SHENDIAO TOWER CRANE TC5510

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
10 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

RVF + orientation
The RVF Optima + orientation enables gentle rotating movements without jerking.
Fully integrated progressive control.
Driving adapts to the behavior of the crane operator:
•  Traditional driving thanks to action controlled by stoppage of the command. The slow-down phase of the jib is managed by the frequency variator in this case.
•  Or by an inverted command in the slow-down phase, called a «counter-orientation» command.
As a result, the crane operator can control stoppage.

The design of the electric sockets allows simple and quick connectionon all sites.
Whilst operating or transporting, the cables are integrated and/or stored easily in the crane, increasing the service life of the electrical equipment and providing optimal conditions of safety.
•  There is a special channel for electric wiring in the counter-jib.

Considered to be the parent range to tower cranes,
MD cranes have been around since the beginnings of the Potain brand. This range is the pillar of all Potain product know-how.
Constantly evolving to meet market expectations, these cranes are equipped with the latest technological innovations and boast the best performance possible.

Technical characteristics
•  Jib lengths of between 30 m and 80 m, per 5 m section.
•  Max. load of 10 to 40 t.
•  Hoisting power ranging from between 50 and 150 horsepower.
•  The masts used are K400 (1.6 m), K600 (2 m), K800 (2.45 m) and K850 (2.45 m, reinforced).

All the components of the MD range are designed to minimize the total number of trucksrequired to transport them between sites.

The jib components can house the jib tiesto make transport easier and quicker.

Thanks to the factory-performed pre-reeving and the auxiliary winch supplied as standard, assembly of the jib and counter-jib ties can be carried out quickly and in total safety.

The mechanisms are always used at full power. When hoisting, the speed is optimized according to the load and command used. In distribution, progressive variation of speedand the maximum speed are adapted to the weight of the load. In orientation, there is controlled proportionalspeed with optimal acceleration and deceleration in accordance
with the maximum admissible torque for the mast.
The auxiliary winch can be used on the derrick: this provides users with the possibility of a motorized derrick at the base of the machine.

DVF Distribution
The jib-footDVF mechanism is easily accessible in total safety.
Progressive speed variation by proportional control.
The speed depends directly on the controls manipulated by the crane operator.
To make driving the crane easier, 2 hard spots integrated into the controlsprovide better pinpointing of the speed.

With different mechanisms (33 to 150 LVF Optima or 108 to 215 hp LBR), MD cranes are capable of high working speeds through optimizing speed in accordance with the load hoisted, allowing for gains in productivity.
•  For the first increments (approach speed, sling tension, etc.) hoisting of the load is controlled by the load security
device (a proving ring).
•  For working speeds, the Optima system adapts the speed in accordance with the load hoisted. This enables full power of the motor to always be used for optimum productivity.
The LVF Optima provides a gain of around 25% in descending speed.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:When the tower crane top height is more than meters
(two) lifting equipment installation with lifting weight 300kN and above; demolition work of climbing crane within height 200m and above.The installation and disassembly of the tower crane in accordance with the provisions of the above provisions shall be verified by the expert panel.
Q:There is no CAD map attached to embedded parts of tower crane?
What size do you want?. Each model is different. For example, the 5010 tower bolt embedded needs 24.
Q:Why do tower cranes need to be fabricated?
The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3-4 times the same structure light steel wire rope (laboratory comparable conditions) with the research on the wear resistance of phosphating, and greatly enhance the possibility of. Manganese phosphating is bonderizing, can solve the wear problems of wire rope used in the process, according to the current market situation of wire rope, manganese phosphating coating of steel wire rope price is higher than that of plain steel wire rope, and prolonging the service life of much higher than the rate of price increase, so the phosphating coating steel wire rope daily use fee is only plain steel wire 30-45% rope, the use of lower cost, higher cost, smooth steel wire rope is eliminated. For reference only
Q:Tower crane and construction hoist service life? What are the norms and standards? How to detect?
The tower crane service, QTZ40 state (including 40) the following ten years, more than QTZ63, the age of fifteen years, the construction elevator used for ten years; but specific to various provinces and cities are different, such as Jiangsu Province, the 40 tower crane can be used 8-10 years, QTZ63 tower crane used for 15 years, 8 years of construction hoist. Of course, we should not blindly look at the provisions, tower cranes and the use of strength sometimes determines the life of it!
Q:What should the sub contractor do before the installation of the bridge crane in the workshop?
Baidu search [tower crane tower demolition, lowering section safety technical disclosure]. If it is installed, remove the "two words" to "installation", and other contents are adjusted slightly.
Q:What is an attached tower crane?
Its weight is 5 ~ 100kN, lifting radius of 3 ~ 35m (trolley), the lifting height is 160m, the maximum lifting torque of 1600kN - m, each with high 2.5m, the QT4 - 10 type crane lifting system comprises a lifting sleeve frame, long stroke hydraulic jack, bearing seat, lifting beam and a positioning pin. The cylinder block of the hydraulic jack is installed on the support seat at the bottom of the tower, and the lifting process can be divided into five steps.
Q:What does tower crane jacking up mean?
Attached tower crane upper work structure and the lifting sleeve frame connected to the lifting sleeve frame is installed on the lifting jack.
Q:What are the parts of a tower crane? What are their main functions?
The tower crane is mainly composed of a tower body, door frame, tower, tower cap, boom, arm and other metal structure and balance hoisting, luffing, slewing mechanism operation, composition and electrical system and safety device etc.!
Q:Calculate the tower crane gantry crane
It's a gantry crane, not a tower crane
Q:What is the safe distance of a tower crane to the surrounding buildings?
It's 5 meters up and down. Outside the radius of rotation is 3 meters, such as QTZ5010, tower crane rotating radius type, 50 meters in diameter, one hundred meters outside the scope is safe

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range