• Scalffolding Pressed Inner Joint  Pin System 1
  • Scalffolding Pressed Inner Joint  Pin System 2
Scalffolding Pressed Inner Joint  Pin

Scalffolding Pressed Inner Joint Pin

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
Jiangsu China (Mainland)


Model Number:
SEJ-1012
Type:
Scaffolding Parts
Scaffolding Part Type:
Scaffolding Couplers
Material:
Q235
Surface Treatment:
Zinc plated
Size:
48.3mm X 48.3mm
Weight:
0.8kg
Standard:
EN74-1, BS1139

Packaging & Delivery

Packaging Detail:bags then on steel pallets
Delivery Detail:20-45 days or as request

Specifications

Pressed Inner Joint Pin
1. BS1139/EN74 -1.
2. Clear marking.
3. Perfect surface.
4. Timely delivery.

1. Description of Pressed Inner Joint  Pin

Material

Q235/Q345/etc

Dimensions

48.3*48.3 or as your demands

Surface

Hot-dip galvanization/ electro galvanization /painted /or as your request

Standard

EN74-1,BS1139,

Fastener Grade

class8.8

Weight  

08kg/ as your requirement  

Feature

1.Good bearing capacity  2.Durable & stable
3.Easy to assemble & dismantle

MOQ

2000pieces

Package

bags with steel pallets, or as your request

Payment Terms

TT, L/C, or as our agreement.

Delivery Time

According to order quantity.


Q:How to calculate the vertical force of scaffolding
The calculation of steel tubular scaffold with reference to "construction safety code for steel tubular scaffold with couplers" (JGJ130-2001). Need to calculate the following eight aspects:
Q:How to calculate the double wall scaffolding
The adjustment coefficient of the bearing capacity of the foundation: KC = 0.400;The average pressure of the bottom of the vertical rod foundation, P = N/A =84.900 kN/m2;Among them, the superstructure to the top surface of the axial force design value: N = 7.641 kN;Basal area (M2):A = 0.090 m2.P=84.900 = fg=200.000 kN/m2. Calculation of bearing capacity of foundation!
Q:A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:What is a bowl buckle scaffold?
The buckle type multifunctional scaffold is a new type scaffold which is developed on the basis of absorbing the advanced joint and fittings of the same type of scaffold in foreign countries and combining with the actual situation of our country.
Q:What's the film where gene Kelly dances on scaffolding? And at a gym?
I think it's Living in a Big Way.... I could be wrong...
Q:Construction scaffolding right angle fastener, rotary fastener, butt fastener weight? There are more than one meter steel pipe?Thank you!!!
High efficiency of the installation and removal of only bare handed, greatly improve the efficiency of mobile scaffolding assembly and disassembly than the steel pipe frame 1/2 fast time, faster than bamboo scaffolding 2/3 time. Safe and reliable 1 overall performance is good: equipped with a foot board, parallel frame, buckle wall tube, horizontal and cross bar...
Q:Write a scaffold method for 743,425 divided by 365EASY 10 points
use a calculator you punk, nobody writes out division anymore, grab your ti-84 and type it out... there's your scaffold method jerk.
Q:Exterior wall scaffold construction plan?
Big bar:The large cross bar is arranged above the cross bar, and the inner side of the vertical rod is fastened with a right angle fastener and a vertical rod, and the length of the utility model is not less than 6m of the span of the 3m. The large cross bar is connected with a butt fastener, and the joint is arranged in a staggered way, not in the same time and in the same distance. The horizontal distance of adjacent joints shall not be less than 50cm. The distance from the joint to the riser is not more than 50cm
Q:When putting up old scaffolding, a mistake was made and it had to come down.Long story short, the connectors between the vertical and horizontal poles (which were hammered in) are stuck.Any ideas for getting them out?Thanks.
Heat the female connection with a torch. The outer connection will expand from the heat. Heat the connection hot enough not to touch but not cherry red. Put a pipe wrench on male side of tubing where its is cool and tap wrench with a hammer and it will come apart. If possible lay the scaffold on its size for better leverage.
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords