Scaffolding System Cross Brace with single coupler CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: FAS-DB

  • Surface: Galvanized

  • Material: High Strength Steel

  • Type: Diagonal Brace

  • Certification: CE

Scaffolding System Cross Brace with single coupler CNBM

Packaging & Delivery

Packaging Details:pallet

2.Product Description

Model No: FAS-DB

Product Name: Scaffolding System--Cross Brace With Single Coupler 

3.Feature:

1. Made of Φ48.3mm x 3.20mm thickness steel tube,

    Specification(mm): 2000(H)x2070/2570/3070(W) etc.

2. Surface: painted/cold (hot) dipped galvanized or to be order

3. Also can manufacture it as your requiremen

 4.

Ring   Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the measures in the rainy season? What precautions must be done?
pay close attention to weather forecast, do a good job in Taiwan flood prevention work, if necessary, should be reinforced in the construction of the project do a good job of building materials, rain and moisture work the construction site of the road, the facilities must be smooth drainage, as far as possible rain to stop the water, to prevent the ground water into the basement foundation, the basic project should do a good job slope anti-skid and anti-collapse in the rainy season before doing live housing, equipment, drainage and rain measures Ready to use the water pump and related equipment, prepare the right amount of plastic cloth, linoleum and other rain material encountered heavy rain should immediately stop the pouring of concrete, and has been pouring silicon parts of the plastic film covered all mechanical and electrical equipment to build the protective shed to be strong, and take rain, flood prevention measures, installation of grounding safety devices, electrical box leakage protection device must be sensitive and reliable, and often check the construction site of the tower crane, construction elevator, outside the scaffolding need to install lightning protection device, grounding resistance is not greater than 4Ω the rainy season construction to do a good job of anti-skid reinforcement work all mechanical equipment after the rain should first check whether the circuit is intact Dry and so on
Q:I need to know if these company is hiring scaffold builders Mobly Inc OKorder.com?
This company is hiring that company for those who buys them for that thing, from now and then!!
Q:A window washer drops a brush from a scaffold on a tall office building. What is the speed of the falling brush?
Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
Q:What is the bamboo board for the scaffolding of the building?
Scaffold board can be made of steel, wood, bamboo material, single scaffolding quality should not be greater than 30KG Construction site commonly used scaffold with stamping steel foot Shouban.
Q:Seeking construction machinery safety supervision papers can be greater than 100 words
Summary: With the national construction laws and regulations, the introduction of local laws and regulations, the construction of administrative departments in charge of supervision and supervision of the implementation of the project construction quality has improved significantly, but not with the Adapted to the safety management of the construction process has not been able to work with the quality of construction work to improve, vicious security incidents frequently
Q:would it be weird if the scaffold piercing was the only ear piecing i had?
I pierce lots of Industrials on young girls and half of them say its their first piercing! They look great on a plain ear, because they are such a large piercing its good to have ears that arent covered in piercings already because it starts to look too much when you have heaps of piercings in your ears. You just need to be dedicated to it as it can be difficult to heal, so make sure you have a really good think about it before you get it done.
Q:Seeking the Responsibility System of Safety Responsibility of Each Function Department
System, and to monitor the implementation of the situation
Q:Will the scaffolding steel pipe specifications are generally how much ah? What are the specifications?
scaffolding load shall not exceed 270kg / m
Q:Scaffold piercing care tips? Sleeping on it? Cleaning it Anything useful you've discovered besides the obvious?
Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
Q:Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
The following model for your reference, the project budget is to determine the project cost and work, material consumption of the document, is the basis for assessing the economic investment

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range