Shaft Platform

As operating platform, the shaft platform is mainly used in the concrete pouring of elevator shaft,

equipment shaft, stair shaft of high-rise building and so on.


Characteristics:

◆ The length of shaft beam is adjustable.

◆ Flexible structure makes lifting easier.



Q:What are the quotas for the concrete
(Concrete prefabricated) Prefabricated cover plate Installation of wellbore covers and associated scaffolding templates and even concrete transport, etc.
Q:A lot of housing elevator shaft why have set up before and after the hole, obviously only one elevator front room, behind the structure of the hole to open what he used to do? Or in order to reduce the structural stiffness? Or in order to reduce the load? Seek the design elite to give thanks Thank you
In order to open the door on both sides, especially the cargo ladder. This is usually used to open the door before and after, mainly spare
Q:My family to buy a new house, a total of five floors, my second floor, the first floor with a basement, basement north of a row of garage. Now my house downstairs to buy two adjacent garage, with the basement to get through, in the basement built elevator directly to the first floor. Does this have any effect on my family? Housing quality, firmness, noise and so on! Thank you!
There is no impact, with the specific construction program, the elevator shaft design structure, the specific installation location, elevator selection, late closure noise reduction measures have a great relationship ~ ~ ~ air on the air that has no effect, where to say ah
Q:Check the wellbore height and well height respectively
Manhole: connection (manhole) Sewage sewer and drainage pipes Maintenance workers Check through piping to prevent clogging of the structure. Precipitation and manholes are generally located at the intersection of the station's ground drains, drains, sewers or elevation changes that are prone to siltation, obstructions where it is convenient for dredging and a sedimentation draining well.
Q:Why did the Anping platform mean that the work surface could be mined?
The main drawback of the backward mining is the large amount of the initial project, the construction period is long and the production is slow. Progressive mining is the opposite of reverse mining.
Q:How much is the elevator floor
This is based on the requirements of the elevator manufacturers, generally in the design of the time, the owners have not set the elevator manufacturers, but can have intention, according to the intention of the manufacturers of samples, the appropriate amplification, in the structure before the construction, and then modify the official information Yes.
Q:What is well in the construction project
(20-30 degrees below) called the inclined well, in the civil foundation of the basic engineering, the construction of the coal mine, metal ore, non-metallic mineral industry from the ground down to the mining level of the channel called the well, vertical called the shaft, For the hard soil in the past by the artificial excavation of pouring reinforced concrete is also called wellbore, and now more use of mechanized pile foundation construction, wellbore less.
Q:Concrete is also used, grouting also note, the water does not leak are used, is infiltration
There are two ways to solve. First, in the pit to do a water foundation pit, can put the depth of the submersible pump, water to a certain depth, the water will be automatically out of this approach more practical. Second, the elevator pit plugging program

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords