Scaffolding Prop Pin with Nut Q235 with Different Surface Treatment

Ref Price:
$0.48 / kg
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of Scaffolding Prop Pin with Nut

Scaffolding Prop Pin is Scaffolding parts, Material is Q235 steel,using with prop sleeve for adjustable. Surface Finish: natural colour or zinc plate or painting or others.

Sizes: dia 10mm, 12mm, 14mm, 16mm, 18mm

Packing: in bags

OEM service as available

Samples we can offer

2.Scaffolding Prop Pin with Nut advantages:

Using with prop sleeve for adjustable

3. Scaffolding Prop Pin with Nut Products pictures:

Scaffolding Prop Pin with Nut Q235 with Different Surface Treatment

4. Scaffolding Prop Pin with Nut Specification:

1) Surface: natural,galvanizing,or painting
2) Sizes as per customer demand
3) Prop's parts
4) Samples are available

5.FAQ

 We have organized several common questions for our clients, may help you sincerely:

1) How is the Packaging Details?

In bags or as the requirement of customers.

2) How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
Q:What are the full house scaffolding specification
Preparation of "full house scaffolding construction plan" according to the specification including but not limited to the following:1 "steel pipe scaffold fastener" (GB15831-2006)2 "technical code for safety of high level construction work" (JGJ80-1991)3 "technical code for safety of scaffold for building construction" (JGJ202-2010)4 "code for safety of steel tubular scaffold with couplers in construction" (JGJ130-2001)
Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
Classification of steel pipe scaffoldThe domestic steel pipe scaffold material production with steel tubular scaffolding, bowl button steel scaffolding, socket type steel pipe scaffolding, scaffolding doors, and every kind of the scaffolding, hanging scaffold steel pipe scaffolding and other materials. Proceed from its material and structure, and can be roughly divided as follows:
Q:What are the safety requirements for the dismantling of construction scaffolding
(3) prior to the dismantling of scaffolding, the scaffolding should be retained on the material, debris and other clean, and should be removed by the removal of mechanical equipment, electrical and other pipelines, such as demolition, or to be protected.(4) the dismantling of the scaffolding should be unified command, should be approved by the construction plan, the requirements of the work instructions, from top to bottom in the order of the upper and lower levels are strictly prohibited demolition operations.
Q:21M high full scaffold erection scheme
2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
Q:Can anyone give me a detailed design of a simple scaffolding?
can't draw here, but it's just an x with a flat board on top in 3 dimensions.
Q:What are the requirements for the construction of the scaffolding structure?
One of the platforms has access to the lower part of the scaffolding structure. The scaffold structure also includes a ladder that is mounted to the scaffold for the worker to pass through the opening. And the scaffold structure comprises a fixed to additional bamboo grid frame, the frame of the gate is composed of an outer bearing component and a bamboo piece composed of bearing components within the compartment is smaller than the grid spacing
Q:whats the symbolic significance of the scaffold, the rosebush, and pearl in the book THE SCARLET LETTER?
I dont think she explained the rose bush very well. i think that it refers to Good and bad. Good being the rose and bad being the thorns Hester said in the book that she picked Pearl off a rose bush. Hester loves pearl but also fears her
Q:Find the demolishing scheme of scaffold
Removal of scaffolding shall comply with the following requirements:11.2.1 removal operations must be carried out from top to bottom, prohibited from top to bottom operation at the same time;11.2.2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the dismantling of scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the 2 step, should be added to strengthen the wall;
Q:Erection of steel scaffolding tools and safety supplies
Wrench, hammer, wrench, short scaffolding level and a folding rule

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range