Schoner Brand Topless Tower Crane SLP6016

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

KIND REMINDER:
WE ALSO MANUFACTURE OTHER TYPES OF MASTSECTION AND OTHER TOWER CRANE
SPARE PARTS, SUCH AS LIFTING JIB, TIE-IN
COLLAR, CLIMBING CAGE AND HOOK.  
WE WISH TO PRODUCE MOST-SATISFIED PRODUCTS FOR YOU!

PLEASE FREELY CONTACT US FOR INQUIRY!


Specification of  SLP6016


Jib Length: 60m

Tip load:1.6ton

Max Load:8ton

Free standing height:  45m (1.6X1.6X3m mast section)

Hoisting Mechanism: 30LVF20

Trolleying:BX3365X

Slewing: RCV95

Container loading for free standing height:6X40HQ




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:[tower crane] and [tower crane] what is the difference between, how to distinguish?
[tower crane] is a professional term, [tower crane] is a saying or abbreviation, also called "tower crane".
Q:What are the types of tower cranes?
The tower crane is divided into: fixed tower crane mobile tower crane self lifting tower crane mobile tower crane is divided into: rail type tire type automobile type self lifting tower crane is divided into: attachment type climbing uses: concrete with cage for loading and unloading installation general building mixed
Q:When building tall buildings, where is the bottom of the tower crane installed?
A firm foundation is built before the tower crane is used, and then the crane is fixed to the foundation
Q:Climbing process of an internal climbing tower crane
Climbing tower crane, usually installed in the elevator shaft building or ad hoc Bay, also can be installed in the cylinder structure, by means of a climbing mechanism increases with the structure increases, generally every building 3~8m, crane climbing a tower, its height is only 20m left and right, lifting height with construction height and.
Q:When the tower crane is installed in the fertilizer tank,
Pouring foundation does not increase the foundation safety first
Q:How many motors does the ZOOMLION TC6013A-6 tower crane use?
Model: YZRDW225M-4/8 power: 24/24KW speed: 1420/725r/minDirect search {ZOOMLION QTZ80 (tc6013) _ crane Manual Part 1 (Part Two)}, can also be found.
Q:What is the calibration value of a tower crane?
Do you mean the calibration value of crane lifting moment? That should be the product of the maximum magnitude of the tower crane and the corresponding maximum lifting load.
Q:QTZ63 (Q5610) tower crane power, how many power parts, name, model specification, product number, date of appearance
What is the total power of tower cranes of type 63 and 40?
Q:Are there any special requirements for the installation of wall fittings of tower cranes?
The angle of the two member of the wall shall not be less than 60 degrees and shall not exceed 90 degrees;
Q:What are the lifting moment requirements for tower cranes?
3, tower crane, such as lifting weight limiter, amplitude limiter, height limiter and load torque limiter limiting device, and travel limit switchestower lights wind instrument, wind clip rail device ladders athletic supporter circlewalkways and railings. The driver's cab is comfortable, easy to operate, with good vision and perfect communication facilities.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range