Shield Cable 300/300V

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
50 Box m.t.
Supply Capability:
200tons/month m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Packaging of Shield Cable 300/300V

Packaging Detail:

25kg/bag,kraft paper bags with plastic bags inside

Delivery Detail:

15 days

Specifications of Shield Cable 300/300V

1,for wire or cable sheath

2,quality SGS and ISO9001

3,delievery time 7 days

4,the highest temperature is 70

 

this product is used for wire or cable sheath.

Delivery of Shield Cable 300/300V

 

PROPERTY

UNIT

SPECIFICATION

TEST

HR-70

JR-70

tensile strength 

Mpa

MORE THAN16.3

≥16.8

GB1040

Elongation at break

%

320

310

GB1040

Thermal agining 100°C 168h

--

--

--

--

tensile strength at aging

Mpa

15.4

16

GB1040

Maximum change rate of Tensile Strength

%

-7.1

-4.8

--

Elongation ate Break after aging

%

300

290

GB1040

Maximum change rate of Elongation at break

%

-11.8

-6.5

--

Weight Loss after Thermal aging

g/cm3

9.6

11.2

--

Thermal deformation

%

45

35

--

Brittle point of Low temperature impact

°C

(-)40pass

(-)40pass

GB5470

Thermal stable time at 20°C

min

100

95

--

Volume resistivity at 20°C

Ω.m

5.6*1010

2.2*1013

GB1410

Volume resistivity at working time of 20°C

Ω.m

--

3.5*109

GB1410

Dielectronic strength

mv/m

28

27

GB1408

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Ipad charging display does not support this accessory
Ipad charge display does not support the general reasons for this and processing methods: . for non-original charger, it will often appear this situation, which is due to the charger does not meet the specifications caused by the replacement of a qualified charger can be. . if the original charger appears the above failure, please continue to look down. . please check whether the data line is normal. The appearance of the data lines seem normal, which may have been broken. Check the method is to borrow someone else's data line to see if it can charge. . shows the plug symbol is normal is full of display. If full or show the lack of electricity, indicating that the phone tail no problem. . again, check whether the original charger can work properly. You can connect the charger to other USB port to see if the phone is working properly. . if the above two check still can not charge, please try to insert the computer's USB port to see if the computer can identify the phone, to identify if it is to see if the charge, if not identified but not charged, it is estimated that the need for maintenance. If you can not identify can not charge, it is necessary to repair. If you can recognize and charge, replace the data cable and the charger (the original estimate is also damaged). . and then look at the voltage is not too low, not only to the maintenance station to repair, and pay attention to the iPad and iPhone do not mix the power adapter, the voltage is different.
Q:What is the cable for rvv? Is it a power cable or a control cable? What is the cable?
The installation process is a certain requirement, high and low voltage cable bridge should be installed separately as usual, a wall laying vertical pipeline (slot) or installation equipment, the power distribution between the depth of D1 = 1200 ~ 1500mm; weak Between the deep distance from the D2 = 1100 ~ 1400mm more reasonable. The length L1 and L2 between the power distribution and the weak can be determined according to how much electrical equipment and pipelines (slots) are installed in the room. "Civil building electrical design specifications" proposed "shaft size in addition to meet the wiring spacing and terminal box, distribution box layout must be the size, but also in the box before the left not less than 0.8m operation, maintenance distance" requirements. In the weak equipment, the operation and maintenance distance is not specified in the provisions of the Code for Electrical Design of Civil Buildings, but it should not be less than 0.8m. Cable to wear steel pipe wiring, should be reserved in the floor steel pipe, wiring should be completed after the plug fire fire blocking material. Cable bridge installation should be horizontal, the maximum sag should not be greater than 10 mm; proposed separate installation
Q:What is the difference between wires and cables?
The introduction of the device is to introduce the cable into the electrical equipment, without changing the explosion-proof type of explosion-proof equipment
Q:When pouring concrete is how to put the tube
Line pipe is poured before the concrete is laid on the cloth, fixed on the template or steel, pouring a need to install a class at any time to adjust its position!
Q:What is the difference between "wire" and "cable"?
Inkjet printer is not printed, pictorial machine high definition, generally used in the advertising industry, for large outdoor advertising, the nozzle can choose not necessarily the number of installed, the more spray, spray the faster, a nozzle of the general life 1 year.
Q:Building decoration wiring pipe elbow with yellow wax tube can you?
Indicating that your Apple data cable is not original, no effect, re-plug the general and you can use the.
Q:Connect the computer to the TV. The The Using the HDMI cable. The The Line no problem. The Why not even after the audio video. The The Amplifier is Denon 1311
Make a mark, such as red set into the bottom for a color in a layer, or you can draw a few plans, water and electricity is a strong power is a weak and one, the label can do a good job
Q:What kind of KVM switch is this configuration below?
Hello according to your request can be used two sets of ordinary 16 cascade, to a control terminal control 32 hosts. Is the cheapest solution. According to my understanding of the domestic Haikang series of products cost-effective, you can understand the next.
Q:A five-hole dual-socket how to connect the wiring, the electrician line to go three lines, the switch can use a single socket did not take their own hands
Bookstore tool book should have "communication project budget", I do is what you say, the budget is divided into estimates and budget, is two steps. So that is not very clear. But what is needed is the preliminary design of the project. The budget is needed for design and drawings. Internal management of this piece, the main thing is that you need to do what the project department, and are generally very complicated
Q:Wire pipe inlet air switch trip how to do?
Wire pipe water problem: In fact, this problem is very serious, then this line should be scrapped or replaced, if you continue to reluctantly use not only to bring you the safety of trouble and the insulation of the wire dropped sharply! Because there is water it will lead to internal leakage can also make the wire heat caused by wire burning and trivial trivial accident, so be sure to take the necessary replacement! Supplement: the wire out of all, with the wire to grab the absorbent gauze and the like back to the twitching, many times for the gauze to dry the water, hair dryer toward the tube to heat the tube to dry and then re-layout of the new line.

1. Manufacturer Overview

Location Dongguan, China
Year Established 2005
Annual Output Value USD50,000,000.00
Main Markets Southeast Asia;Mid East; Domestic Market
Company Certifications ISO9001-2000

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Guangzhou
Export Percentage 70% - 80%
No.of Employees in Trade Department 50 People
Language Spoken: English; Chinese
b)Factory Information  
Factory Size: Above 100,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered; Design Service Offered
Product Price Range High; Average