Self Climbing HGY24 Concrete Placing Boom
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
HGY24 Floor-fixed self climbing concrete placing boom
| 型号 Model | HGY24 | ||
1 | 布料半径 Radius of placing boom (m) | 24 | ||
2 | 三节液压卷折式 (m)Three hydraulic foldable arms | 一节臂 1st section | 8.905 | |
二节臂 2nd section | 7.945 | |||
三节臂 3rd section | 7.150 | |||
3 | 臂架转角 Boom articulation | 一节臂 1st section | -4.2°~+82.5° | |
二节臂 2nd section | 0°~180° | |||
三节臂 3rd section | 0°~180° | |||
4 | 回转范围 Slewing range (°) | 360 | ||
5 | 整机重量 Weight (kg) | 13300 | ||
6 | 整机高度 Height (m) | 21 | ||
7 | 塔身截面尺寸 Dimension of tower section (mm) | 750 x 750 | ||
8 | 最大吊装部件重量 Weight of the heaviest component ( kg) | 3100 | ||
9 | 最大运输部件尺寸 Dimension of the biggest transport component (mm) | 10200 x 2200 x 1700 | ||
10 | 泵管直径(外径X厚度) Delivery pipe dimension (outside diameter × thickness) (mm ×mm) | Φ133×5 | ||
11 | 砼软管规格 (内径×长度) Delivery hose dimension (inside diameter × length) (″×mm) | 5″×3000 | ||
12 | 操作方式 Mode of operation | 1. cable remote control 2. radio remote control | ||
13 | 电机功率 Power of motor (kW) | 11 | ||
14 | 液压系统压力 Pressure of hydraulic system (MPa) | 20 | ||
15 | 电源 Power | 380V/50Hz | ||
16 | 液压油型号 Type of hydraulic oil | Great wall 68# | ||
17 | 风速 Wind speed | 工作 Placing Concrete | ≤56 km/h | |
爬升 Climbing | ≤28 km/h | |||
18 | 工作温度 working temperature | -20℃~40℃ |
- Q:What do concrete pumps and fabrics mean?
- Pump truck, sub drag pump and automobile pump, drag pump delivery range is relatively large, the pipe can be used in the past (in the case of pumping pressure allowed), the disadvantage is that relatively cumbersome,
- Q:How to maintain the concrete spreader?
- Four screw high precision quantitative cloth is adopted, and the error of cloth quantity is less than 2%. According to the field process, the traveling speed and the cloth speed are stepless flexible adjusted
- Q:what's the difference between the fabric pump and boom pump?
- The spreader is mounted according to the height of the building, and the boom pump can only be used for a lower building
- Q:What are the benefits of concrete handling machines?
- The concrete distributing machine saves 3-5 people and improves the construction efficiency by 2 times
- Q:What is the structure of a concrete distributor?
- The vertical pipe has a rotary joint Gu card. By pulling the manpower, the whole turning part can be turned 360 degrees
- Q:What's the design plan of the concrete spreader?
- Hinge structure on the tape machine design by two light truss, is hinged on the frame of the rotary hopper, through a hinged cylinder between two truss angle adjustment according to needs; in the lower part of the tape machine, design a universal wheel, can move along the axial cylinder in truss drive, adjustable belt tail height
- Q:What are the monthly inspection items of the movable concrete spreader?
- Check whether the rotary limiter works properly and check the coupling of the motor
- Q:What is the working principle of the distributor?
- In order to ensure the safety of the work procedure, prevent the cloth machine from tipping over and pay attention to the stability of the frame of the distributing machine, the construction can be carried out
- Q:What are the acceptance items of concrete spreader?
- The transmission mechanism of the protective cover, etc., each part is firmly connected cloth machine should maintain a certain distance with high voltage and electrical lines, the end of the pouring hose must fasten safety flies, prohibit the use of the length of more than 3 meters water column end hose, hose into the column shall be poured concrete, in strict accordance with the scope of work cloth machine. Work fabric machine under arms are not allowed to stand
- Q:How to install and use the distributor?
- Construction cable must be overhead or buried in the ground, not flat and put. Construction work should be overhead, not line and wire to be flooded or buried by earth and stone. No wires should be tied to steel cage or other iron support at will
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Self Climbing HGY24 Concrete Placing Boom
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords