SET SCREW EMT COUPLING-STEEL,EMT steel couplings

Ref Price:
$0.05 - 2.50 / pc
Loading Port:
Ningbo
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description:
EMT steel couplings are used to connect the ends of two unthreaded EMT conduits together. EMT steel set-screw couplings provide concrete tight connections when taped. Additionally, these set-screw couplings eliminate the need to thread bald conduits to fit old threaded couplings. EMT steel couplings are steel and with zinc-plate surface for excellent corrosion protection in damp location.


EMT Steel Coupling
UL Standard 514B
CSA Standard : C22.2 No.18
NEMA: FB-1
Size: 1/2" to 4"
Set-screw type
Material: Steel / Zinc plated


Applications:

Heavy steel walls
Concretetigh when taped
Pre-set/pre-staked set screws
Three-way combination screws for flat-blade, philips and square head screwdrives 1/2" through 2"
Slotted hexhead screws 2-1/2" through 4"
2-1/2" throught

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Decoration doubt, what kind of wall can not open the horizontal groove?
Power board problem cost 10 less than the general maintenance received you 150
Q:Apple 6 Charging Why always show this cable has not yet been certified
Is the power directly out of the CPU power supply line or on this basis and added the extension line
Q:How to distinguish how many pairs of cable with a large heat shrink tubing
Cable bridge grounding should belong to the protective grounding, grounding resistance at a cross point is not greater than 50 milliohms, no jumper no more than 5 milliohms
Q:How much of the cable with the switch?
The switch is selected according to the current. General switch = (2-2.5) Current three-phase current = P / 1.732 / 0.38 / 0.8 Single-phase current = P / 0.22 / 0.8
Q:7 kilowatts of electricity with what specifications of the wire
1 square millimeters can flow 4A current, 1KW380V, then the current is about P = UI about 2.6A7KW, 380V, then the current is about 18A, each with the line to share 18/3 = 6A2.5 square mm of copper on it. Of the area need to take . probably 6 level. V is probably 7KW220VI = p / u = 7000/220 = 31A. Then need 10 square millimeters of copper.
Q:Is the cable head made of every building?
Building in accordance with the floor or unit configuration distribution box, there are office buildings using a total box. Where there is a cable out of the situation, must be wrapped to make the cable head, according to the choice of distribution box circuit breaker wiring crimp or not crimp the cable terminal. In other words, the cable head must be made, but not necessarily crimp the cable terminal.
Q:The difference between nylon balls and geese and ducks
If the 2.5 square copper wire for the output extension cable, 20 meters distance, the total resistance of about 2 * 1.7 * 0.2 / 2.5 = 0.272 (ohms), the current maximum 1.8A, the voltage drop is 0.272 * 1.8 = ), The charging voltage is 55-0.5 = 54.5 (volts), a difference of about 1% will not have any impact on the battery. However, the third floor, said Ye Hao, you can put the charger put the debris room, from your house put a 220V power cord down, home and then engage in a switch control. It is best to design a light at home, can intuitively see if the electricity is full. That's better. Design light, teach you a way: to find a bad leakless protector, open there is a coil-like ring-shaped stuff, called zero sequence current transformer, it will be down, be careful, do not put Transformers inside the coil hurt, get down, in the transformer two thin lines connected to a light-emitting diode. And then your 220V power cord line of fire from the center of the sensor through, around 3-5 turns. In this way, as long as there is current flow, the light-emitting diode will be bright, when the charge is over, the charging current is close to zero, the light-emitting diode will be extinguished. You can from the light-emitting diode is lit to determine whether the electric has been filled. I also have an electric bike that is so charged.
Q:25 square copper cable how much money one meter?
Copper should be more than 2.7 flat. Aluminum to 4.5 or more.
Q:5 air conditioning can be used 4 square cable
You do not use the 9V power supply, a long time will burn the router.You'd better measure the original adapter voltage, if you want to extend the power cord, it is best to use a thick line of reliable connection, you can not start now, you can not start Depending on whether the extension line is too thin, causing the voltage drop too much.It is necessary to extend the front end of the adapter can extend the 220V power cord.
Q:What is the type of pipe that is marked as KBG pipe?
If no color distinction, 100 meters after you know which line of the fire line which line? The

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range