Shandong Guohong Tower Crane GHD6037-16

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Shandong Guohong is a professional tower crane manufacturer.

Shandong Guohong can manufacture topless crane & luffing crane & topkit crane , the capacity from 40mt to 1000mt tower cranes . we have manufactured these cranes for various client in Korea, Middle east, Malaysia, Pakistan, Australia, Germany(OEM), South Africa and China.

Shandong Guohong prides itself on offering the most products and services around the world.

The leading products are mechanical devices such as various type of tower cranes and construction lifts; as well as road construction like asphalt mixing equipments together with steel building structure installation, etc. With the right to engage in foreign tradewe have passed ISO-9001 Quality Management System Certification,CE Certificate and got National Special Permission Authentication Grade A and Russia EAC certificate of tower crane.

Shandong Guohong Group, originally founded in 1999, is one of the first enterprises that restructured in Weifang City in 1997. The present group company was founded in 2003 and composed of four companies- Guohong Steel Structure, Guohong Door & Window, Guohong Leasing and Guohong Properties. It has 400 staff, fixed assets of about RMB70 million and land area of 90,000m2. Main products include FO/23B, 7030, QTZ125, QTZ80, QTZ63, QTZ40 and QTZ315 series tower crane, construction lifts and material elevator, as well as construction steel structure and high-grade aluminum-plastic doors and windows. Its products are sold in more than 10 provinces and cities in China and over 20 foreign countries.
  Shandong Guohong Group is Top 10 Tower Crane Enterprises of Shandong Province, Top 100 Private Enterprises of Weifang City, Top 20 Enterprises of Guohong City, "AAA" Level Banking Credit Enterprise, Provincial-level Advanced Equipment Management Unit, Provincial-level "Contract Honored and Promise Kept" Unit and Top 100 Provincial-level Honest Enterprises. " Guohong " trademark was rated as Shandong Famous Brand, and Guohong tower crane is honored Shandong Brand-name Product

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:There is no CAD map attached to embedded parts of tower crane?
4810 as long as 16. The middle spacing is different. It's almost impossible to install
Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:How did the tower crane rise on the construction site? Fifteen
In the table below the tower crane is the upper part of the tower body has four jacks, the top of the cage tower (tower of each section is called a tower cage) a little bigger than the following (which can be installed under a small tower, heightening cage) need to jack up above "high rise to work, just a small tower added into the big cage, the cage towers bolted, or tall tower cage can be fixed.
Q:Tower crane demolition safety technical disclosure, how to write?
Baidu search:Tower crane removing and lowering joint safety technical disclosure.
Q:Tower crane 5610 why is it called QTZ63?
Q is reusable, T is tower, Z is jack up, and combined is jack up tower crane. (this is the earliest known China, now the various manufacturers have their own name, some close to the French take, such as F0/23B, the tower jib 50 meters, a maximum weight of 10 tons, 2.3 tons of weight lifting arm tip)80 is the moment, the unit is t * m, (should say is the force multiplied by distance, 800kn.m) for 5613 cranes, the maximum lifting capacity of 8 tons, the boom length is 56 meters, arm tip lifting weight 1.3 tons, maximum weight in the range of 2.5 meters ---13 meters, calculation of 8 * 13=104, so the name is QTZ104, now the provisions should be a QTZ104, but before, people think is 8 tons of weight, so called QTZ80, is now available.
Q:Climbing process of an internal climbing tower crane
There are two kinds of climbing mechanisms: hydraulic and mechanical. The hydraulic climbing mechanism consists of a ladder ladder, a hydraulic cylinder, a climbing beam and a support leg. The climbing ladder is composed of an upper and a lower bearing beams, separated by two stories, which are fixed on the wall or side beam of the cylindrical structure when the work is used, and both sides of the ladder stand are provided with steps. The load bearing beam corresponds to the four main limbs of the crane tower, and is equipped with 8 guide rollers, which plays a guiding role when climbing.
Q:What are the lifting moment requirements for tower cranes?
2 tower cranes (tower crane) referred to as tower cranes, also known as tower cranes, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..Has a good safety device
Q:In the case of tower crane operation, the operation should be stopped
In case of six or more gales, heavy rain, heavy fog, heavy snow or tower crane, you should stop working
Q:What are the climbing claws on the tower crane?
You mean the set section? Used to be rubber, and later found that when the top of the friction is too large, not too good, plus plus the festival, but also always remove the standard section paint, and now basically the pulley
Q:What's the difference between QTZ63 and qtz630, isn't it the same kind of tower crane?
It's the same kind of tower crane, but it's only a unit of rated lifting torque. The former unit is 63 tons. M, the latter is 630 kn m. According to the latest national standard "tower crane", GB/T5031-2008 and QTZ63 are written correctly.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range