School Student Desk and Chair 2015 Hot Sale DY-30015

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
100 set
Supply Capability:
30000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

School Student Desk and Chair  2015 Hot Sale DY-30015

 

1.  Structure of School Student Desk and Chair  2015 Hot Sale DY-30015

 

 

 

School Student Desk and Chair  2015 Hot Sale DY-30015, made of high quality steel and plywood or MDF,  fire-proof finish and clear painting for the wooden part, powder coating for metal frame, Strong and durable, easy to assemble.

 

2.  Main Features of School Student Desk and Chair  2015 Hot Sale DY-30015

      . With certifications of ISO 9001 and ISO 14001.

      .The rebound have a perfect mute and oxidation-resistant function.

      .The iron parts welding is treatment by carbon dioxide protection,

      .The steel pipe surface have been deal with oil removal, rust removal,

        phosphating, electrostatic spraying, high temperature curing.

 

 3.   School Student Desk and Chair  2015 Hot Sale DY-30015 Images

 

      

 

 4.  School Student Desk and Chair  2015 Hot Sale DY-30015 Specifications

 

      

Specification

Table 60*40*76cm   chair: 37*42*78cm

Desk top

600*400mm 16mm melamine coated plywood or MDF

Chair top

400*400mm 8~10mm fireproof bentwood

Post legs

Material: 1.2~1.5mm thick steel plate

Storage tray

0.8mm steel plate,with clapboard in the middle and pothook on both lateral sides

Welding

Argon arc welding,smooth and neat

Foot tube

Square tube 25*50*1.2mm

Screw

Steel galvanized

All metal part

Rustproof powder coating

 

 

 5.  FAQ of School Student Desk and Chair  2015 Hot Sale DY-30015

 

(1) What's MOQ?

 

Normally 1*20GP, depends on specific requirements.

 

(2)How to guarantee the quality of the products?

 

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

 

(3)How long can we receive the product after purchase?

 

In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 30 working days can be served.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range