• Selcom Door Roller System 1
Selcom Door Roller

Selcom Door Roller

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Piece pc
Supply Capability:
10000 Pieces per Week pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Packaging & Delivery of Selcom Door Roller

 

Packaging Details: As you required!

Delivery Detail:Within three days after order confirmed.

 

Specifications of Selcom Door Roller

a.It is used for the elevator door

b.MOQ:1/pc is ok

c.Rs:6202

d.Certification & iso9001

e.Best price and good quility

 

We can provide you all kinds of escalator lock.

YOUR CHOICE:

1.We are able to supply you a large variety of elevator components/ escalator parts of different brands 

  (a selection of more than2,000 kinds).

2.We can guarantee the product high quality, delivery time and good service.

3.We are able to manufacture according to your specific instructions and help you select appropriate product

  and specification for you.

Looking forward to your inquiry! 

 

 

Q:You brother ah, sister who can give me a complete waterproof construction program, the basement roof with polyurethane, kitchen and toilet with JS, thank you friends
Can be downloaded from Google, these two materials approach is very simple and very common.
Q:Our factory production of gears running noise, want to solve through the grinding method, seeking expert guidance. Question added: We used this method, because we buy grinding machine financial capacity is not realistic, and occasionally heard the gear grinding the processing method, they have tried, is to match the two gears to exert a certain pressure on the grinding sand bite A few minutes, after the experiment found to be able to improve some, but now our process is not good to control the angle of the helical gear, seeking expert detailed instructions, or what better way to solve our helical gear noise problem? More
This mainly depends on the gears used in what machinery and the hardness of the gear itself. If the accuracy of the gear itself is 7 or more and grinding is the finishing method, it is necessary to consider the small letter tolerance group, usually base section or tooth profile and other problems, first measure base section, such as base section need to pass through the improvement Tooth surface roughness to noise reduction; if the hobbing for the finishing method, the best plus grinding can be resolved. In addition, the parallelism of the two bearing holes can also cause tooth contact to produce noise.
Q:In the airport shopping mall and other public places up and down the stairs or escalators should rely on what to stand?
Some people say that the right, it was said to the left. A professional escalator engineer will tell you that the middle of the station. why? First, the user long-term left or right, will make the escalator long-term pressure, the side of the parts of the high frequency of damage, shorten the life of the escalator. Second, we rely on the side of the station, leaving the other side, is implied to let others walk from the gap. To know that the escalator is automatic, you use it to ask you to obediently stood. Please take the ordinary stairs to go. Or you go anxious, met someone else, we fell, and on both lose, haste not up to.
Q:My model: hippocampus Fumei to transmission: manual Displacement: 1.6 l Driving range: 2200 km Time of purchase: September 2017 Problem Description: Ask the experts advise on the three generations of the first solution of the United States to the oil 4S there are two kinds of oil, one is mineral Oil 10W-30 The other is semi-synthetic 5W forged teeth forged forging feathers Quan Chuan Huowen these two are SL level. Compare the favorite Castrol's EDGE5W-304 lift. Other do not know. In fact, they also know that economic cars do not need to use a good oil, but still want to own the first car a little better ~ by the way here we winter temperature is generally not lower than minus 25 degrees. Road more urban areas, and occasionally run suburban road. Seek expert advice ~! More
Semi-synthetic 5W-30 to meet your needs, semi-synthetic 5000 a security has been very extravagant
Q:What are the general items of a construction project
Appendix B Construction Division (sub-division) project, sub-project division B.0.1 Construction Division (sub-division) project, sub-project can be divided according to Table B.0.1Appendix B Construction Division (sub-division) project, sub-project division B.0.1 Construction Division (sub-division) project, sub-project can be divided according to Table B.0.1...
Q:For example, what records, is not to monitor what the third party? The More
Anti-dropper to do third-party testing, and report...
Q:This is a question, who can give a full answer
Entrusted to the qualification of the unit or the original manufacturing unit for daily maintenance and maintenance of the number of maintenance and quality supervision of the project; check the care of the waste of the waste of the city, whether to send maintenance personnel on time maintenance personnel, whether or not According to the provisions of the time-by-day maintenance. Requirements elevator maintenance personnel to provide a valid qualification certificate and do a good job of each maintenance
Q:What is chemlon533G material?
Is a kind of nylon material, belonging to the organic material in the polymer material bar
Q:Grocery elevator is always automatically anti-leveling what is the reason
The motherboard set the time to return to the base station, or lock ladder are likely to have this problem
Q:What are the electrical parts of the elevator and what are their roles?
Control cabinet, used for daily operation to control the inverter, drag the system control, running curve, speed, torque, etc. Weighing, provide car weight information, auxiliary frequency converter communication system for car personnel and room calls and remote control and many more. Door system for door control to open the door
Our mission is to provide the BEST elevator and escalator spare parts in the world by dedicating our resources. Sincerely welcome both domestic and foreign friends to join hands with us and create a brilliant future together. You can send us inquiry at any time and we will response promptly to all your requests within 24 hours, offering satisfactory services.

1. Manufacturer Overview

Location Jiangsu,China (Mainland)
Year Established 2006
Annual Output Value US$50 Million - US$100 Million
Main Markets North America; South America; Eastern Europe; Southeast Asia; Africa; Oceania; Mid East; Eastern Asia; Western Europe; Central America; Northern Europe; Southern Europe; South Asia; Domestic Market
Company Certifications ISO Certificate

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Taicang PORT,Shanghhai PORT
Export Percentage 41% - 50%
No.of Employees in Trade Department 6-10 People
Language Spoken: English, Chinese
b)Factory Information  
Factory Size: 5,000-10,000 square meters
No. of Production Lines 3
Contract Manufacturing OEM Service Offered Buyer Label Offered
Product Price Range Low and/or Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products