Scaffolding System-Steel Plank Board CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: FAS-SP

  • Type: Scaffolding Parts, "U" type

  • Scaffolding Part Type: Scaffolding Planks

  • Material: Steel

  • Surface: Galvanized

  • Certification: CE

  • Loading Capacity: 500kg

Scaffolding System-Steel Plank Board CNBM

Packaging & Delivery

Packaging Details:pallet

2.Product Description

Model No: FAS-SP

Model Name: Scaffolding System-Steel Plank Board

 

3.Features:
1) Dimensions (Lx W ): 730x 320mm, 1090x320mm, 1400x320mm,
1570x320mm, 2070x320mm, 2570x320mm, 3070x320mm,
4140x320mm
2) Made of steel channel and 2mm thickness steel plate
3) Weight: 6.0/8.4/10.6/11.6/15.0/18.2/21.5/29.8kg
4) Used in facade scaffold systems
5) Surface: paint, cold dipped galvanized or according to customer's requirements

 4.

Ring   Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
In order to prevent the occurrence of production safety accidents at the construction site, improve the emergency working mechanism, in the event of the accident occurred in the project, the rapid and orderly emergency rescue work to carry out the accident, rescue the rescue project, the construction of the project site safety accident emergency plan The wounded, reduce the loss of the accident, the development of this plan
Q:How to do a good job in typhoon prevention work in rural areas?
Listen to weather forecasts, reinforce Dapeng and other infrastructure, to prevent lightning, to quickly cut off all kinds of electrical power
Q:Seeking the Responsibility System of Safety Responsibility of Each Function Department
The responsibility system, policies, laws and regulations for the safe production of the production safety departments, and the actual development of the company's safety production, civilized construction and environmental management in line with the actual implementation of the company's safety production responsibility system
Q:How to carry out fire inspection at construction site construction site (including information and site)
How to carry out fire inspection at construction site construction site (including information and site)
Q:a scaffold that weighs 300n supports two painters. one of the painters weighs 250n and the other weighs 300n.?
Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
Q:what do you call a place of great significance? such as the scaffold in the Scarlet Letter?
Historical a place with alot of history attached to it Landmarks
Q:What is the exterior scaffolding erection specification? What do you need to pay attention to?
That it is what to do with it, for home improvement, then, in the end how much help? Need to pay attention to a few points:
Q:At the scaffold, Dimmesdale sees 3 people before Hester and Pearl. Who are they, what do they represent?Help!?
First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne
Q:Construction technology measures fee is directly into the sub - project costs
Division of project costs only include human labor costs, materials, machinery, business management fees and profits
Q:What rights do I have as a tenant in regards to the scaffolding outside my window?
explain to your land lord the problems you are facing because of the old windows. i hope he understands you otherwise vacate the house and search for a new one. some companies also insurance for renters.go for it. i hope my answer helps you. all the best!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range