SHENDIAO CONSTRUCTION HOISTS SC200/200B

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
10 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

MCT cranes are available with a wide range of optional features:
• Vision cab with or without air-conditioning
• Dialog VISU indicators
• Dialog Wind anemometer
• Top Tracing interference control and zone limitation system
• Remote control unit with indicator
• Automatic cartridge lubrication
• Auxiliary winch

• 5 models.
• Jib lengths from 40 m to 52 m.
• Maximum load from 2.5 to 5 tons.
• Maximum hoisting speeds from 2.8 to 82 m/min.

Fitted with jib lengths ranging from 55 to 65 m, the MDT Topless cranes boast hoisting capacities of 6 to 10 t.
Providing a suitable size for all your needs.
They allow complex multi-crane installations by considerablyreducing the height gaps and interference of cranes on work sites.
The assembly, erection, transport and even maintenance times are reduced, and as a result this helps to keep operating costs low.
Optimum productivity and greater safety make MDT Topless cranes the best alternative for all users or hirers.

Elegance and distinction
Their new shape is easy to distinguish from a distance.
The counter-jib projects a dynamic and refined design and the profiled jib, with a regular inclination, shows a fluid and
elegant line.

Minimized, compact and light package
Transport and erection
The shapes, dimensions and weights of the components were devised right from the design stage to scale-down the
package and save time. Only a single, small, mobile crane is required to hoist the packages and assemble them.

Assembly of the
counter-jib on the
ground
The compact counter-jib has a reduced footprint, ballast supports and
stabilizer plates designed to be folded
away for transport.
The nose and stabilizer plates can be
simply unfolded which releases the
guardrails.
Assembly of the jib on the ground
Operation of crane fleets can be optimized thanks to the possibility of exchanging certain components of the crane jib with other models from the same range

Counter-jib ballast blocks with inclined bases are used for simpler dismantling on the ground, since they can be laid down easily.
No locking mechanisms are necessary, and the counter-jib can be unfolded easily.

Pinning is quick and simple thanks to the centering pins of the splice.

 Variable frequency hoisting :
• permanent adaptation and optimizationof speed depending on the lifted load,
• very low slow speeds, smooth speed changes,
• high productivity.

 Variable frequency hoisting :
• permanent adaptation and optimizationof speed depending on the lifted load,
• very low slow speeds, smooth speed changes,
• high productivity.

Trolleying with variablefrequency, progressive speed by means of stepless control.

The masts adopt the standard bases from the MC range, allowing it to be adjusted to the desired height.
The adjustable bases are of the same type as those of the MC crane range, providing a choice of method of installation:
• on fixing angles,
• on cross-shaped base,
• on travelling gear,
• or as a climbing crane.
For easier management of your crane fleet, the standard elements taken from the MC range are assembled using pinned fish joints for ease and speed of connection.
|MCT 88|

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the requirements for jack up and plus section of jack up tower crane?
Shall conform to:1, tower crane has not reached the standard free height or attachment, not to the standard suspension height;2. The standard section of tower crane jacking must be the size of the original production;3, tower crane jacking work must be carried out by the professional installation team;4 tower crane jacking up, the wind must be less than four.Answer the 1 floor:The height of the self elevating tower crane is built up by other cranes like building blocks.
Q:About tower crane torque limiter with 4 limit switches, each play a role, thank you
Lifting weight limiter: limit maximum lifting weight;Torque limiter: limit the maximum lifting torque;Height limiter: limits the maximum and minimum position of the hook lifting and lowering;Amplitude limiter: limit the lifting trolley in the boom on the outside, the inside position;Slewing limiter: limit of up to the number of rotating ring arm;
Q:What is the inspection certificate for tower cranes?
Inspection certificate of tower crane must have two certificates:1, the manufacturer issued its own "product quality certificate"2. The product quality supervision and inspection certificate issued by the Technical Supervision Bureau
Q:What parameters are lifting machines called large equipment? 200
General purpose gantry cranes: MG, 440t, MG, 360t, MG, 450t, Me, 360t, ME, 900tGeneral purpose bridge crane: QD, 350t, QD, 400t, QD, 450t, QD, 390t, QD, 330t, QE, 350t, QE, 330tThe above tonnage is now recognized as a large lifting machinery.Hoisting machinery refers to the lifting of heavy objects with hooks or other lifting devices, and mechanical operations such as lifting and moving in space. There are many classifications of cranes, such as cranes, cranes, cranes, cars and so on. They are commonly referred to as one or more kinds of cranes.
Q:How much more than m of tower crane jib winch point height should be equipped with anemometer
According to the regulations of JGJ196-2010 for the safety and safety of installation, use and disassembly of tower cranes for construction purposes:
Q:What are the safety devices in a tower crane?
Answer: 1: height limit2: lifting weight limiter3: torque limiter4: travel limiter5: speed (maximum speed of force must be more than 40m/min)6: put a device (jib tower crane to move) must have7: the rotary limiter (no collector on the revolving part) must have8: car broken rope protection9: anemometer (boom root hinge point height is greater than 50m should be set)10: windproof device (rail type)11: buffer and end stop12: Rail sweeping plate (rail)13: protective cover14: derailment device15: emergency power off switch (red mushroom head)
Q:Tower crane attached concrete pump can be? Are there any state regulations?
Yes, but consider the direction of force. ZOOMLION began production machine.
Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:What are the components of a tower crane? What are its main technical parameters? What is lifting torque?
2 tower cranes (tower crane) referred to as tower cranes, also known as tower cranes, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..Has a good safety device 3, tower crane, such as lifting weight limiter, amplitude limiter, height limiter and load torque limiter limiting device, and travel limit switchestower lights wind instrument, wind clip rail device ladders athletic supporter circlewalkways and railings. The driver's cab is comfortable, easy to operate, with good vision and perfect communication facilities.
Q:Tower crane; command; gesture
8. the hook falls slightly: the arm extends to the side, front and bottom, with the angle of the body about 30 degrees, palm down, with the wrist as the axis, repeatedly swinging downward palm.9. hook horizontal move slightly: small arm toward the side of the natural extension, fingers together, palms outward, in the direction of the load should be running, repeat the slow horizontal movement.10., micro range: double arm bent, extended to one side, five fingers straight, palms relative, and the distance between the load and the distance to move.11. directions of landing: five fingers unbend, point out the position where the load should fall.12. stop: small arm horizontally placed in front of the chest, fingers outstretched, palms down, horizontal swing to the side.13. emergency stop: two small arm level placed in his fingers outstretched, palms downwards, while waving to the level of both sides.14. end of work: stretch your hands and fingers and cross over at the front of your forehead.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range