Silt Fence/ Woven Geotextile with 100gram

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
5000 m²
Supply Capability:
1000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:
1.Woven Geotextile Description:
A silt fence, also referred to as a filter fence, is a structure composed primarily of geotechnical fabric and that is used as a form of sediment control.These temporary barriers are relatively low in cost, especially when compared to the damages they can prevent. They keep loose soils from traveling into local bodies of water and they also minimize the impact that various forms of development can have on surrounding wildlife.
2. Woven Geotextile Functions and Features:
1)Excellent weed control
2)Excellent UV resistance
3)Moisture,fertilizers,air reach plants to allow for healthy soil
4)Good water and air permeability
5)Exceptional toughness and strength
6)Durable,tear-resistant,anti-rot and anti-mildew
7)Light weight,easy to install,follows natural ground contours


Silt Fence/ Woven Geotextile with 100gram


Silt Fence/ Woven Geotextile with 100gram

Silt Fence/ Woven Geotextile with 100gram

Silt Fence/ Woven Geotextile with 100gram

Silt Fence/ Woven Geotextile with 100gram

3.. FAQ:
Q1: What is your minimum order quantity?
A:The minimum order quantity is 5000 ,but it is negotiable.
Q2:What is your payment terms?
A: T/T,Western Union,Paypal,L/C...
Q3:What is your delivery time?
A:Production time usually costs 2-20 days.
Waiting to cooperate with you!

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the use of the black network when the shop is paved?
Black net Is a grid geotextile bar. Geotextile isolation: the use of geotextiles with different physical properties (particle size, distribution, consistency and density, etc.) of building materials (such as soil and sand, sand and gravel, soil and concrete, etc.) to isolate. So that two or more materials are not lost, not mixed, to maintain the overall structure and function of the material, so that the structure of the load capacity to strengthen. 2, filament geotextile filter: When the water from the fine soil into the coarse soil layer, the use of acupuncture geotextile good permeability and water permeability, so that water through. And effectively cut off the soil particles, sand, small stone, etc., in order to maintain the stability of soil and water engineering. 3, filament geotextile drainage: geotextile is a good water guide material, it can form a drainage channel in the soil structure, the soil structure of the excess liquid and gas excluded. 4, filament geotextile reinforcement: the use of geotextiles to enhance the soil tensile strength and resistance to deformation, enhance the stability of the building structure to improve soil quality. 5, filament geotextile protection: the effective concentration of concentrated diffusion, transmission or decomposition, to prevent the soil by external force and damage. 6, filament geotextile closure: geotextile and other materials (asphalt, plastic film) with the formation of impermeable in the soil layer. (Mainly for road resurfacing, repair, etc.).
Q:Concrete pavement or geotextile
Do not add, with the asphalt Ma plug Seal if you have to choose the best choice for geotextile waterproof the best
Q:15 km highway how much geotextile
Depends on how wide your road, come to the square, you know about how much. Manufacturers produce geotextiles
Q:I need help with a display. Need to display geotextile samples? Help!?
Brittney420? My type of woman! We should hang out, my name is Art and you can message me if you want my number. I'm 6' 160 Pounds, I got a job, a HUGE house and a dog. Sorry I couldn't answer your question though.
Q:Geotextile, geomembrane to go to the laboratory test
1. Geotextile, geomembrane whether it is necessary to go to third-party laboratory testing is mainly to see the construction side or supervision unit requirements, if the construction side or the supervision unit clearly requires the authority of the third-party laboratory for testing, then you need to go Laboratory testing. 2. If there is no clear requirements, in general geotextile, geomembrane factory manufacturers will have a qualified factory self-test report, substandard products will not be factory, the other construction side will generally have their own experiments Room on the geotextile, geomembrane for testing, manufacturers and construction side of the test results are qualified, no special requirements are not going to third-party laboratory testing, and only one of the two sides of the test results have objections Go to a third party laboratory for testing.
Q:Geotextile Commission test how many square meters
Geotextile performance testing generally need 1-2 square meters is enough. My company specializing in the production of geotextiles, often come to take samples to detect, are generally 1-2 square meters
Q:What is the specific use of geotextile construction site?
Hello, play the role of reinforcement, the use of the filter depends on the design requirements is calculated by square method Huazhi geotextile material manufacturers for you to answer
Q:Do you need to suture the lower geotextile of composite geomembrane?
Under normal circumstances without suture (stretch, overlap to a piece like), just the geomembrane welding, the top layer of geotextile with a hand sewing machine sewing can be geotextile as a protective layer of geomembrane, to protect the impermeable layer In order to reduce the UV radiation, increase the anti-aging performance, it is best to use the laying method of laying.In the construction, the first use of smaller diameter sand or clay to find the base surface, and then laying, Too tight, buried at both ends of the soil part of the corrugated, and finally in the shop on the two cloth a film with fine sand or clay shop layer of 10cm over the layer. Puzzle 20-30cm stone (or concrete prefabricated block) For the protection of the layer.When the construction, should try to avoid the stone directly hit on the best side of the film side of the protective layer of the construction of the two cloth a film and the surrounding structure should be connected with expansion bolts and steel plate pressure bar anchor, The connection part to brush the emulsion asphalt (2mm thick) bonding, to prevent the occurrence of leakage. Construction joint processing is a key process, a direct impact on seepage effect. General seam way: ① lap: lap width Should be greater than 15cm; ② heat welding: suitable for slightly thick geomembrane substrate, weld lap width of not less than 5C M
Q:Filament geotextile in the storage should pay attention to what matters
Do not explode, or do not store in a dark, wet place, avoid rain
Q:Pvc waterproof board and geotextile must be used with what
To stick together, I specialize in producing pvc waterproof board and geotextile and other geotextile materials

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range