Semi rigid Aluminum flexible Ducting for HVAC Systems

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Semi rigid Aluminum flexible Ducting for HVAC Systems

Application and benefits

-Applied in air conditioning/ventilation systems

-Tear and puncture resistant

-Corrosion resistant

-High flexibility

-Convenient installation

-No toxic gas emission

Introduction

Flexible Duct is widely used in Heating, Cooling, and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. The product is also covered in a heavy duty, silver jacket for durability. The vapor barrier prevents condensation forming on the outside of ducts carrying air. Because it is flexible, it is easy to run around and through obstacles in the building.


Un-insulated Flexible Duct

Structure: double-layer aluminum foils +1 layer of PET film.


Insulated Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool

Outer jacket: 1 layer of Alu.foil

Glass Wool Density: 16kg/m3; Thickness: 25mm


Insulated Acoustic Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool

Outer jacket: 1 layer of Alu. Foil + 1 layer of PET film

Glass Wool Density: 32kg/m3; Thickness: 25mm


Combined Flexible Duct

Structure: flexible duct PVC jacket.


REMARK: Special structure is available according to customer's requirements



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Air conditioning machine work when the sound is too much reason
Many of the good quality of the model, of course, bear some of the larger. Common scaffolding brackets are U-type care, "construction fastener steel scaffold safety technical regulations" (JGJ130-2011) provides "adjustable support bearing capacity design value should not be less than 40kN, support plate thickness should not be less than 5mm ", the general calculation using 30kN. Not to say how fast buckle steel scaffold can bear the load, but according to how much load to calculate how scaffolding erection. Need to be calculated. In the "construction of fasteners steel scaffold safety technical specifications" provides instructions. Double fastener (anti - skid) bearing capacity design value 3.2KN. Right angle fastener, rotary fastener (anti-skid) bearing capacity design value 8KN.
Q:Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Extruded board of course, can generally use this to do, indoor and outdoor to do almost, most of the outside is done because of saving space inside the room. Recommended: do indoors, because I was doing the external walls, the insulation often do, the wall is not very good for the first time, because you do before the insulation wall itself is the weight of the valve valve closure of the bone shop stall wipes , Benzene board sticky benzene board is not very strong, live well for a few years, bad two or three years there will be signs of shedding, looking twice thinking.
Q:What is the whole heat exchange fresh air ventilator?
(GJG130 - Fan Jutang Duanjie Daojie Juejiao 2001) will be replaced by (GJG130-2011) is expected to begin the implementation of the construction of this year, the construction of fastener steel scaffolding safety technical specifications (GJG130), the construction of fastening steel pipe scaffolding safety technical specifications (GJG130- -2011)
Q:Public building design, the building structure and water is generally designed by the Architectural Design Institute, air conditioning and ventilation is based on the design of the interior? Or first air conditioning ventilation?
Aluminum alloy metal shell better than the plastic shell; we all know that most of the market is now charging the lithium battery, lithium battery is the only drawback is the possibility of a long time with the explosion, so the use of aluminum Alloy shell, much better than steel; polymer battery is good, but the price is expensive,
Q:Space blowing wind is not cold how is it?
Common points are all sandwich panels, with a hard protective layer, the difference is the middle of the different materials, such as polystyrene board, polyurethane board. Polystyrene board which is the most common, because the price is cheap, easy to use so the use of more, but if the temperature is more than the requirements of the chicken inertia glycosylation moxibustion slim faint words, polystyrene board is not satisfied , So there is a polyurethane sandwich panels, polyurethane thermal conductivity of less than 0.. in the existing insulation materials, large quantities of processing, be the best. But because of its process is more complex, and the cost is relatively high, so with less, the common combination of cold storage and the like, I believe that with the economic and technological development, polyurethane sandwich board market share will be more and more High
Q:HVAC Heating: What are the main components of the air distribution system?
The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt
Q:Air to water heater host and air conditioning host is not the same
This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
Q:Ventilation is very good, why still have to install fresh air system
Also known as foam board, EPS board, is containing volatile liquid blowing agent of the polystyrene beads can be preheated by heating, heated in the mold and the formation of white objects
Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
Q:Single cold air conditioning function can not change the cold and warm?
External wall insulation should pay attention to what the details?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range