• Scaffolding Sleeve Coupler/External Joiner System 1
  • Scaffolding Sleeve Coupler/External Joiner System 2
  • Scaffolding Sleeve Coupler/External Joiner System 3
  • Scaffolding Sleeve Coupler/External Joiner System 4
Scaffolding Sleeve Coupler/External Joiner

Scaffolding Sleeve Coupler/External Joiner

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
100000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

Standard:
EN74,BS1139
Place of Origin:
Shandong, China (Mainland)
Finish:
Electro galvanized
Technic:
pressed
Item:
Scaffolding Sleeve Coupler/External Joiner
Size:
48.3mm
Material:
Q235
Model Number:
SD-1021A
Brand Name:
SD
Weight:
1.00KG

Scaffolding Sleeve Coupler/External Joiner

 

Product Description

 

 1.Item:      Scaffolding Sleeve Coupler/External Joiner

 2.size:48.3mm;

3.material :Q235;

4.standard : EN74,BS1139

5.ISO 9001:2000 is approved;

6.OEM service is available.

 

 

Commodity name

      Scaffolding Sleeve Coupler/External Joiner

Usage

Fixed Scaffold Pipe

Origin

China Mainland

Material

Q235

Process

Forging

Surface

Electro-galvanized

M.O.Q

2000PCS

Packing

Woven bags + steel pallet

Delivery time

20-25 days after order confirmation

Payment term

T/T, L/C, Western Union

Business type

Manufacturer and exporter

Certifications

SGS

Advantage

1.High Quality  2.Professional service 3.Competitive price

Notes

Special marks can be made according to customers requirements;


It is available to produce by customer drawing.

Main products

Different kinds of scaffold coupler, Ringlock scaffolding system, Cuplock Scaffolding System, Kwikstage scaffolding  system, shoring prop, formwork system, frame system, Accessories

Scaffolding Sleeve Coupler/External Joiner

                                               Scaffolding Sleeve Coupler/External Joiner

.jpg

                                                                      Scaffolding Sleeve Coupler/External Joiner


picture name surface treatmentweight
Scaffolding Sleeve Coupler/External JoinerSleeve coupler  electro galvanized 1.00kg
Scaffolding Sleeve Coupler/External JoinerSleeve coupler  electro galvanized1.20kg

  

 

Company Information

Scaffolding Sleeve Coupler/External Joiner

Scaffolding Sleeve Coupler/External Joiner

Scaffolding Sleeve Coupler/External Joiner

 

We are always focusing on to supply our value produce and best service to all our customers.

 


Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.(2) the surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep drawing.(3) anti rust paint for steel pipe. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
Q:What are the safety requirements for the dismantling of construction scaffolding
(1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
Q:Key points for safety of portal scaffolding
2, take off the scaffolding workers must wear a helmet, wearing a seat belt, wear non slip shoes.3, the construction load should meet the design requirements, shall not overload; shall not be stacked on the scaffolding template, steel and other objects. Prohibited in the scaffolding on the pull cable wind rope or fixed, erection of concrete pump, pump and lifting equipment etc..
Q:Erection of steel scaffolding tools and safety supplies
Anti falling device, professional tool bag, work boots (soft bottom shoes), safety lighting, transportation tools, pulley, skateboard rope, dustproof mask, special conjoined clothes, ear plugs
Q:Should the WWE put John Cena in a triple threat thumbtack scaffold cage of death with New Jack & Necro Butcher?
i sharted. PS: please purchase my new toilet hawaii chair
Q:what is the height of a scaffold if the person is 6ft tall?
Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
Q:I know people have different pain thresholds. But I was wondering if it was more painful than a lobe piercing? It will be done with a needle and are they aloud to freeze it? Or is it not needed?
Scaffold/Industrial piercings definately hurt more than a regular lobe piercings because it's in the cartilage area and its pierced at a larger gauge but the pain is bareable. On a scale of 1 to 10 (10 being the worst pain) I would say an Industrial would be anywhere from a 4-6 depending on your pain threshold. Freezing it probably wouldn't be nessesssary. I got a 14g Industrial pierced on one ear and a 16g helix on the other both on the same day (the industrial was done first) and in my opinion the 16g helix hurt more. So it really depends on how well you tolerate pain
Q:How to remove the disc scaffolding ah, do not know how to get through the decoration
First, in the demolition of the mobile frame should pay attention to the partner can not be replaced, it is better to slow down or stop work, do not have the experience of the construction personnel to carry out the demolition work.
Q:If I know the length , width and height of the area for the scaffold, how do I calculate the tonnage?
tonnage is related to the volume of a certain material to be used in a certain project... so as to volume, tonnage is just the volume of the material to be used, given the specifiations in this case, scaffolds. consult your design and count the distribution of the scaffolds to be used.. average ratio of scaffolding tonnage is a ton per 10 square meter... also depends on the quantity of the project.
Q:Every time someone in medieval times was murdered by the beheading a new scaffold was built for the next prisoner.
Well that's not entirely true; they didn't ALWAYS built a new scaffold. Probably movies let you think so but that was not the case.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords