Self-propelled aerial working platform for high place working-16m

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
100台 /month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

The max. working height of this aerial working platform is 16m.

It can be applied in various conditions for aerial working, such as urban road, suburban road, highway, airport, bridges and culverts and so on.

We start this business from 1998, have many years of design and production experience.For the upper structure, we use HQ600 high strength steel, for some key components, we imported from Europe to assure product high quality.

Our product is durable and easy operation and maintenance, we can supply training for customer in our factory for free. pls find below detail parameters:

Parameters

The main size parameter

Max working height

16m

Max platform floor height

14.3m

Max. working outreach

6.7m

Basket Size

1.8m´0.76m´1.1m

The whole vehicle retracting size

5.46m´1.87m´2m

Axle base

2.04m

The main technical parameter

Load capacity of working basket

227kg

Rotation of working platform

160°

Turret rotation

355°

Turret drifting

0

The max. actuating speedretracting

6.4km/h

The max. actuating speedraising or extending

1.1km/h

Grade ability retracting4x2

30%

Turning radius

Inside

1.9m

Outside

4.3m

Power parameter

Power source

Storage battery

8 sets 4H  6V315AH

Weight parameter

Weight of whole vehicle

6635kg

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the hook crane technique?
Of course, different conditions, tonnage, work conditions but also their own long practice to grasp
Q:How to avoid the occurrence of car cranes dumping accidents?
Wheeled crane operation must be in accordance with the provisions of this law, the first leg, supporting the legs in the prison plaza, keep the machine level, do not allow half-legged or only leg; crawler cranes must be placed on both sides of the track shoe (unless sufficient
Q:How about the commonly used car cranes for the construction of the villa
Higher, that is, the transfer site is not as convenient as the car crane, need to be removed after the transport, to the new site but also in the assembly
Q:Is the crane (a truck crane) a truck?
Article 2 of the Regulations of the People's Republic of China on Road Transport stipulates that "the road transport operations referred to in the preceding paragraph shall include road passenger transport operations (hereinafter referred to as passenger transport operations) and roads
Q:What is the design process for a truck crane?
Modify the three-dimensional model of the overall drawing, drawing three-dimensional map parts, the structural components of the finite element analysis and dynamic simulation.
Q:What is the material process for a truck crane?
In the machining, a large number of less cutting precision castings, especially aluminum alloy castings, processing equipment, a large number of high-precision, efficient machining centers, CNC automatic machine tools, and to ensure quality, but also improve labor productivity,
Q:What are the safety measures for car cranes to eliminate hidden dangers?
In the oil circuit installed in the hydraulic lock or balance valve, it is not necessarily able to fully guarantee the mechanism can be locked after the brake, hydraulic cylinder (hydraulic motor) sealing is also a key factor in restricting the locking effect.
Q:What is the reason for the jitter of the crane boom
Exclusion method: the balance valve disintegration cleaning, dredge damping holes.
Q:What is the difference between a truck crane and a truck crane?
Tonnage truck cranes will be replaced by the performance of advanced, full-featured large tonnage truck crane.
Q:What is the difference between a truck crane and a car crane?
Just before the sub-fine, and now is the same!The Lord is going to be an improvement process to form the two names!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range