scafolding shoring props/multidirectional scaffolding clamp

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1)material: Q235
2) size:48.3mm
3) weight: 1.00kg
4)surface treatment : electro-galvanized

5)standard:en74/bs1139/ISO9001:2000

6)OEM service is available

 

scafolding shoring props/multidirectional scaffolding clamp

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Please help me in building professional people (scaffolding)
Please know a good personLearn slowlyWell then consider whether or not to kick offMore types of scaffolding
Q:In the Scarlet Letter, how does the scaffold scene free Dimmesdale, Hester and Pearl?
Tell me what you know and I will elaborate. I had to read this book for a class and hated it, but I won't do your homework for you. I will help if you show you read it yourself and put in some effort we can see
Q:Can I get an industrial/scaffold piercing pierced with 2 separate bars?
nope! Cartilage piercings take about a year to fully heal up. Yes, you can get 2 separate bars, but let the piercer know thats what you want. Industrials are VERY hard to take care of. Make sure to listen to EVERYTHING the piercer says!
Q:Method for inspection of foot hand frame fittings
Or "low pressure fluid delivery welded steel pipe" GBT 3092
Q:What is the difference between Scaffolding and Zone of Proximal Development?
Taken from okorder: Vygotsky believed that when a student is at the zone of proximal development for a particular task, providing the appropriate assistance (scaffolding) will give the student enough of a boost to achieve the task. Once the student, with the benefit of scaffolding, masters the task, the scaffolding can then be removed and the student will then be able to complete the task again on his own.
Q:How much is the amount of material used to build a square meter double row scaffold? Urgent!
The following is a quote fragment: who knows how to use a square meter of the main raw material of double row scaffolding
Q:I have a contract to paint a six story hotel. Problem the roof has an aluminum skirt. Can scaffolding be used?
Scaffolding and Cherry picker is your best option.
Q:Latch type disc scaffolding accessories are national patent products?
Also called chrysanthemum disc scaffolding, scaffold system, disc scaffolding system, buckle disc scaffolding, layher frame (layer frame, Lei Ya frame, because the basic principle of the scaffold is by the German LAYHER (Lei Ya)'s invention, the industry has been called the "thunder sub frame"
Q:The basic form of external scaffolding
The limit pin of the upper bowl buckle and the upper bowl buckle is arranged on the steel pipe upright rod according to the 60cm distance, wherein the lower bowl buckle and the limit pin are directly welded on the vertical rod. When the utility model is assembled, the notch of the upper bowl buckle is aligned with the limiting pin, the cross rod joint is inserted into the lower bowl buckle, and the upper bowl buckle is pressed and rotated. Bowl buckle joints can be connected at the same time 4 bars, can be perpendicular to each other or deflect a certain angle.
Q:Specification and type of scaffold erection
Specification for scaffold erection(a) basic requirements1 important scaffolding must develop a construction plan, if necessary, to develop safety assurance measures. 2 more than 25m high scaffolding must adopt the fastener type steel tube scaffold, the single pole scaffolding height should be controlled within 50m; height of more than 50m of the scaffolding should be effective measures by a double pole, wire rope, cable stayed unloading segment, and additional design.3 the design of the scaffold shall meet the requirements of the project and shall indicate its use, maximum static load, maximum dynamic load andThe selected design parameters and structural parts shall not be lower than the existing national and industry related safety technical standards.4 scaffolding in the construction of the need to change the original structure, Gago (wide), to its use, etc., must be verified by the technical department, and the approval.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range