Scaffolding Tower System aluminum

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Guangdong China (Mainland)


Model Number:
st-1016
product name:
aluminum construction platform lift tower mobile scaffolding
material:
aluminum
colour:
silver,etc.
size:
L2M*W1.35M,L1.5*W1.8M,etc.
height:
customize
application:
workbeach platform
advantage:
quick delivery
MOQ:
2sets
certification:
TUV ISO9001:2008,SGS
warranty:
1year

Packaging & Delivery

Packaging Detail:carton,air bubble film,according to your request
Delivery Detail:10 days after 30% deposit

Specifications

scaffolding
1.material:aluminum
2.unit size:L2*W1.35*H2m,etc
3.Height:customized
4.ISO,TUV, SGS

aluminum construction platform lift tower mobile scaffolding details:

  1. Material: Aluminum alloy 6061-T6

  2. Scaffolding Specification: Size:(L*W*H) :The height is between the floor and  workbench platform,not the total height.

  3. L1.5m * W0.7m *H4m         L1.8m *W0.7m * H6m
  4. L2.4m * W1.2m * H3m        L 2.4m *W1.2m *H6m
  5. Height:customized.

  6. Main tube: (diameter*thickness)50*3mm

  7. The safe guard frame height: 1.2M

  8. Each transom center distance:500mm

  9. Pedal Max loading:225kgs/2pcs

  10. Stabilizer Length:1.8m/3m

  11. Technique:welding

  12. Feature: Integral ladder increased user’s safety. Ribbed frame horizontals are non-slip. All the frame scaffolding parts are connected with carbon dioxide arc welding to reduce cracking or deformation

  13. Application: For high-rise construction work both inside and outside, be installed simply and safety



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the five accidents in the construction industry?
The top is definitely to hang, with the top of the space to stay between one meter is the best, in the ceiling of the time, such as with a buckle plate, in the buckle inside plus a layer of rock wool, 3-5 cm thick, Remember to install the time as far as possible not to flatten the cotton, will affect the effect. Brick wall outside or inside, do insulation layer, if the money, but also with rock wool or foam board and the like, if the foam board, the thickness of not less than 6 cm, 10 cm best. Glass surface, this does not spend money is to die, do not spend on the outside hanging sun curtain, cloth and the like, if you want to see, to brush transparent insulation coating, but the price is high.
Q:I am in urgent need of emergency contingency plans
What are the sub-items of the general project that should be prepared for the special safety program? What should be included in the special programming? The best risk of the preparation of the following: the following dangerous part of the sub-projects and temporary electricity equipment in 5 and above or the total capacity of equipment in the 50kW and above the construction site of temporary electricity construction, the construction unit should prepare a special program The Excavation works of earth and rock
Q:What kind of special jobs are available at the construction site?
62-1 meet the requirements 2 trench may not be backfill with water, backfill should be dense Section 4
Q:How far should the tower crane be from the outer wall?
1: it is best not to use this, this program in the construction, curing, use, life will bring a lot of problems. 2: hanging net and plaster is formalism, is not considered the consequences. 3: If you want to use tiles to decorate the wall, especially the sandwich panels, the size of the use of small. I have seen a tile wholesale owner home decoration, the 800X800 cut into 800X200 with, it seems good results.
Q:Construction safety inspection score summary of the supervision unit, construction unit inspection opinions how to fill?
Safety crates, safety nets, protective gloves, protective masks, protective goggles; tower cranes, construction lifts, construction hoists, ,
Q:Construction of the project more than the number of layers must be used construction elevator
The outer scaffolding is a scaffolding that is erected outside the façade
Q:In the project settlement of continuous rainfall led to the cost of the construction team can be like the construction side to withdraw claims
Steel pipe scaffold and sub-button type, bowl button type, socket type, etc
Q:High price seeking truth! ... capacitive BCD-232M refrigerator price ... who answered, I asked him to breathe oxygen ...!
Housing construction refers to the construction of housing and other buildings in the construction of infrastructure, including residential buildings, industrial plants, commercial buildings, office buildings and other special housing The external wall insulation is made of polymer mortar, fiberglass mesh, flame retardant molded polystyrene powder, and other materials such as EPS foam or extruded plate (XPS) Into, on-site bonding construction The new insulation decorative board is produced through the assembly line, set insulation, waterproof, finishes and other functions in one, is to meet the current housing building energy needs, improve the industrial and civil building exterior wall insulation level of the preferred material, but also on the existing building energy Transformation of the preferred material
Q:Hello, can you send me an electronic version of the current building code? Thank you, email lyslzsuiyandong@163.com
A project floor-style double row scaffolding more than 30 meters, does not meet the specifications,
Q:How to calculate the vertical shipping cost of decoration
Extruded polystyrene insulation board according to the design requirements to take the thickness

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range