Simple Thermostat For Floor Heating System

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
50000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description:

Electric thermostat for floor heating  or hot water radiator heating systems 

Model Number: TR90


Specifications

TR90 floor heating room thermostat 

Temperature range:5-30 C 

Contact capacity: 16A(4)/250V 

Sensor type: gas filled sylphon

Diamension: 80X80X37MM 

Voltage: 110(± 10%)VAC / 220(± 10%, -15%)VAC, 50/60Hz  24VAC ( option)  

Differential Temperature: 1 ° C Max 

Setting Temperature Range: 5° C~35° C 

External Limitation: 5°C~60°C( factory setting 35°C) 

Mounting: Mounts directly onto wall or wall-box 

Temperature range: 0° C - 40 ° C 

Sensor type: NTC 

Color: White ivory 

Relative humidity: < 85% (23 ° C) 

Housing material: anti-flammable PC

Dimensions: 86mm× 86mm× 13mm(H/W/D) 


Basic function: 

1. Recommended for control of underfloor heating and electrical heating. 

2. Electronic on/off control up to 3600W, 16A or 6000W, 30A 


Photo:

Simple Thermostat  For Floor Heating  System


FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to solve the heat pipe plug?
Plumbing heat pipe after 2-3 years, the tube wall will produce a lot of accumulated dirt, resulting in inadequate water flow, heat is not enough, heating effect caused a great impact, this time you need to use the warm pipe cleaning equipment to solve the warm pipe Blocking the problem, to warm the pipe dredge commonly used tool is to warm the pipeline dredge machine. In order to clean the pipe, it is necessary to use the correct way to clean, otherwise it will cause unnecessary results.
Q:Solar water heater mixing valve pressure balance
You can choose a thermostatic valve
Q:Dual-use boiler problem
Now the boiler is divided into two kinds, casing machine and plate replacement machine. Casing heat exchanger that tube tube heat exchanger, living hot water casing is nested in the main heat exchanger, the priority of running hot water running by the pump to stop, when the life of hot water running water pump Stop working, through the main heat exchanger within a high temperature water heating casing within the hot water. Plate-type exchange is through a plate heat exchanger to heat the hot water, the priority of running hot water by the electric three-way valve to complete, when there is a demand for hot water, Three-way valve will be the main heat exchanger within a high-temperature water into the board for heating domestic hot water.
Q:Water pressure test should meet the requirements
(1) The hydrostatic test shall be carried out after the system has been flushed. (2) water pressure test should be per component, the collector as a unit, by group or by loop. (3) water pressure test should be carried out twice, respectively, before the pouring of concrete before the reign of rough rougers and the filling layer after the expiration of the maintenance of the filling tube; the best heating pipe laying before doing a test. (4) the test pressure should be 1.5 times the working pressure, and should not be less than 0.6Mpa. (5) test method: the test pressure, the regulator 1h, observe the pressure drop, if the pressure drop is not greater than 0.05Mpa, that qualified. (6) water pressure test should be used to slow down the manual pump, boost the process to observe and check the presence or absence of leakage. (7) in the case of freezing may test pressure, the pressure test pressure should be completed after the tube of water to dry, but only the air pump is blowing is not clean, it is recommended to use warm cleaning special tools, Each road tube, for drainage, so that the real guarantee of each tube, there will be no drop of water to ensure that no pipe freezing, practice has proved that there are many use of air pressure test.
Q:Home coal-fired heating stove and electric heating furnace which is good
Coal, cheap to save money. Electricity, clean and easy to control, expensive
Q:What are the heating components of the heating system design?
In the design of the design, the design of the heating system is based on the basic heat consumption and the additional (corrected) heat dissipation of the envelope. The basic heat consumption refers to the sum of the stable heat transfer from the room to the outside through the various parts of the room envelope (doors, windows, walls, floors, roofs, etc.) under design conditions. Additional (modified) heat consumption refers to the heat transfer of the envelope structure changes the basic heat consumption to correct the heat consumption. Additional (corrected) calorie consumption includes the amount of heat applied to the correction, wind addition, height addition and external door addition.
Q:Is the carbon crystal warmer than the other? Where is it?
Carbon crystal to warm the advantages of: 1. durable and reliable carbon crystal to warm all underground buried parts can guarantee more than 50 years of service life. Carbon crystal heating plate can guarantee 100,000 hours of continuous work without trouble. 2. Heating efficiency of high-carbon crystal tiger ridge Hong Kong Fan Fan huan song but attack the warm heating plate "electric --- hot" conversion efficiency is extremely high, by the national professional testing, "electricity --- hot" conversion rate to More than 99%. 3. Heating speed Fast carbon crystal to warm the board of the excellent surface heating characteristics, so that the system work, to maximize the entire ground plane at the same time, synchronous heating. Is the fastest heating rate to warm the system. 4. Construction of a simple carbon crystal to warm the minimum to meet customer "one square meter" of heating requirements. 100m2 to warm the installation of construction, a group of workers (2) a day and can be laid to install the construction is completed. 5. Health and environmental protection situation, heating up quickly, fever fast. Power 30 minutes to heat. Carbon crystal heating plate directly on the indoor radiation heat, the temperature rise faster than the traditional plumbing and heating cable more than 5 times faster.
Q:You are registered or heating works basically useless...
Home wall boiler attention to what the use of boiler concerns...
Q:Can the warm pipe be used as a drinking water pipe?
PE-RT tube heat-resistant polyethylene pipe, is Polyethyleneofraisedtemperatureestistancepipe English abbreviation, is a hot water can be used for non-crosslinked polyethylene pipe, it was highlighted its non-crosslinking characteristics, called it "high temperature non-high temperature Cross-linked polyethylene tube ". It is a kind of medium density polyethylene produced by special molecular design and synthesis process. It uses ethylene and octene copolymerization method to obtain the unique molecular structure by controlling the number and distribution of side chains to improve the PE pipe Heat resistance. Due to the presence of the short chain of octene, the macromolecules of PE can not crystallize in a lamellar crystal, but rather penetrate through several crystals to form a bond between the crystals, which retains the good flexibility of the PE tube, High thermal conductivity and inertia, while making it more resistant to pressure, this modification method and the current market similar to the PPR tube. PE-RT tubing can be used for all levels of use of hot water pipes specified in ISO!
Q:Home gas boiler why the circulating pump is always non-stop turn?
Gas boiler water pump will automatically start and stop according to the water temperature, under normal circumstances during the water pump is kept non-stop. Because the pump operation can make the system temperature uniformity, the temperature inside the furnace can reflect the system temperature. But not all brands of fireplaces are so. So the pump motor is not working properly.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range