Scaffolding Prop Steel Pipe

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Guizhou China (Mainland)
Brand Name:
SM
Name:
construction props
Adjustable Size:
1600-2900,1800-3200,2000-3600,2200-4000mm
Thickness:
1.6,1.8,2.0,2.2,2.5,3.0mm
Finishment:
Dip Paintng, powder coated, galvanzied
MOQ:
for one20ft containe, 1800-2600pcs
Delivery Time:
20-30days after confirmation
Payment Term:
T/T
Business Type:
Manufacturer in Guangzhou
Color:
red, yellow, blue, green....
Location:
Guangzhou, China

Packaging & Delivery

Packaging Detail:In bundle or in bulk or as your request,normally in bulk can be loaded 1800-2500pcs for different size in one 20ft container.
Delivery Detail:10 to 30 days after order confirmation
Nameconstruction props
Place of OriginGuangzhou China
Brand nameShuangma
SizeØ40- Ø48/Ø48- Ø56 or as your request
Main MaterialQ235, Q195
Surface TreatmentHigh Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized.
ColorSilver, red,orange
CertificateSGS,
ServiceOEM Service available
MOQ500pcs
PaymentT/T
Delivery Time10-30 days after confirmation
PackingIn bulk or steel pallet or as your request
Production capability200 tons per day



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:7.5 square meters of toughened glass floor C steel support costs about how much
It depends on how much you use thick tempered glass, are generally made of 12 mm tempered glass floor
Q:Embedded dislocation, steel support how to put? Metro Shield Construction
Estimates also corrected the past, relatively short, only to change the location of the bolt hole.
Q:How to strengthen the steel support with shear wall
The main material for cold rolled steel, with adjustable regulation. Construction is very convenient and easy to use
Q:How much should be the concrete strength of the main structure of the steel support to carry out the construction
The concrete strength of the side wall of the main structure needs to reach 75% of the design strength
Q:What are the safety measures of steel support construction
Improve the system, strengthen management, to solve the construction of the following work and problems: 1, regulate the side of the entrance and exit protection. Pay attention to wear safety helmet and high operating safety belt; according to the provisions of the use of qualified safety nets, safety helmets and seat belts
Q:For the deep foundation pit supporting steel purlin supporting scheme of a
The steel sheet pile is inserted into the steel sheet pile: the first pile is inserted into the continuous steel sheet pile and is inserted into the design depth of the steel sheet pile supporting system of the foundation pit along the front pile buckle grooveSteel plate pile construction setting allow error: pile top elevation deviation + 100mm steel plate pile axis deviation + + 100mm steel plate pile verticality deviation 1%; should be monitored in the allowable error rangeSteel plate piles with steel sheet pile, pile deviation, making itself the error limitation of construction to ensure the actual degree of steel sheet pile curtain according to the standard width of the integer times of steel sheet pile curtain end closed up by the difficulty of adjustment phase do like profiled steel sheet pile closure or through adjusting curtain axis using standard pile to achieve closure due to the engineering precision of sheet pile wall the realization of high angle closure of the corner on both sides of the 10 sheet pile width adjustment axis to achieve closure is Department of steel sheet pile by welding of foot like fish plates for welding to avoid two adjacent pile connected with the depth of 1M and the appropriate position should be connected to the wrong place pile spacing
Q:The transformation of the old house can support it with channel beam below
According to the channel shape and can be divided into 4 kinds: cold bending equilateral channels, cold-formed non equilateral channel steel, cold rolled edge channels, the cold bending edge channelsIn accordance with the theory of steel structure, it should be the channel wing plate stress, that is, the channel should be standing, rather than lying.
Q:Advantages and disadvantages of foundation pit support and subway steel support
There are various types of support in the foundation pit, such as steel pipe support, reinforced concrete support, support plate, steel, etc.
Q:Steel support can stay in the wall joint position, if not, then why?
The jet grouting pile is in even after the end wall construction construction, for fear of even the construction of wall joints is not perfect, there Water Leakage seams and other quality problems, in the wall at the seams (outside the foundation) to reinforce, most of the time without the need for jet grouting pile construction.
Q:What is the steel plate support
The steel pipe support system comprises a support rod system and a subsidiary component part, wherein the supporting rod system comprises a main rod, a movable end and a fixed end

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range