Product Description:

Quick Details

Place of Origin:
Guizhou China (Mainland)


Name:
construction props
Adjustable Size:
1600-2900,1800-3200,2000-3600,2200-4000mm
Thickness:
1.6,1.8,2.0,2.2,2.5,3.0mm
Finishment:
Dip Paintng, powder coated, galvanzied
MOQ:
for one20ft containe, 1800-2600pcs
Delivery Time:
20-30days after confirmation
Payment Term:
T/T
Business Type:
Manufacturer in Guangzhou
Color:
red, yellow, blue, green....
Location:
Guangzhou, China

Packaging & Delivery

Packaging Detail:In bundle or in bulk or as your request,normally in bulk can be loaded 1800-2500pcs for different size in one 20ft container.
Delivery Detail:10 to 30 days after order confirmation

Specifications

construction props
1)Manufacturer 10 years ;
2)OEM offered,
3)Formwork,beam,concrete,slab support,
4)Promptly delivery.

Nameconstruction props
Place of OriginGuangzhou China


SizeØ40- Ø48/Ø48- Ø56 or as your request
Main MaterialQ235, Q195
Surface TreatmentHigh Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized.
ColorSilver, red,orange
CertificateSGS,
ServiceOEM Service available
MOQ500pcs
PaymentT/T
Delivery Time10-30 days after confirmation
PackingIn bulk or steel pallet or as your request
Production capability200 tons per day



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to distinguish between the columns of single and double steel support
1, the post section is consistent with the single column brace. The upper and lower sections of the column are not consistent, and the lower column is supported.
Q:When to ask for formwork support
5, the column spacing determined by calculation, when using steel fasteners, spacing of less than 1m, the column joints should be staggered, different step distance and vertical joint spacing is larger than 50 cm.
Q:What are the requirements for acceptance of steel support
2, [GB 50011-2010] metal yield displacement energy dissipation device, such as the energy consumption can not be reused, in the same type of sampling number of not less than 2, sampling pass rate of 100%, after sampling can not be used for the main structure. Type inspection and factory inspection shall be completed by third parties.The design of [JGJ99-2010]E.5.1 3, the BRB should be based on the test results, the test should be at least two groups of components test, rotating connection requirement investigation support; another group to support the uniaxial test, to test the properties of support, especially the performance in tension and compression load lag repeatedly.
Q:How much is the glass floor cost. That's the kind of steel frame
The use of the environment, load-bearing, non slip performance, steel selection, etc.,
Q:The formwork of the steel concrete foundation is the 1 steel formwork steel support and the support of the 2 steel formwork
In theory, according to the actual use of the corresponding template template,General composite template,Steel formwork for irregular concrete,
Q:What is the maximum value of the support settlement on the beam
(!) in accordance with the "reinforced concrete beam" design specification for hydraulic concrete structures and the "standard methods for testing of concrete structures", produced a total of $reinforced concrete beam, the beam length! "'% & section size!' ($& $&& 'concrete labeling for the quantity of materials per * *). Party and relevant index table! + beam reinforcement figure! + molding, maintenance to $, reached the design strength requirements of concrete materials per square meter +! And related indexes of -./+! 0123456718 9:/29 15189; <98151 =.5182.>6;'., 2<, 1?; <98151 = 5419; each party (concrete materials A3 'B *) - @ index grade of cement cement fine aggregate coarse aggregate average compressive strength of @ CD. @ 9" slump "$" E F! "" GG! *G! H FHI% *J "$"! The reinforced concrete beam reinforcement figure K23+! LA1594; = 812<=; 1<5 = 891; < 8151 / 8.9; 1 'sticky ($) bonding agent
Q:How much space should be filled in the steel pipe support of 70cm thick ground floor?
The utility model has the advantages of high structure and material cost, easy aging, poor performance of the PVC tube and the problem of grounding, design and manufacture, etc., and is the patron saint of the electric wire and cable.
Q:Why subway steel support axial force value
The main reasons are as follows: 1. The deformation of foundation pit is too large;2, caused by high temperature;Generally, the foundation pit is supported by continuous wall (pile) and steel support. Support axial force monitoring, monitoring the foundation pit in the construction process of the support axial force changes, to avoid the bearing axial force beyond the design strength of the support failure caused by the instability of the whole support system.
Q:Steel beam, steel brace and steel purlin. What is the difference
Different steel beam, steel brace and steel purlin position, the strength of the material requirements are different, which plays in the role of different engineering.
Q:The construction scheme of the steel pipe support frame
The steel tube support frame is installed on the hanging basket and the common external wall construction and installation basket method. Only in the steel pipe bracket installation basket should pay attention to avoid the steel pipe bracket, to avoid the influence of the steel bracket of the electric basket rise and fall. Thus affecting the normal operation of the electric basket

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range