SEG M5-96 Monocrystalline Solar Module 240W-260W

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
10000 watt
Supply Capability:
1000000 watt/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of  SEG M5-96 Monocrystalline Solar Module 240W-260W Description

● Positive tolerance for mainstream products, 0 ~ +3%. Three bypass diodes
● Tested for 2400Pa load capacity, suitable for heavy snow areas
● Product customized, We offer black modules, special frame modules,
BIPV modules and Special module for low light or cloudy environment
● Anodized aluminium frame to improve corrosion resistance against the weather.
● High transparent, low iron tempered glass to improve module efficiency

 

2. Main Features of the  SEG M5-96 Monocrystalline Solar Module 240W-260W

● 10 years product guarantee
● Power warranties: 10 years>= 90%, 25 years >=80%.
● Punctual and safe delivery, reliable supply to keep project schedule

 

3. SEG M5-96 Monocrystalline Solar Module 240W-260W Images

 

 

4. FAQ of SEG M5-96 Monocrystalline Solar Module 240W-260W

Q1:Can we visit your factory?

A1:Sure,welcome at any time,seeing is believing.

 

Q2:Which payment terms can you accept?

A2:T/T,L/C,Moneygram,Paypal are available for us.

 

Q3:How to guarantee the Quality of the products

A3:We have established the international advanced Quality management systemevery link from raw material to final product we have strict

Quality testWe resolutely put an end to unQualified products flowing into the market. At the same time, we will provide necessary follow-up

 service assurance.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How can I run my house purely off of solar panels?
In my opinion you can do it. You will need to have solar panels. and batteries to store the power until needed.
Q:thermodynamic question that includes heating water with solar panels?
Here's a typical 4' x 8' collector rating. 40 degree latitude would be a cool climate, so you look at row D, water heating in a cool climate. Probably take the middle rating, mildly sunny day, and it is 0,000BTU per panel per day (it's 9,000 on a sunny day). 38,700 BTU / 0,000 BTU = 3.87, they'd need about 3 to 4 panels. If you used the sunny day number, you'd only need 2, but 3 is more realistic, as it is not always a sunny day.
Q:where could i buy a cheap and low cost solar panel regulator?
Solar cells shouldn't need a voltage regulator for simple projects like driving motors or powering CMOS electronic circuits. I would need to know a little more on your goals for the project to help. However, I will put a few links that may be helpful to solar cells and some voltage regulators. The first link is general solar cell info and includes manufacturer lists at the end. The second is a link to educational solar cell kits and cells that may be useful for you. The last one is Digi-Key which is good for finding components to make your own voltage regulator. Hope this helps with your project!!
Q:Home solar electricity advice? Making the solar panels accessible?
Modern solar electric panels rarely fail. Because of this, if you would be installing them over a roof that only has a few years left on it, it would be better to redo the roof, first. In the unlikely event that a panel needs to be changed, this can be done in 30 minutes or so, because the panels are mounted on racks, with everything simply plugging together. I have never personally seen a solar installation go bad, but from what I hear, the inverter (a box that goes in next to your electric service panel) is usually what burns out after 5 years, assuming the install was done right in the first place. If you were to call roofers to repair your roof, they would somehow be able to get to your roof, by ladders, or a special truck. Solar installers use the same kind of equipment. They won't have a problem getting up there. A solar electric system is actually a very straightforward thing. No matter who installs it, if there is a problem, another installer should be able to diagnose and fix it.
Q:What makes solar panels Inneficient?
figure it out for us
Q:You place four identical solar panels in 4 places.?
Best to worst: far side of the moon, near side of the moon (same as far side, except for lunar eclipses), Sahara desert (not at 0 latitude, and occasional bad weather), New England (less favorable latitude, and LOTS of bad weather).
Q:What are your opinions on solar energy?
I have had my system for almost a year and love it. I got a 3.74 kwh/dc system, my highest electric bill was $35 in the dead of winter and last month was $6.. I paid $6K for the system and was told I would break even in my 6th year, that was factoring in a 5% annual rate increase. In my area the last few rate increased have been well over 5% and they are talking up to 2% next year. Just keep in mind the amount of energy you use will determine how large of a system will work best for you. My system is tied to the grid, so I don't need a storage system. My utility has net metering, so I sell them my excess during the day and buy back what I need at night.
Q:Are solar panels worth it?
I'm okorder.com/
Q:Where to get solar panels in Birmingham, AL?
Any electrical contractor could likely install them, and there are several Internet businesses that sell solar panels. You likely have no place there to get the kind of large panels you need for a house. Look at your local regulations. Your utility may not allow grid-tie, so you may have to set up an off-grid system with batteries and use separate wiring or a transfer switch. One thing a lot of people neglect is hail protection. In Birmingham, you're likely to have large hail (larger than golf ball size) every couple of years in the spring. You need to work out a way of covering them in advance of severe weather. Most panels will take up to golf-ball size hail with no problem. DK PS, I've done this myself, and have considerably more information. Email if you're interested.
Q:would a lazier work on a solar panel?
Build okorder.com/

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range