Scaffolding u-head jack accessories
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
scaffolding u-head jack: | color: | surface treatment: | |||
size:: | working height:: | Payment terms:: | |||
Package:: |
Packaging & Delivery
Packaging Detail: | wood cage or as your as your request scaffolding u-head jack |
Delivery Detail: | one month after the deposit scaffolding u-head jack |
Specifications
scaffolding u-head jack
Professional quality
Perfect after-service
Reasonable price
scaffolding u-head jack
Features
Folding scaffolding, easy to take and Store.
All aluminum structure, with characteristics of more steady and lighter weight for easy handing.
Fitted with castors, easy to move.
Take European advanced design concept, to give priority to product safety performance.
Prompt technical supports and all-round customer services.
Meanwhile, we can provide all necessary accessories, to achieve one stop shopping.
Total steps | 5 | 6 | 7 | 8 |
Extention length | 253cm | 273cm | 307cm | 361cm |
A Height | 160cm | 160cm | 185cm | 211.5cm |
Open Size (cm) | 160x40x167.5 | 160x40x167.5 | 160x40x194.5 | 160x40x221.5 |
Platform Size(cm) | 147x40x1.2 | 147x40x1.2 | 147x40x1.2 | 147x40x1.2 |
Step Height | 27cm | 27cm | 27cm | 27cm |
Thickness of aluminum | 1.2mm | 1.2mm | 1.2mm | 1.2mm |
Packing Size(cm) | 167X41.6X15 | 167x41.6x15 | 194X41.6X15 | 221x41.6x15 |
N.W. | 15.5kgs | 15.7kgs | 16.4kgs | 17.1kgs |
Max load | 150kg | 150kg | 150kg | 150kg |
- Q:Im hoping to get an industrial/scaffold piercing done at the very beginning of the summer holidays.Is it possible that they can be pierced with 2 separate pieces of jewellery rather than one bar.Also would it be healed in time to take it out once the holidays are over (6 weeks)??Please help??!?Thanks x
- Yep, some piercers prefer to do it that way. Just make sure you let them know that that's what you want when you go into the shop and they can accommodate you. No cartilage piercing is healed enough to remove in 6 weeks. Cartilage piercings can take anywhere from 6-12 MONTHS to fully heal.
- Q:I really want to get one done and I would like it if someone could tell me how badly does it really hurt? During and after. I know everybody has different pain thresholds but on average? I'm just nervous to get it done but really want another piercing on my ears. I have my lobes and a cartilage on my right ear. How easy is it to clean? rate in numbers as well as a description. Thanks.
- well when i got mine it really didn't hurt tht muchh the second hole hurt the most but only because i was thinking about it. andd it hurts more afterwards especially during the first few dayss if you hit it by accidentt. and cleaning it honestly is a pain, its annoyinggg but you have to do it, during the first few weeks clean it 3 times daily then you can start going down to two times daily. and do sea salt soaks and stufff anddd the actual piercing for me was about a 4 or a 5 (10 being painfulest) and the healing has been about a 5 or a 6 but i just got it done last weeek, if you really want it then get it,the pain is only temporaryy buttt its deff worth it in the end :)
- Q:The role of the external scaffolding and the relevant provisions?
- These two functions are often concurrent. With the protection of the role of security, in order to play the role of height operation; can not guarantee the safety of the role, the construction personnel can not operate on the above. These two functions, the protection of human safety is the first. Construction workers in the scaffolding on the construction work, there is a sense of security, construction progress, the quality of the project is sufficient protection, in order to create good economic benefits. Otherwise, once the danger of scaffolding, will cause many casualties, causing significant losses. Therefore, in the development of scaffolding support programs and scaffolding erection, we must firmly grasp the quality.
- Q:Cantilever scaffold technical disclosure
- The surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scarring, delamination, dislocation, hard bending, burrs, indentation and deep drawing.
- Q:What are the dangers of scaffolding
- (5) the improper operation of the accident collision accident, etc.)Analysis of the main reasons two accidents:1) whole frame dumping, vertical collapse or local collapse frameStructural defects: the structure of the lack of the necessary structural members, not in accordance with the provisions of the number and requirements of the erection of the wall, etc.;In the process of using the arbitrary demolition essential bars and even wall pieces etc.;
- Q:What are the general specifications of bowl buckle scaffold?
- Different specifications of the bowl buckle scaffolding accessories in the use of steel pipe materials and fasteners are different, the price is naturally the larger the price will be more expensive. What are the advantages of bowl-scaffold: Processing 1, scaffolding is very simple, the most commonly used 48 steel pipe, welding on the bowl, fastener scaffold steel pipe improvement can even use the traditional.
- Q:How does the second scaffold scene morally change Hester Prynne?
- concentration your activity on who's on the scaffold, how they react to the customary public shaming, and what the reader learns with connection with the character from analyzing the define of them on the scaffold.
- Q:so yeah as it says above^should i just wait till it no longer hurts, or do you have to wait a certain amount of time...
- well it depends because some bars are thicker than others, if your changing to a bar as thick as the one you have now then i say about a month is good but if its the slightest bit thicker i suggest you wait maybe 2 months and in the mean time make sure your turning it and wiggling it so after the 2 months go by you can change it to a thicker bar without it hurting
- Q:Rather than buy tensile steel rods to reinforce concrete I wonder whether I can effectively recycle scaffold tubes that are presently on my roof.
- You can, but I can think of two reasons why it might be unwise. Firstly, reinforcing bars are ribbed to provide a key between the concrete and the steel, whereas scaffolding bars are much smoother. This leads me to believe that scaffolding bars, weight for weight, wouldn't be as effective as reinforcement bars and you wouldn't have as much reinforcing action as you think. In extremis, you could end up with an under-reinforced concrete beam which will be brittle - reinforced concrete is usually deliberately slightly over-reinforced so that the behaviour close to failure is ductile, as it gives you time to run away. Secondly, scaffolding bars are hollow and reinforcement bars are solid. In reinforced concrete, the alkalinity of the cement paste helps to protect the reinforcement from corrosion - the reason for specifying a minimum cover - but the inside of your scaffolding bars would not benefit from this and so I'd worry about the risk of shortened life due to rusting from the inner face. At least when reinforcement bars rust they tends to spall the concrete cover off, which you see happening.
- Q:What are the functions and requirements of the masonry wall
- 4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Scaffolding u-head jack accessories
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords