Scaffolding Scaffolding System Formwork System Formwork Steel Props

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2 m.t
Supply Capability:
1000 m.t/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

High Quality Scaffolding Scaffolding System Formwork System Formwork Steel Props


Product pictures:

Scaffolding Scaffolding System Formwork System Formwork Steel Props


Scaffolding Scaffolding System Formwork System Formwork Steel Props

Scaffolding Scaffolding System Formwork System Formwork Steel Props

Product description:

* Good loading capacity

Advantage

* Easy to assemble and dismantle

* Customized solution helps you work safe, save cost and convenient

* our focus on building deep long-lasting relationship with our customers.

* our commitment to meet customers needs.



Other scaffolding & formwork products:

(1)   Scaffolding Frame & Accessories:

Including Walk Through Frame Scaffolding; Ladder Frame Scaffolding; Accessories; we also can make scaffolding according to your samples or drawings.

(2)   Scaffolding Couplers/Clamps:

We can produce all kinds of forged and pressed couplers, including British type couplers, American type couplers, German type couplers, Italian type couplers ,fence couplers, BRC coplers and so on. We also can produce according to your drawings or samples.

(3)   Formwork System Scaffolding & Accessories:

Light Duty Shoring prop and Heavy Duty Shoring Prop; Wing nuts and Tie rods; RASTO clamp and so on.

FAQ

Why Us?

We are one of the largest construction materials suppliers in China.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I am looking to buy storage tank building tools like bull pins, u-bars,keyplates,and scaffold someone HELP?
Check with Home Depot or Lowes. you can usually find what you need there.
Q:I would like to inquire cup lock system scaffolding, how much time per square meter and manpower to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q:Will the scaffolding steel pipe specifications are generally how much ah? What are the specifications?
Scaffolding erection specifications are as follows, if you want to do more understanding, then please look carefully Oh, a lot of content, looks a bit boring
Q:a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
Its 3 seconds high, but you would need to know how heavy the paintbrush is, could be as heavy as an anvil dropping from a building. (The scaffold would be as tall as the building)
Q:A 531 N window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 3?
(332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
Q:Seeking the Responsibility System of Safety Responsibility of Each Function Department
System, and to monitor the implementation of the situation
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
Q:What is the vertical transport of construction and the high increase in fees
The vertical transportation fee is a special item in the construction industry
Q:Can the fifteen typhoon blow up the three - storey house?
Strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
Q:Construction technology measures fee is directly into the sub - project costs
Construction technology measures fee is not directly into the sub-project costs, because the construction technology measures fees are measures fees rather than sub-project costs, measures fees, refers to the completion of the project construction, occurred in the construction and construction The cost of non-engineering entity projects during the process consists of construction technical measures and construction organization measures

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range