• Scaffolding System Accessories of Cuplock Scaffoldings with Low Price System 1
  • Scaffolding System Accessories of Cuplock Scaffoldings with Low Price System 2
  • Scaffolding System Accessories of Cuplock Scaffoldings with Low Price System 3
Scaffolding System Accessories of Cuplock Scaffoldings with Low Price

Scaffolding System Accessories of Cuplock Scaffoldings with Low Price

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
40 m.t
Supply Capability:
10000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Scaffolding System Accessories Cuplock Scaffoldings High Quality

Product pictures:

Scaffolding System Accessories of Cuplock Scaffoldings with Low Price

Scaffolding System Accessories of Cuplock Scaffoldings with Low Price

Scaffolding System Accessories of Cuplock Scaffoldings with Low Price

Product description:

Name:

Ringlock Scaffolding accessories

Category:

Scaffolding System

Material:

Steel (Q235/Q345)

Size:

D48*3.25mm, etc

Surface:

Electro Galvanized, Hot   Dipped Galvanized, Painted, Powder Coated

Component: 

Standard, Ledger, Diagonal   Brace, Bracket, Base Jack, U Head Jack, Etc.

Application:

Slab Support, Staircase,   Stage Plateforms, Bridge Support, Mobile Tower, etc.

Manufacturer:

OEM is Available

Items or goods can be   manufactured according to your standards.

Advantage

* Good loading capacity

* Easy to assemble and dismantle

* Excellent quality for formwork & scaffolding with wide choices

Other scaffolding & formwork products:

(1)   Scaffolding System

(2)   Scaffolding Frame & Accessories

(3)   Scaffolding Couplers/Clamps

(4)   Formwork System Scaffolding & Accessories

Company introduce and advantages:

1. A state-owned company, prestige fi rst.
2. One of Fortune 500 companies in the world. No. 5 in the building material fi eld.
3. In line with the business, we launched E-business platform Okorder.com.
4. We are highly recognized by our business partners and clients all over the world and has obtained rapid
development under the spirit of win-win.

FAQ

Why Us?

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Efficient  services in pre and after sale.

Full energy with affluent experience team. 

Q:Can you identify Scaffold Grade Aluminum tubing by looking at it.?
The grade or type of Aluminum Alloy materials can not be identified visually because they are almost all the same in appearance. Normally these materials are marked with there Alloy number or designation like, 6061- T6, at certain intervals so that users can distinguish them.
Q:What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
A set of how much money a day, of course, there are some monthly price calculation
Q:...and I'm not really sure what to expect. I know that everyones healing time and pain tolerence is different but just some personal storys would be nice. And before you say it I am aware that there are risks as there are risks with any piercing. so I'm 17 from London and wondering:How old do you have to be to get it done?Does anyone know a reputable place i can get it done?How much will it be?any experiences to share?
Hi I got it done a few months ago I love it! Its really not that sore at all just a slight nip and then bit warm afterwards lol! Only thing annoyed me was couldn't sleep on it for a while and that was always the side I slept on! I live in Belfast and you can get it done from about 16. I just went to a well known tattoo parlour and had no problems what so ever. Go for it looks great Good luck :D
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:I think that'd be extremely entertaining.
World Wrestling Entertainment has never done Scaffold Matches in it's 5 Decade Histrory. If you want to see Scaffold Matches, go buy tickets to an Independent Wrestling Show. WWE has no interest in hiring Necro Butcher. He doesn't have the Look that they want. WWE doesn't have any interest in New Jack. They've known about New Jack for 2 decades and haven't made any attempts or expressed any interest in signing him.
Q:So im a guyAnd I might get oneAnyone had one before/got one?Any advice?How much do they normaly cost?if you answer this i will love you forever :)
My industrial was the biggest nightmare piercing I've ever had. I just retired it a few weeks or so ago after waiting for it to heal for 13 months. They usually take between 6 and 12 months to heal. It never healed completely. I got keloids on the inside and outside of both holes and they looked absolutely terrible. I was actually embarrassed when people asked to see my piercing. I couldn't sleep or use the phone or use headphones on that side of my head. Changing the jewelry to titanium only made it worse (and titanium usually does wonders in my piercings). It was the most finicky and miserable piercing I have ever had. Mine was not done with one needle. That is an improper piercing technique. The second hole does hurt like heck, though. Also, don't over-clean it. Twice a day is sufficient. Sea salt soaks are amazing, too!
Q:what happened when author dimmesdale went to the scaffolding in town square?
Which time? The first time he went there at night, admits his sin, mets up with Hester Prynne and Pearl, and an A appears in the sky. The second time, Arthur Dimmesdale reveals this secret to the public. He then has a heart attack on the scaffold and dies.
Q:how did they turn the cells into a polymer for the heart scaffold ?
May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords