Self priming beinei diesel engine sewage waste trash water pump

Ref Price:
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

                            Products Introduction

Product Description

Main datas:

     Capacity( flow rate) :  15 ~ 145 m3/h

     Head  : 2~35 m

     Speed:650 ~ 1950 rpm

     Impeller diameter:247.65 mm

     Pump weight: 260 kg /280  kg

     Power:1 ~ 30 hp

Quotation

Cast iron pump body+ Ductile impeller+ NSK Bearing+Mechanical seal

FOB NINGBO 1400USD/PCS

Advantage :

     Big pump body pass 76.2mmsolid ,high suction head 7.6 m

     Convenient repair and clean (a person ten minutes)

     Removable cover plate ,replaceable wear plate

     OEM ,L/C ,TT ,O/A ,D/P,D/A and so on

     CE ,TUV .ISO


NAME: Self priming beinei diesel engine sewage waste trash water pump  

          Self Priming pump units are available for Solids Handling or Clear Liquid service.

Typical mounting configurations are Engine Driven for Skid or Trailer Mounted packages

and Frame Mounted Electric Driven. Pumps also are available in a variety of different metallurgies.

1) Main Character

1.Beautiful shape and fine structure,reliable performance.

2.With strong capacity of delf priming, no need to equip with flap valve.

3.Non-clog, and with powerful capacity of passing big solid..

4.The hole can make sure that stronger sewage can be cleaned quickly when pump is jammed.

5.The unique lubrication oil mechanical seal cavity makes the performance more reliable.

6.Special check valve structure can make the pump working quickly.

7. When working, the gas and liquid  works together .

8. Low rotary speed,reliable operation,long time usage, easy to maintenance.

9.Advanced pressure protector make pump the pump work safe.

2) Application Area

1. Municipal project,  sewage project, instruction project.

2.Uptown,hospital, hotel sewage transportation.

3.Classification of municipal sewage factory treatment and concentrate system engineering.

4. Factory and contaminated water delivery.

3) Industries Served

♦ Construction

♦ Industrial

♦ Municipal

♦ Agricultural

♦ Mining

♦ Dewatering

♦ Industrial Waste

♦ Sewage

♦ Oil Field

♦ Petrochemical

♦ Paper Mills

♦ Processing

4)Parameter

Self priming beinei diesel engine sewage waste trash water pump

5) Mounting Configuration

Frame Mounted

Base Mounted Electric Driven

Engine Driven SAE Mounted

Engine Driven Skid or Trailer Packages

Horizontal or Vertical V-Belt Driven

Our Services

 Samply available: 7~10days.
Qty: 1pc, only pump head is provided.
Price: US$100~200
OEM is welcome
OEM expierence: more than 10 years.
Countries: Germany, U.S.A, Spain, Italy, United Kingdom etc
Warranty: the whole pump is guaranteed within 1 year, the pump's spare parts are guranteed for 3 months from the date of delivery.
For more information, please do not hesitate to contact me.

FAQ


The information should be including inquiry as following:
1.Pump's flow rate
2.Pump's Head (Pressure)
3.Driven Mode: By electric motor or diesel engine or bare shaft etc
4.Power and rotary speed
5.Suction lift for self priming pump
6.Temperature of liquid if you can provide
Upon the receipt of the pump's parameter, we can send our quotation to you within 24 hours.

Or the condition of pump station would be provided.

♦FAQ:

1.   Q: Can I know more about your products?

       

        A: Pls view our website: www.lanco.cc.

2. Q: What’s your MAQ of this item?

        A: 1~2PCS

3. Q: What is the lead time?

        A: 10~30 days after receiving your payment,depends on pumps.

4. Q: where is your loading port?

        A: Ningbo, China port

5. Q: Are you a manufacturer or trading company

        A: We are a manufacturer specialize in water pump and other pumps more than 20 years.

For more information, please contact me.

