Single Cage Building Hoist SC120

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
50 m/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Guangxi Heqing Construction Machinery Manufacture, established in 2004, is a private enterprise specializing in R&D, designing, manufacturing, selling and leasing of construction machinery, mainly producing builder hoist, mast climbing work platform, superdeck loading platform, temporary suspended platform, building maintenance unit etc.

Taking product sale and leasing as the basic market strategy, the company has effectively built “Heqing” and provided steady cash flow. On one hand, it pushes the independently developed builder hoist, mast climbing work platform, superdeck loading platform, suspended platform and other standardization products to Germany, Sweden, Australia, Malaysia, Singapore, India, etc.; on the other hand, it energetically expands leasing business of builder hoist, superdeck loading platform, suspended platform and other products. Till now, we have established leasing branches in Guangxi, Beijing, Shanghai and etc. Besides, according to the different requirements of customers, our company actively develops design, production, sale and other business of building maintenance system, steel aluminum shuttering and other non-standard building machinery and metal parts.

High-quality technological management team and first-rate production and detection equipment lay good foundation for the steady development of the company. Its technology and management personnel, including many senior engineers, have college degree or above, and skilled workers mostly have vocational school degree or above. The company also has over 200 general and special production equipment and over 300 measuring instruments for detection. The company passed the certification of ISO9001 Quality Management System in 2002, providing reliable guarantee for the management system and product quality.  

Our “Heqing” concern requirements of modern city construction and strive to provide products with advanced technology and rational price, furnish good technical support and pre and after-sales service for customers. We hope to create beautiful future with customers.

Corporate Vision

Vision:Become an ever-green construction machinery enterprise and maximally meet customers’ requirements
Core Values】  
Quality: High quality, innovation, safety and reliability.
              High quality is the basis of the enterprise.
              Innovation is the soul of the enterprise.
              Safety is reverence to life.
              Reliability wins the trust.
Service: Customer focused, customers are existence value of Heqing people, do what we have promised.
Responsibility: Attentive and responsible, brave to undertake and fully perform individual, company and social responsibility.
Spirit
Hard Work:Industry, simplicity, perseverance and hardships are the source power of Yuhuaxing to achieve transnormal and leapfrog development.
Struggle:Concentrated reflection of brave advance, assiduous seeking, brave challenge and enthusiasm and progress of Heqing people.
Pioneering & Progress::Promote traditions, keep pace with the times, have the courage to innovate and pursue excellence in work

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to save the elevator
I am engaged in maintenance, you say this situation is very rare, very little, do not know? There is a possibility, that is overload, so advise you not to squeeze the elevator. Normally the elevator will not fall. Even if it is overloaded fall, nor is you imagine the free fall, as the speed will not be very fast. The elevator has a lot of protection devices, even if the same protection device failure, can not fail at the same time, so the elevator is safe, the elevator for more than 100 years, you heard someone in the elevator from falling above the fall of the people? No. The elevator has to kill people, but are not falling when people died in the elevator, dead mostly elevator workers. Belong to the illegal operation, their own play dead. So the elevator failure, do not panic, stay inside do not tamper on the line, no life dangerous. As for the TV on the knees to bend like, no need. Right is immediately by the elevator phone keys, notify the professionals to deal with. Do not arbitrarily Pa door, tamper with the like. If the phone is unreasonable, mobile phone, mobile phone nowhere, pat on the car door, propaganda. Hope to adopt. Thank you
Q:The house has been renovated, no reserve wells, but now want to install the elevator, how to do?
Can you elaborate
Q:Whether the elevator can be combined with the fire elevator
Choose to try to rely on convenience evacuation of the elevator. For the main part of high-rise civil buildings, the floor area of not more than 1500 square meters, should set up a fire elevator; more than 1500 square meters, less than 4500 square meters, should be set up two fire elevators; each floor area of more than 4500 square meters , Should be set up three fire elevator. The fire shaft of the fire elevator should be set separately, and no other electrical piping, water pipes, trachea or ventilation ducts shall pass. Fire elevator should be equipped with front room, the front room should be equipped with fire doors, so that it has a fire and smoke function. Fire elevator load should not be less than 1000 kg, the car's plane size should not be less than 1 m × 1.5 m, its role is to be able to carry large-scale fire fighting equipment and life-saving stretcher.
Q:What are the doors of the elevator?
1: you are talking about the 6-sided body, one side is the door (car door), or how it will open? 2: each layer also has a door, we called: hall door 3: car door is with the elevator up and down together The car door open, while the mechanical drive to drive the door at the same time open is so simple, you do not understand, you can ask me again
Q:Why is the gearless traction machine installed in the elevator?
General elevator only down safety protection device, that is, the general said the speed limiter and safety gear and wire loss
Q:How to determine the balance coefficient of elevator GB
The balance factor (K) is a familiar and unfamiliar parameter for elevator professionals. It is known because we all know that the traction elevator has a balance of the weight of the configuration, all know that the national standard in the provisions of the balance coefficient should be in the range of 40% to 50%. (1) directly weighing P and W balance coefficient K is not a mysterious parameter. In the final analysis it is to configure the weight of the weight of the weight, so the balance coefficient K is determined by the balance coefficient design value to configure the weight. This method is cumbersome to operate, and the other parts of the weighing is difficult to achieve without omission, generally not applicable. (2) According to the known K value, the weight of the weight is determined from the balance coefficient K. When the load corresponding to KQ / H is loaded in the car, the static moment on both sides of the traction wheel should be balanced. If you know the design value of the balance factor, simply load the load and verify that it is balanced. The easiest way to verify is to release the brake on the mainframe, and use the manpower to feel the torque balance on both sides of the traction wheel on the hand wheel to increase or decrease the weight. (3) According to the existing weight, it is recommended to use the method of measuring the traction motor current on the national standard. The basic principle is: when the elevator for uniform operation, the traction motor shaft output torque converted to the motor shaft, the elevator mechanical transmission resistance resistance torque (referred to as resistance torque)
Q:How does the elevator work?
Through the cable link car river weight, the motor is reversing, driving the cable to
Q:Analysis of the causes of broken wire rope in elevator
1 wire rope hardness is too hard, or traction wheel is too hard, tightening force uneven, are chu stool to avoid segment seal lights over the dog can dial, 2 the best all replaced, because the old and new rope with the time is not the same, rigid Not the same, if you buy the rope is not the same, the force is not the same, the amount of wear is not one, easy to pull the lead wheel, there is no standard,
Q:What is the reason why the elevator door is always open and closed when not in use?
Elevator control cabinet in the elevator door system board failure, usually 3 tube or capacitor is broken, get the maintenance of the car to hurt the factory to sell it off the board I am the same day before the same problem, just repair.
Q:What are the eight systems of the elevator!
Eight systems: traction system, guidance system, car, door system, weight balance system, electric drive system, electrical control system, safety protection system

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range