
Kill the old 2 after the walk, in that very long stairs opposite a lift of the elevator, from that up
Q:Whether the elevator can be combined with the fire elevator
Choose to try to rely on convenience evacuation of the elevator. For the main part of high-rise civil buildings, the floor area of not more than 1500 square meters, should set up a fire elevator; more than 1500 square meters, less than 4500 square meters, should be set up two fire elevators; each floor area of more than 4500 square meters , Should be set up three fire elevator. The fire shaft of the fire elevator should be set separately, and no other electrical piping, water pipes, trachea or ventilation ducts shall pass. Fire elevator should be equipped with front room, the front room should be equipped with fire doors, so that it has a fire and smoke function. Fire elevator load should not be less than 1000 kg, the car's plane size should not be less than 1 m × 1.5 m, its role is to be able to carry large-scale fire fighting equipment and life-saving stretcher.
Q:PLC control the advantages of the elevator
PLC to achieve the advantages of elevator lift control Elevator as an important means of high-rise buildings and people's work and life are increasingly closely linked. PLC as a new generation of industrial controller, with its high reliability and advanced technology, in the elevator control has been widely used, so that the elevator from the traditional relay control for the development of computer control as an important direction to become the current elevator control and technology One of the hot spots of transformation. PLC is a microcomputer system that specializes in logic control. As the PLC has a stable performance, anti-interference ability, flexible design and other characteristics. So it has been widely used in industrial control. Since the late 80s PLC introduction of China's elevator industry since the PLC composed of elevator control system is widely used by many elevator manufacturers. And formed a series of stereotypes products. In the traditional relay system transformation project, PLC system has been the mainstream control system. Elevator control system is divided into speed control part and logic control part. The performance of the speed control part of the elevator operation is the passenger comfort has an important impact, and the logic control part of the elevator is safe and reliable operation of the key. In order to improve the comfort of the elevator and the reliability of the operation, now with PLC to control the operation of the elevator, which greatly improved the performance of the elevator.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range