Detailed Images

 






Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Metering pumps related matters
1., exports higher than imports, avoid siphonage2. the pump head and the injection valve require vertical installation3., the attached pipe can be tightened by hand, please do not use the tool; the thread does not use the raw meal belt4. the supply voltage is stable and grounded5. installation environment clean, spacious, well ventilated) 1) metering pump suction is not normal
Q:How to install, operate and maintain the pipeline booster pump?
Should be "People's Republic of China network security law" requirements, since June 1, 2017, the use of Internet services to carry out real name authentication account. In order to ensure your Baidu account can be used normally, please check the account number as soon as possible. Thank you for your understanding and support.How to install, operate and maintain the pipeline booster pump?Brother Yao s Gc76 2547 | browseRecommended for 2016-12-01 23:52:54 best answerThe installation of booster pump must be installed horizontally or vertically according to the installation method. The direction of flow shall be consistent with the arrow on the pump body, and installed as far away from the water level as possible. A valve shall be installed on the pump inlet line for ease of use and maintenance. When the impeller is the aspiration level below the pump on the pump shaft end or around the pump should be installed check valve, the outlet is connected with 13 links for water use, at first use to pump should be filled with water, and tighten the screw plug. The pipe connection should be tight, especially the water inlet pipe can not leak, otherwise it will reduce the pump head or not pumping water. The pump cavity is not water, not a long time running, so as not to damage the seal
Q:Attention should be paid to the use of pumps?
To carefully check whether there is a crack impeller, impeller fixed in the bearings are loose, if there are cracks and loose, hungry phenomenon should be promptly repaired, if the pump impeller above the soil should also be cleaned
Q:Double floor sewage pump circuit diagram of a small problem
Question 3 when the water level is low, when the 1KA is connected, the pump will run depending on where your SS selector switch is located. Its left and right position, running pump and standby pump definition is different, left position is 1#, running 2# standby, right position is 2# running, 1# standby. Only inIn case the high level switch 2KA is connected, the standby pump may work at the same time.
Q:What is the function of a submersible pump?Do you have any knowledge about submersible pumps?.
Submersible pumpThe submersible pump is composed of a control cabinet, submersible cables, water pipes, submersible pumps and submersible motors.Submersible pump main application and scope of applicationIncluding mine rescue, construction, drainage, agricultural irrigation and drainage, industrial water recycling, urban and rural residents cited water supply, and even rescue, disaster relief and so on.Classification of submersible pumpsAs far as media is concerned, submersible pumps can be broadly divided into three categories: clean water submersible pumps, sewage submersible pumps, sea water submersible pumps (corrosive).
Q:How to select the fire pump?
Such as a large pressure of about 10m or about 0.1MPa} because the most unfavorable point fire hydrant requires more than 0.07MPa (7m) and 0.5MPa (50m) is not greater than the pressure, so unless the pump is located in the 50m Valley is still lower than the garage, or add to the valve (or the use of fire hydrant decompression) otherwise, it is 120m lift pump
Q:How accurate is the metering pump?
In addition, when the oil supply is too large or the pipeline pressure rises unexpectedly, the volume of the liquid in the hydraulic chamber can be changed, thereby affecting the stability of the flow and reducing the metering accuracy of the pump. In order to solve the problem of how to stabilize the measurement accuracy of metering pump metering pump flow, how stable, the three valve device. The so-called actual refers to the combination of three functions including compensation, discharge and safety protection device or device supporting the hydraulic chamber, according to its action principle is different, is divided into automatic compensation and forced compensation two three valve device.
Q:Why can the centrifugal pump hold down the pressure?
The pump before starting to pump shell and the water pipe filled with water, and then start the motor, the pump shaft to drive the impeller and water do high-speed rotation, centrifugal water movement, was thrown to the outer edge of the impeller, the pressure water pipeline flow through the volute pump into the pump shell.
Q:Why adjust the centrifugal pump outlet valve can adjust the flow?
The centrifugal pump at a fixed speed, the head is fixed, adjust the outlet valve to adjust the diversion area
Q:Why is the sewage pump device coupler?
Advantages of installation and arrangement of sewage pump coupling:1. automatic coupling device, easy installation and maintenance. In the absence of automatic coupling device under the condition of fixed installation, such as pump fault maintenance personnel need to unscrew the screw pump lifting water, repair, or other small pump to pump the water down perfect maintenance, if the water is dirty, it would be difficult for people to go to the next, then the overhaul had great difficulty.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range