Scaffolding system-Door Frame Scaffolding

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
10000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Painted H Frame Scaffolding Size Hight quality


1.Description 

As a high quality range of Scaffolding Frames-Standard H Frame is being offered to the clients in different specifications. These products have rigid welded frame of horizontal and vertical pipes. These pipes are interconnected by scissor type cross bracings by the help of pins and spring clips.

  

2. Main Features of Frame Scaffolding

1) light duty, easy to erect and walk through, wide appciations for both inside and outside constructions.

2) A complete set of  frame system scaffolding  usually include 2 pcs of H frames ,2 pairs of cross braces and 4 pcs of joint pins.

3) for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.

4) a type of mobile scaffolding that you can install caster wheels at the bottom of frame scaffold ,then frame scaffolding is moveable.

5) can be used for the building decoration which is the light duty scaffolding, it is more easier for moving.

6) dip painted which means that the inside of the frame scaffolding can be painted to against anti-rustiness


3.Product pictures: 


Scaffolding system-Door Frame Scaffolding

Scaffolding system-Door Frame Scaffolding

 

 

 4.   Packaging & Delivery

Packaging Detail:

Frame system scaffolding package in the container, or according to your requested

Delivery Detail:


10-15 days after deposit received.


5.FAQ

 We have organized several common questions for our clients,may help you sincerely:

 Can we provide different size of Frame system Scaffolding as customer need ?

The answer is Yes, customer can provide the Tec spec to us and Drawing for production.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Scaffold Piercing Aftercare?
I've had my industrial for over two years, it's a great piercing but aftercare is important and it does take awhile for it to heal. Here was my schedule for my industrial and all of my piercings since then... When I got my industrial I was in school until about 4 pm as well (I'm no longer in school now so I do it a little differently now) so this schedule might be doable for you. I took showers in the morning but that's not a huge problem. I'd wake up in the morning and while showering I'd clean my piercing with antibacterial soap AFTER I washed my hair and did my other shower rituals. Then when I got out of the shower I would do a short sea salt soaks (sea salt soaks are going to be much better for your piercing than H2O). I'd mix non-iodized sea salt in a clean new dixie cup with warm water, then I'd bend over and let my ear soak in the water for about five minutes. Sea salt soaks are great because they help promote healing and prevent/clean up infections. Then I'd go to school and after school I'd do a simple little rinse with a saline solution (which you can buy at any grocery store, usually around the contact supplies). Saline is good for when you're in a rush and don't have time to do a sea salt soak. Then at night I'd do a long sea salt soak and I'd soak my ear for about 10-15 minutes. Now for you, since you shower at night I would clean my ear with antibacterial soap every night in the shower and do a long sea salt soak after my shower, before bed. Then in the morning I'd so a short little sea salt soak before school and after school you can use a saline solution or the H2O. Good luck! This worked for me with all 6 of my piercings.
Q:How can I cover my industrial/scaffold piercing when I'm playing sports? sports?
Well an industrial piercing isn't exactly going to get in your way, just put your hair up in a pony tail so your hair doesn't get snagged on it. I wouldn't suggest trying to cover it with anything though, you'll be putting the piercing at risk of infection from trapping bacteria, especially if you're going to end up sweating.
Q:Is it possible to use Boston Ivy as scaffolding for wisteria so one climbs up the other?
The wisteria will climb on anything and everything it can get it's tendrils on. But are you sure you want it on your ivy? Wisteria is the most aggressive grower,and will overtake the ivy, choking it out. As a matter of fact it's not the kind of plant to have close to your house. I know,the blooms are pretty and all but the rest of the plant is a holy terror on your siding,shingles,etc. If you still want to plant it near your house, choose a spot well clear of the power lines that supply your electricity.
Q:Fastener type steel pipe scaffold accessories
Steel pipeScaffolding steel pipe should be used outside diameter 48mm, wall thickness of 3.5mm welded steel pipe, can also be used outside diameter 51mm, wall thickness of 3.1mm welded steel pipe. The maximum length of the steel pipe used for horizontal horizontal rod shall not be greater than 2m; the other rods shall not be more than 6.5m, and the maximum quality of each steel pipe shall not exceed 25kg, so as to be suitable for manual handling.
Q:What are the components of a mobile scaffolding
The utility model relates to a standard steel pipe scaffold which is connected with the main structure of the wall and is connected with the main structure of the building.
Q:Are there any biological examples of scaffolding in evolution?
The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
Q:A window washer weighing 700 N is standing on a scaffold supported by a vertical rope at each end. The scaffol?
The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
Q:What are the common rules for calculating the amount of scaffolding works
The independent brick (stone column) less than 3.60M in height, scaffold to construct the core column multiplied by the circumference of high calculation, the implementation of masonry scaffolding in the shelf; column 3.60M with column wise, the structure of the circumference of the core column height calculated by multiplying plus 3.60M, the implementation of masonry scaffolding outside the shelf (single row). Where masonry height exceeds 1.5m of the masonry are required to calculate the scaffolding.
Q:What are the requirements for the sampling inspection of scaffolding?
Inspection and acceptance of cantilever scaffold1 after the erection of the cantilever support, the scaffold is erected;2 before loading on the work layer;3 after each set of 10m height;4 after reaching the design height;5 in the case of more than six winds and heavy rain;6 use more than a month.Cantilever scaffold inspection document1 special construction plan and design documents;2 safety technical disclosure;3 the provisions of appendix D, table D.1.
Q:Specification and type of scaffold erection
Specification for scaffold erection(a) basic requirements1 important scaffolding must develop a construction plan, if necessary, to develop safety assurance measures. 2 more than 25m high scaffolding must adopt the fastener type steel tube scaffold, the single pole scaffolding height should be controlled within 50m; height of more than 50m of the scaffolding should be effective measures by a double pole, wire rope, cable stayed unloading segment, and additional design.3 the design of the scaffold shall meet the requirements of the project and shall indicate its use, maximum static load, maximum dynamic load andThe selected design parameters and structural parts shall not be lower than the existing national and industry related safety technical standards.4 scaffolding in the construction of the need to change the original structure, Gago (wide), to its use, etc., must be verified by the technical department, and the approval.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range