SHENDIAO TOWER CRANE TC5010

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
10 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

The mechanisms are always used at full power. When hoisting, the speed is optimized according to the load and command used. In distribution, progressive variation of speedand the maximum speed are adapted to the weight of the load. In orientation, there is controlled proportionalspeed with optimal acceleration and deceleration in accordance
with the maximum admissible torque for the mast.
The auxiliary winch can be used on the derrick: this provides users with the possibility of a motorized derrick at the base of the machine.

DVF Distribution
The jib-footDVF mechanism is easily accessible in total safety.
Progressive speed variation by proportional control.
The speed depends directly on the controls manipulated by the crane operator.
To make driving the crane easier, 2 hard spots integrated into the controlsprovide better pinpointing of the speed.

With different mechanisms (33 to 150 LVF Optima or 108 to 215 hp LBR), MD cranes are capable of high working speeds through optimizing speed in accordance with the load hoisted, allowing for gains in productivity.
•  For the first increments (approach speed, sling tension, etc.) hoisting of the load is controlled by the load security
device (a proving ring).
•  For working speeds, the Optima system adapts the speed in accordance with the load hoisted. This enables full power of the motor to always be used for optimum productivity.
The LVF Optima provides a gain of around 25% in descending speed.

RVF + orientation
The RVF Optima + orientation enables gentle rotating movements without jerking.
Fully integrated progressive control.
Driving adapts to the behavior of the crane operator:
•  Traditional driving thanks to action controlled by stoppage of the command. The slow-down phase of the jib is managed by the frequency variator in this case.
•  Or by an inverted command in the slow-down phase, called a «counter-orientation» command.
As a result, the crane operator can control stoppage.

The design of the electric sockets allows simple and quick connectionon all sites.
Whilst operating or transporting, the cables are integrated and/or stored easily in the crane, increasing the service life of the electrical equipment and providing optimal conditions of safety.
•  There is a special channel for electric wiring in the counter-jib.

Considered to be the parent range to tower cranes,
MD cranes have been around since the beginnings of the Potain brand. This range is the pillar of all Potain product know-how.
Constantly evolving to meet market expectations, these cranes are equipped with the latest technological innovations and boast the best performance possible.

Technical characteristics
•  Jib lengths of between 30 m and 80 m, per 5 m section.
•  Max. load of 10 to 40 t.
•  Hoisting power ranging from between 50 and 150 horsepower.
•  The masts used are K400 (1.6 m), K600 (2 m), K800 (2.45 m) and K850 (2.45 m, reinforced).

All the components of the MD range are designed to minimize the total number of trucksrequired to transport them between sites.

The jib components can house the jib tiesto make transport easier and quicker.

Thanks to the factory-performed pre-reeving and the auxiliary winch supplied as standard, assembly of the jib and counter-jib ties can be carried out quickly and in total safety.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Method for operating tower crane
2.21, drivers must pass the escalator up and down, up and down the escalator, hand tools are prohibited items.2.22 do not drop any objects from tower cranes or defecate.2.23 winter in tower crane operating room heating, should be taken to prevent electric shock and fire measures.2.24 any tower crane with an elevator must comply with the instructions in the elevator manual. No overloading or violation of the operating procedures.2.25 multi machine operation, should avoid two or more than two tower cranes overlap in the radius of rotation. Special circumstances, need to overlap operations, must be safe distance between the vertical arm to ensure the safe distance and the lifting of materials, and have reliable safety measures approved by the competent technical leadership before construction.2.26 jib cranes in heavy lifting off the ground after lifting, rotating and walking three actions can be done at the same time, but the amplitude only alone, strictly with variable load. A crane that allows variable amplitude loading shall not vary at full load or near full load.2.27 lifting hoist is not installed in the rotating part of the crane, lifting operations may not continue in one direction continuous rotation.2.28 a crane with a mechanical torque limiter must adjust the tonnage indicator of the overload limit device according to the radius of gyration and the rated load at that radius.2.29 bend rail subgrade must comply with the provisions of the crane should turn on the outer rail surface of the sand, rail, rail and wings painted with grease. The counterweight box shall be turned to the direction of the outward turn. It is strictly prohibited to do lifting or turning on heavy roads.
Q:Tower crane and tower crane 5
Tower crane, tower crane, also known as tower craneTower crane = tower crane = tower craneThere are many ways of vertical transportation. Construction elevator hoist etc..Tower crane features: large operating space, mainly used in housing construction materials vertical and horizontal transmission and installation of building components.It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q:Emergency treatment of interrupted electricity during lifting of tower crane
It is very dangerous to stop the electricity during the lifting of tower crane. Because the slewing brake is missing, the tower crane is very dangerous because the wind rotates.
Q:How many meters of cranes should be in accordance with the anemometer?
The state specifies the installation of wind speed meters for outdoor cranes!AskMore than how many meters need to be installed, or as long as it's outdoor, it needs installationChasing the answerThe provisions of the People's Republic of China national standard GB 6067.1--2010:9.6.1.1 high speed cranes for outdoor work shall be equipped with an anemometer. The anemometer shall be installed on the windward side of the crane.9.6.1.2 high speed cranes for outdoor work should be equipped with an air speed alarm that displays instantaneous wind speed, and when the wind speed is greater than the working wind speed setting value, the alarm signal should be sent out.
Q:The rated lifting capacity of a tower crane refers to what is allowed and what is allowed to be divided by the crane
The total quality of the crane rated liftingweightincludes the lifting load and the hook and rope a simplified example, such as the rated lifting weight of 100 tons, the quality of the hook and spreader for 5 tons, the actual quality of the goods can lift 95 tons.
Q:How about the installation and disassembly of the tower cranes?
Authorized by the national security inspection department, the local special operations training school or the technical quality supervision bureau, after the study, assessment, qualification and graduation permit, will give you special operations installation, removal operation certificate.
Q:What are the qualifications for site installation and acceptance of tower cranes and construction lifts?
This really did not hear, the site installed to be tested, usually installed, in accordance with the safety procedures, acceptance of the OK
Q:Can the tower crane personnel install the construction elevator?
Although it belongs to the construction of special operations, but the operation of different categories, tower crane demolition workers according to the requirements can not install the elevator!
Q:What does "slewing up" and "under rotating" in the slewing form of a tower crane mean?
In short, when the tower rotates in the form of a tower, the tower is stationary (ie does not follow the rotation), and the form of the lower turn is the tower will rotate.
Q:What is the free height of a tower crane?
The free height of large tower cranes can be up to 100 meters.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range