SHENDIAO CONSTRUCTION HOISTS SCD200/200

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
10 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

The masts adopt the standard bases from the MC range, allowing it to be adjusted to the desired height.
The adjustable bases are of the same type as those of the MC crane range, providing a choice of method of installation:
• on fixing angles,
• on cross-shaped base,
• on travelling gear,
• or as a climbing crane.
For easier management of your crane fleet, the standard elements taken from the MC range are assembled using pinned fish joints for ease and speed of connection.
|MCT 88|

MCT cranes are available with a wide range of optional features:
• Vision cab with or without air-conditioning
• Dialog VISU indicators
• Dialog Wind anemometer
• Top Tracing interference control and zone limitation system
• Remote control unit with indicator
• Automatic cartridge lubrication
• Auxiliary winch

• 5 models.
• Jib lengths from 40 m to 52 m.
• Maximum load from 2.5 to 5 tons.
• Maximum hoisting speeds from 2.8 to 82 m/min.

Fitted with jib lengths ranging from 55 to 65 m, the MDT Topless cranes boast hoisting capacities of 6 to 10 t.
Providing a suitable size for all your needs.
They allow complex multi-crane installations by considerablyreducing the height gaps and interference of cranes on work sites.
The assembly, erection, transport and even maintenance times are reduced, and as a result this helps to keep operating costs low.
Optimum productivity and greater safety make MDT Topless cranes the best alternative for all users or hirers.

Elegance and distinction
Their new shape is easy to distinguish from a distance.
The counter-jib projects a dynamic and refined design and the profiled jib, with a regular inclination, shows a fluid and
elegant line.

Minimized, compact and light package
Transport and erection
The shapes, dimensions and weights of the components were devised right from the design stage to scale-down the
package and save time. Only a single, small, mobile crane is required to hoist the packages and assemble them.

Assembly of the
counter-jib on the
ground
The compact counter-jib has a reduced footprint, ballast supports and
stabilizer plates designed to be folded
away for transport.
The nose and stabilizer plates can be
simply unfolded which releases the
guardrails.
Assembly of the jib on the ground
Operation of crane fleets can be optimized thanks to the possibility of exchanging certain components of the crane jib with other models from the same range

Counter-jib ballast blocks with inclined bases are used for simpler dismantling on the ground, since they can be laid down easily.
No locking mechanisms are necessary, and the counter-jib can be unfolded easily.

Pinning is quick and simple thanks to the centering pins of the splice.

 Variable frequency hoisting :
• permanent adaptation and optimizationof speed depending on the lifted load,
• very low slow speeds, smooth speed changes,
• high productivity.

 Variable frequency hoisting :
• permanent adaptation and optimizationof speed depending on the lifted load,
• very low slow speeds, smooth speed changes,
• high productivity.

Trolleying with variablefrequency, progressive speed by means of stepless control

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Cranes can be operated by all of the following except:?
Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
Q:What do 100 and 1000 different paper cranes mean??!?!?
A Japanese legend indicates that anyone who folds 1000 paper cranes will be granted a wish. Sadako Sasaki was a Japanese girl who died from radiation sickness from the A-bomb dropped on Hiroshima. She wanted to fold 1000 cranes before her death at the age of 12. There is a peace monument to her memory in Hiroshima, and people from all over the world send paper cranes to the site.
Q:where can i find defiance by shelly crane online for free?
did you ever get to read this book
Q:The Red Badge Courage by Stephen Crane?
The okorder.com/
Q:Can I build a retaining wall off site, and then crane it into position?
If you use precast concrete sections it can be done. You can even have a decorative side if that is required. You might need to have some form of interlocking connections to tie the whole thing together. Depending on its height there might also be a need for anchors to keep it from trying to tip. Without more very detailed information it is difficult to really answer this question. As an example: depending on the type of soil and the height of the wall it is possible to remove the existing wall and install a new one in a day if you use something like a keystone system.
Q:Any opinions on camera cranes?
Camera okorder.com/
Q:why does the power company use helicopters to service the repair lines instead of trucks with tall cranes?
High-tension lines operate at hundreds of thousands, or millions, of volts. At this potential, electricity can jump through several feet of air to reach a path to ground. This pretty much rules out using trucks, because it would be prohibitively expensive or impossible to build a crane out of entirely non-conductive materials. A helicopter is electrically isolated from the ground, so it's less difficult to drop a technician off and let him hang from the line itself while working. (It is still necessary for the technician to use a wand to bring the helicopter to the line's potential before starting work, because of the capacitance of the helicopter's body.) They could of course use a truck to service the lines if the power was disconnected, but the cost of shutting down service to an entire region of the country exceeds the operating cost of a helicopter.
Q:What is the admissible weight of a crane?
Depends on how it is transported - you have to give more information on the kind of crane and where it will be used.
Q:Operation points of tower crane (tower crane)?
Safe use requires the use of tower crane, issued by the state competent authorities shall abide by the rules and regulations, but also comply with the relevant provisions in the manual: the crane working environment temperature is -20~40 degrees Celsius, the maximum working pressure is 205N/m2, when should stop using the winds of more than 6 level; the same construction site to install more than two sets of tower crane when should pay attention to the location of each tower, take the elevation of different operations, in order to avoid the tower crane jib, balance arm collision accidents; safety device of tower crane, luffing and slewing height, mass and moment limiter, the last two more important, if the two is not detected qualified, will be regarded as the unqualified, because it plays a role to ensure the safety and prevent the tilting of the tower crane. As a construction site, the tower crane torque limiter failure or to replace the operating personnel mistakenly believe that daily only hanging 800-1000kg materials, not what the risk, the results in a process of lifting materials, because of the construction site is narrow, hanging by the operator sight blocked, hanging objects hanging on building the steel frame, caused by tower crane shaking, was the occurrence of major accidents, thanks to the ground work riggers promptly notify the operator immediately stop to avoid rollover accident of tower crane appeared. It is obvious that all safety devices on the tower crane are essential and must be checked regularly to ensure that all the safety devices are in good condition, sensitive and reliable.
Q:folding paper cranes?
A novice at origami (me) can fold a paper crane in a minute, so that's one-thousand minutes. (1000/60=16.666) so it'll only take sixteen hours. I'm only joking. Just fold one and write This may be only one crane, but has the heart of a thousand or something. (sorry for the cheesy line) I hope your grandma gets better, I know how it feels, as my brother has brain tumour.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range