Product Description:

SPECIFICATIONS:

1 MATERIAL:Q235

2 SWIVEL AND DOULE RIGHT ANGLE COUPLER

3 DROP FORGED AND PRESSED

4 BS1139 AND EN74 STANDARD

5 SIZE:48.3*48.3MM

6 PRESSED AND DROP FORED SWIVEL AND FIXED COUPLER/PUTLOG COUPLER/SLEEVE COUPLER/INNER CONNECTOR/BEAM COUPLER ETC.

Pressed swivel coupler 1.02kg  galvanized/ hot dipped galvanized

Pressed fixed coupler  0.85kg  galvanized / hot dipped galvanized

DROP FORGED SWIVEL COUPLER   0.98kg       galvanized / hot dipped galvanized

DROP FORGED SWIVEL COUPLER   1.12kg  

DROP FORGED PUT LOG COUPLER  0.62KG    galvanized / hot dipped galvanized

 SLEEVE COUPLER     1.0KG    galvanized / hot dipped galvanized

DROP FORGED  FIXED BEAM COUPLER     1.45KG    galvanized / hot dipped galvanized

DROP FORGED SWIVEL GRINDER COUPLER     1.5KG    galvanized / hot dipped galvanized

7  SUITABLE FOR PIPE DIAMETER:48MM,48.3MM,60.3MM

8 Payment terms:30%TT deposit, balance against BL copy or LC at sight

9 FOB .CIF.C&F ,CFR acceptable

10 Delivery time;20-30days after receiving deposit


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:A window washer weighing 700 N is standing on a scaffold supported by a vertical rope at each end. The scaffol?
The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
Q:What are the main safety problems when dismantling the scaffold
5, all construction materials must be set according to the material classification management requirements must be neatly stacked, "work finished, as material, the site is clean before work".6, on-site construction waste in a timely manner to clean up and deal with the designated place.7, scaffolding workers must be trained and qualified, safety examination, hold certificate to posts jiazigong.
Q:Compared to Pankou scaffolding and scaffolding have what distinction, what are the advantages
Pankou scaffolding and scaffolding to build shape is not the same, is not the same, the price is not the same1, Pankou scaffolding hot-dip galvanizing process, lasting up to 15 years of age or above.2, scaffolding, low cost, high efficiency, convenient disassembly and effort to build.
Q:What is the bowl buckle scaffolding, bowl buckle scaffold what are the characteristics
(c) the cross bar is made of welded joints of 48 mm x 3.5mm steel pipe with a certain length. Horizontal connecting rod for vertical rod, or horizontal bearing rod of frame;
Q:Key points for safety of portal scaffolding
The main points of the safety of portal scaffolding1, scaffold erection must be held by professional Jia Zigong, and according to the current national standard "special operations personnel safety assessment management rules" (GB5036) qualification certificates. Staff should conduct regular physical examination, which is not suitable for high operator, not on the scaffold.
Q:Scaffolding stuck, need ideas for removing.?
WD 40, angle grind off what you can.
Q:What are the safety requirements for the dismantling of construction scaffolding
(3) prior to the dismantling of scaffolding, the scaffolding should be retained on the material, debris and other clean, and should be removed by the removal of mechanical equipment, electrical and other pipelines, such as demolition, or to be protected.(4) the dismantling of the scaffolding should be unified command, should be approved by the construction plan, the requirements of the work instructions, from top to bottom in the order of the upper and lower levels are strictly prohibited demolition operations.
Q:Mobile scaffolding accessories prices
The price of each region is different, are you renting or buying?
Q:How old do you have to be to get a scaffold piercing in washington?
I'm pretty sure it's 16-17 with parental permission. I suggest looking up some of the shops in your area and seeing what they say. There usually isn't a set rule for it, every shop is different. Like some shops may refuse seeing, say, a 14 year old, whereas another shop might do it with the parent's permission. Then of course, once you hit 18, you can do whatever you want, lol.
Q:21M high full scaffold erection scheme
2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range